Professional Documents
Culture Documents
Embankment
0.6
2-1
2-1
0.5
36.
WEEP HOLES 16mmØ Deformed.
75MM Ø PVC PIPES Tie Bar
WEEP HOLES
GROUTED 75MM Ø PVC PIPES
RIPRAP
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud TYPICAL ROADWAY 7
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
PREPARED:
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur SECTION ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
W
PLAN OF ROAD
SCALE: 1:1000
NW
SW
N
START OF PROJECT
STA. 0+000.00
NE
SE
BENCHMARK
ON NAIL BENCHMARK
ELEV = 5.04 m. ON NAIL 105.80m
E
ELEV = 5.02 m.
000
STA 0+
020
98.23m
PC: 0+246.51
STA 0+
040
BENCHMARK
STA 0+
ON NAIL
060
END OF
STA 0+240
PT: 0+140.71
STA 0+
STA 0+220
080
STA 0+200
PROJECT
STA 0+180
PC: 0+
60
STA 0+
STA 0+160
0+2
STA 0+140
STA 0+120
STA. 0+290.50
STA
P.I
59
.2
0.
27
: 0+
PT
P.I.
2
0
28
0+
P.I. 1
A
ST
13
328.44
.
01
P.I. 1
+3
:00
PC+30
PT: 0+
0
0
A
STA 0+32
ST
Curve Table: Alignments
P.I. 3
P.I. 1 0+119.55 167.83 8.60 200.00 21.32 42.40 0+098.23 0+140.71
MATC
P.I. 4 0+458.88 173.97 8.60 200.00 10.54 21.04 0+448.35 0+469.40
PROFILE
HLINE
SCALE: 1:1000
2
SUPERELEVATION
7m 26.7 7m
26.7 7m 26.7
m 4.67
4.67 m
2.33 2.m
ENC0+270.21
BNC0+301.51
ENC0+081.90
BNC0+157.04
ENC0+215.58
m
BFS0+258.51
31
BFS0+102.90
EFS0+136.04
EFS0+258.59
2.33 m 2.31 2.31 m
0+140.71
0+222.51
0+079.56
0+088.90
0+095.90
0+098.23
0+143.04
0+150.04
0+159.37
0+229.43
0+231.74
0+267.90
0+277.13
0+284.06
0+285.36
0+286.36
0+287.67
0+303.82
0+213.28
0+294.59
m 7.00 m m 6.92
7.00 m 6.92 6.92 m
m 7.00 m m 6.92
7.00 m 6.92 6.92 m
m 2.33 m 2.33 m 2.31 m 2.31 m 2.31
2.33 m
4.67 2.33 m 2.31 m 2.31 2.m31 m
m
m 4.67
26.7 7m 26.7
7m 26.7 7m
PROPOSED ROAD
EXISTING ROAD
ELEVATION
ELEVATION
4.81
4.81
4.51
4.71
4.41
4.21
4.61
4.52
4.02
4.62
4.79
4.67
4.78
4.69
4.77
4.40
4.75
4.74
4.59
4.73
4.74
4.70
4.69
4.45
4.67
4.66
4.37
4.65
4.24
4.63
3.45
3.43
STATIONS 0+000 0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+160 0+180 0+200 0+220 0+240 0+260 0+280 0+300
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud PLAN AND PROFILE 11
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
PREPARED:
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur OF ROAD ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+020.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.79
ELEV=4.75
ELEV=4.75
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+20.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
0.50 2.50 2.50 0.50
Grouted Riprap (Class A)
5 -1.5% -1.5% -1.5% -1.5% 5
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+000.00
10 10
9 9
8 8
MATERIALS AT STATION 0+0.00 AREA
OFFSET=-3.00
OFFSET=0.00
OFFSET=3.00
ELEV = 4.81
ELEV = 4.76
ELEV = 4.76
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50
5 -2.0% -1.5% 1.5% 1.5% 5
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 15
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+060.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.77
ELEV=4.72
ELEV=4.72
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+60.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.69
0.8
0
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+040.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.78
ELEV=4.74
ELEV=4.74
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+40.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.71
0.7
4
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 16
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+090.40
10 10
9 9
8 8
ELEV=4.76
OFF=0.00m
OFF=3.00m R
ELEV=4.75
ELEV=4.70
OFF=3.00m L
MATERIALS AT STATION 0+90.40 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Stone Masonry
0.50 0.50 2.50 2.50 0.50 0.50
OFFSET=-3.50 OFFSET=3.50
5 -1.5% -1.5% -0.1% -0.1% 5
ELEV = 4.99 ELEV = 5.03
0.51 M
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+080.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.75
ELEV=4.71
ELEV=4.71
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+80.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.68
0.7
8
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 17
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+120.00
10 10
9 9
8 8
ELEV=4.82
OFF=3.00m R
OFF=0.00m
ELEV=4.73
ELEV=4.64
OFF=3.00m L
MATERIALS AT STATION 0+120.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -3.0% 3.0% 3.0% 5
-3.0%
0.6
2
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+100.00
10 10
9 9
8 8
ELEV=4.81
OFF=3.00m R
OFF=0.00m
ELEV=4.74
ELEV=4.67
OFF=3.00m L
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 18
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+160.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.70
ELEV=4.65
ELEV=4.65
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+160.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.62
0.7
7
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+140.00
10 10
9 9
8 8
MATERIALS AT STATION 0+140.00 AREA
OFFSET=3.50
OFFSET=0.00
OFFSET=-3.00
OFFSET=3.00
ELEV = 4.74
ELEV = 4.71
ELEV = 4.67
ELEV = 4.67
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
0.50 2.50 2.50 0.50 0.50 Grouted Riprap (Class A)
5 -2.0% -1.9% -1.9% -1.9% 5
1.0
2
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 19
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+200.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.67
ELEV=4.63
ELEV=4.63
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+200.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% 5
OFFSET=3.50
ELEV = 4.60
1.0
4 4
3
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+180.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.69
ELEV=4.64
ELEV=4.64
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+180.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% 5
OFFSET=3.50
ELEV = 4.61
0.9
3
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 20
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+240.00
10 10
9 9
8 8
ELEV=4.76
OFF=3.00m L
OFF=0.00m
ELEV=4.65
MATERIALS AT STATION 0+240.00 AREA
ELEV=4.53
OFF=3.00m R
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Stone Masonry
OFFSET=-3.50 0.50 0.50 2.50 2.50 0.50 0.50
OFFSET=3.50
5 3.8% 3.8% -3.8% 5
ELEV = 5.01 -3.8%
ELEV = 4.85
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+220.00
10 10
9 9
8 8
OFF=0.00m
ELEV=4.66
ELEV=4.61
ELEV=4.64
OFF=3.00m L
OFF=3.00m R
MATERIALS AT STATION 0+220.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -0.5% -0.5% -1.5% -1.5% 5
OFFSET=3.50
ELEV = 4.58
1.0
4 4
4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 21
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+280.00
10 10
9 9
8 8
ELEV=4.71
OFF=3.00m L
ELEV=4.64
OFF=3.00m R
OFF=0.00m
ELEV=4.62
MATERIALS AT STATION 0+280.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
0.50 0.50 2.50 2.50 0.50 0.50
Grouted Riprap (Class A)
5 3.2% 3.2% 0.6% 0.6% OFFSET=3.50 5
OFFSET=-3.50
ELEV = 4.67
6
ELEV = 4.51
0.9
1.2
4 4
4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
0+260.00
10 10
9 9
8 8
ELEV=4.86
= 4.81 L
OFF=0.00m
ELEV=4.63
OFF=3.00m
ELEV=4.41
OFF=3.00m R
7 7 Unsuitable Excavation
ELEV
ELEV = 4.40
0.8
4 4
9
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 22
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+290.50
10 10
9 9
8 8
MATERIALS AT STATION 0+290.00 AREA
OFFSET=3.00
OFFSET=3.50
ELEV = 4.76
ELEV = 4.73
OFFSET=0.00
ELEV = 4.61
OFFSET=-3.00
OFFSET=-3.50
ELEV = 4.46
ELEV = 4.43
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 0.50 0.50 2.50 2.50 0.50 0.50
5 -5.1% -5.1% 5
-5.1% -5.1%
0.4
0
3
0.9
4 4
3 3
2 2
1 1
0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 23
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
2440
90
70
CONSTRUCTION OF (Name of Project and Location)
30
50
CONTRACTOR :
30
50
DATE STARTED :
30
50
CONTRACT COMPLETION :DATE
30
50
CONTRACT COST :
30
50
IMPLEMENTING OFFICE :OF/ CONTACT No.
1220 50
SOURCES OF FUND :
170
30
60
DEPARTMENT OF
40
60
PUBLIC WORKS AND HIGHWAYS
30
50
TEXT 2920 or call (02)165-02 for any concern on this project
50
www.dpwh.gov.ph
40 320
REFER TO:
1200
1200
50 X 50 HORIZONTAL
COCO LUMBER (TARPAULIN ON 1200 x 2400 x 5
MARINE PLYWOOD)
50 x 75 VERTICAL
COCO LUMBER 50 x 50 WOODEN
50 x 50 WOODEN
1000
1000
STAKE
STAKE
EDGE OF ROAD
GROUND LEVEL
TRAFFIC DIRECTION
500
500
ROAD
ORIENTATION
TYPICAL FRAME ELEVATION FRONT ELEVATION
BILLBOARD FRAME
(NTS, ALL DIMENSION ARE IN MILLIMETERS)
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud BILLBOARD 24
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
PREPARED:
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur SPECIFICATION ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II