Professional Documents
Culture Documents
l/s.m²
CP 1 0
CP 2 0
Cross CP 3 0
passage CP 4 0
Area (CP) CP 5 0
[2]
CP 6 0
CP 7 0
CP 8 0
Kin.
Temp. Density Roughness
Viskosity
t [°C] ν [m²/s] ρ [kg/m³] k [m]
20 1.51E-05 1.20 0.00015
Rectangular Duc
Q
[m³/h] [h-1] [m³/h] [m³/h] [m³/s] Q [m3/s] d [mm] B [mm]
[m3/h]
0 2 0 0 0.00 0.00
0 2 0 0 0.00 0.00
0 2 0 0 0.00 0.00
0 2 0 0 0.00 0.00
0 2 0 0 0.00 0.00
0 2 0 0 0.00 0.00
0 2 0 0 0.00 0.00
0 2 0 0 0.00 0.00
Elements Design velocity (m/s) Info:
Main branches 6-8
Values should be entered only in the field
Primary branch 5.0 Maximum
Secondary branch 2.0 – 3.5
If rectangular ducts, height and width mu
pressure diameter will be calculated), otherwise cir
Distrib. branches (between rooms) 4 - gradient
6 entered.
R = 1 Pa/m
Distrib. branches to the rooms 2- 4 Diameters are determined based on max
Plenum 3.0 – 4.0 gradient of 1 Pa / m: Air temperature, vis
Cooling coils 2.5 temperature) and roughness can be enter
Eksempel diagram: (Komfo
Rectangular Duct Linear Pressure losses
Air
Area Hight Volume
Areas/Spaces
[m²] [m] [m³]
l/s.m²
Q
[m³/h] [h-1] [m³/h] [m³/h] [m³/s] CFM lps Q [m3/s]
[m3/h]
0.0 0.0 0
0.0 0.0 0
0.0 0.0 0
0.0 0.0 0
0.0 0.0 0
0.0 0.0 0
0.0 0.0 0 LINDAB - SR
0.0 0.0 0
d roughness can be entered.
Eksempel diagram: (Komfortventilatio, DTU BYG 2005) Komfortventilatio, DTU BYG 2005
Q (m3/s) 0.488
Q (L/S) 488
Q (m3/h) 1756
Equipment Schedule
S. no Equipment Tag Space served Airflow (m3/h) ESP (Pa) Voltage Phase Power consumption (Watt) ApplicationConfigration Remark
1 Low Point Sump 1000 230 1 Exhaust Working Explosion Proof
2 Low Point Sump 1000 230 1 Exhaust Standby Explosion Proof
3 Foam Room +Sump access +Technical Corridor A 900 230 1 Supply Working -
4 Foam Room +Sump access +Technical Corridor A 900 230 1 Supply Standby -
5 Foam Room +Sump access+Technical Corridor A 900 230 1 Exhaust Working -
6 Foam Room +Sump access+Technical Corridor A 900 230 1 Exhaust Standby -
7 TR1+TR2 2058 230 1 Exhaust Working -
8 TR1+TR2 2058 230 1 Exhaust Standby -
9 Low Point Pump room+Technical Corridor B+TR1+TR2 5616 230 1 Supply Working -
10 Low Point Pump room+Technical Corridor B+TR1+TR2 5616 230 1 Supply Standby -