REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION V
CAMARINES SUR SECOND DISTRICT ENGINEERING OFFICE
BARAS, CANAMAN, CAMARINES SUR

C.Y. 2020 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION OF TINALMUD NUEVO - TINALMUD VIEJO
ROAD, LIBMANAN, CAMARINES SUR
STATION 0+000 TO STATION 0+290.50
NET LENGTH = 6.200 LANE KM.

SUBMITTED: RECOMMENDED: APPROVED:

ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS, JR.


CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:
TYPICAL CROSS-SECTION (C)
SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER
0.50 0.50 2.50 2.50 0.50 0.50
2.0% 1.5% 1.5% 2.0%

Embankment

Aggregate Subbase Course


STONE thickness = 0.20 m.
MASONRY
PCC PAVEMENT (Unreinforced) SEE STONE
thickness = 0.15 m.
MASONRY DETAILS

PCC PAVEMENT (Unreinforced)


thickness = 0.15 m. Reinforced Concrete Pipe Culvert

Aggregate Subbase Course


thickness = 0.15 m.

TYPICAL CROSS-SECTION (D)


SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER
0.50 0.50 2.50 2.50 0.50 0.50
2.0% 1.5% 1.5% 2.0% SEE GROUTED
RIPRAP DETAILS
.22

0.6
2-1

2-1
0.5

36.
WEEP HOLES 16mmØ Deformed.
75MM Ø PVC PIPES Tie Bar
WEEP HOLES
GROUTED 75MM Ø PVC PIPES
RIPRAP

PCC PAVEMENT (Unreinforced) Aggregate Subbase Course


thickness = 0.15 m. thickness = 0.20 m.

Aggregate Subbase Course PCC PAVEMENT (Unreinforced)


thickness = 0.15 m. thickness = 0.15 m.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud TYPICAL ROADWAY 7
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
PREPARED:
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur SECTION ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
W
PLAN OF ROAD
SCALE: 1:1000

NW
SW

N
START OF PROJECT
STA. 0+000.00

NE
SE
BENCHMARK
ON NAIL BENCHMARK
ELEV = 5.04 m. ON NAIL 105.80m

E
ELEV = 5.02 m.

000
STA 0+

020
98.23m

PC: 0+246.51
STA 0+

040
BENCHMARK

STA 0+
ON NAIL

060
END OF

STA 0+10 098.23


ELEV = 4.87 m.

STA 0+240
PT: 0+140.71
STA 0+

STA 0+220
080

STA 0+200
PROJECT

STA 0+180
PC: 0+

60
STA 0+

STA 0+160

0+2
STA 0+140
STA 0+120
STA. 0+290.50

STA
P.I

59
.2

0.
27
: 0+
PT
P.I.
2

0
28
0+
P.I. 1

A
ST

13

328.44
.
01
P.I. 1

+3
:00
PC+30

PT: 0+
0

0
A

STA 0+32
ST
Curve Table: Alignments

P.I. No. STATION I D R T LC PC PT 30.54m


MATCHLINE

P.I. 3
P.I. 1 0+119.55 167.83 8.60 200.00 21.32 42.40 0+098.23 0+140.71

P.I. 2 0+259.24 134.01 60.00 30.00 12.73 23.44 0+246.51 0+270.59

P.I. 3 0+315.81 127.86 60.00 30.00 14.68 26.37 0+301.13 0+328.44


.3
P.I

MATC
P.I. 4 0+458.88 173.97 8.60 200.00 10.54 21.04 0+448.35 0+469.40
PROFILE

HLINE
SCALE: 1:1000

5 PROPOSED ROAD ELEVATION (g = -0.07%)


ELEVATION

2
SUPERELEVATION

7m 26.7 7m
26.7 7m 26.7

m 4.67
4.67 m
2.33 2.m

ENC0+270.21

BNC0+301.51
ENC0+081.90

BNC0+157.04

ENC0+215.58
m

BFS0+258.51
31
BFS0+102.90

EFS0+136.04

EFS0+258.59
2.33 m 2.31 2.31 m

0+140.71

0+222.51
0+079.56

0+088.90

0+095.90

0+098.23

0+143.04

0+150.04

0+159.37

0+229.43

0+231.74

0+267.90

0+277.13

0+284.06
0+285.36
0+286.36
0+287.67

0+303.82
0+213.28

0+294.59
m 7.00 m m 6.92
7.00 m 6.92 6.92 m
m 7.00 m m 6.92
7.00 m 6.92 6.92 m
m 2.33 m 2.33 m 2.31 m 2.31 m 2.31
2.33 m
4.67 2.33 m 2.31 m 2.31 2.m31 m
m
m 4.67

26.7 7m 26.7
7m 26.7 7m
PROPOSED ROAD

EXISTING ROAD
ELEVATION

ELEVATION

4.81
4.81

4.51

4.71

4.41

4.21

4.61
4.52

4.02

4.62
4.79
4.67

4.78
4.69

4.77
4.40

4.75

4.74
4.59

4.73
4.74

4.70

4.69
4.45

4.67

4.66
4.37

4.65
4.24

4.63

3.45

3.43
STATIONS 0+000 0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+160 0+180 0+200 0+220 0+240 0+260 0+280 0+300

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud PLAN AND PROFILE 11
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
PREPARED:
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur OF ROAD ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+020.00
10 10

9 9

8 8

OFF=0.00m
ELEV=4.79
ELEV=4.75

ELEV=4.75
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+20.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
0.50 2.50 2.50 0.50
Grouted Riprap (Class A)
5 -1.5% -1.5% -1.5% -1.5% 5

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+000.00
10 10

9 9

8 8
MATERIALS AT STATION 0+0.00 AREA
OFFSET=-3.00

OFFSET=0.00

OFFSET=3.00
ELEV = 4.81
ELEV = 4.76

ELEV = 4.76
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50
5 -2.0% -1.5% 1.5% 1.5% 5

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 15
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+060.00
10 10

9 9

8 8

OFF=0.00m
ELEV=4.77
ELEV=4.72

ELEV=4.72
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+60.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.69

0.8
0
4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+040.00
10 10

9 9

8 8
OFF=0.00m
ELEV=4.78
ELEV=4.74

ELEV=4.74
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+40.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.71
0.7
4

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 16
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+090.40
10 10

9 9

8 8

ELEV=4.76
OFF=0.00m

OFF=3.00m R
ELEV=4.75
ELEV=4.70
OFF=3.00m L
MATERIALS AT STATION 0+90.40 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Stone Masonry
0.50 0.50 2.50 2.50 0.50 0.50
OFFSET=-3.50 OFFSET=3.50
5 -1.5% -1.5% -0.1% -0.1% 5
ELEV = 4.99 ELEV = 5.03

0.51 M
4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+080.00
10 10

9 9

8 8
OFF=0.00m
ELEV=4.75
ELEV=4.71

ELEV=4.71
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+80.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.68
0.7
8

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 17
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+120.00
10 10

9 9

8 8

ELEV=4.82
OFF=3.00m R
OFF=0.00m
ELEV=4.73
ELEV=4.64
OFF=3.00m L
MATERIALS AT STATION 0+120.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -3.0% 3.0% 3.0% 5
-3.0%

0.6
2
4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+100.00
10 10

9 9

8 8

ELEV=4.81
OFF=3.00m R
OFF=0.00m
ELEV=4.74
ELEV=4.67
OFF=3.00m L

MATERIALS AT STATION 0+100.00 AREA


7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -2.4% -2.4% 2.4% 2.4% 5
0.6
3

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 18
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+160.00
10 10

9 9

8 8

OFF=0.00m
ELEV=4.70
ELEV=4.65

ELEV=4.65
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+160.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% OFFSET=3.50 5
ELEV = 4.62

0.7
7
4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+140.00
10 10

9 9

8 8
MATERIALS AT STATION 0+140.00 AREA

OFFSET=3.50
OFFSET=0.00
OFFSET=-3.00

OFFSET=3.00

ELEV = 4.74
ELEV = 4.71
ELEV = 4.67

ELEV = 4.67
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
0.50 2.50 2.50 0.50 0.50 Grouted Riprap (Class A)
5 -2.0% -1.9% -1.9% -1.9% 5
1.0
2

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 19
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+200.00
10 10

9 9

8 8

OFF=0.00m
ELEV=4.67
ELEV=4.63

ELEV=4.63
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+200.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% 5
OFFSET=3.50
ELEV = 4.60

1.0
4 4

3
3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+180.00
10 10

9 9

8 8
OFF=0.00m
ELEV=4.69
ELEV=4.64

ELEV=4.64
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+180.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -1.5% -1.5% -1.5% -1.5% 5
OFFSET=3.50
ELEV = 4.61
0.9
3

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 20
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+240.00
10 10

9 9

8 8

ELEV=4.76
OFF=3.00m L

OFF=0.00m
ELEV=4.65
MATERIALS AT STATION 0+240.00 AREA

ELEV=4.53
OFF=3.00m R
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Stone Masonry
OFFSET=-3.50 0.50 0.50 2.50 2.50 0.50 0.50
OFFSET=3.50
5 3.8% 3.8% -3.8% 5
ELEV = 5.01 -3.8%
ELEV = 4.85
4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+220.00
10 10

9 9

8 8
OFF=0.00m
ELEV=4.66

ELEV=4.61
ELEV=4.64
OFF=3.00m L

OFF=3.00m R
MATERIALS AT STATION 0+220.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 2.50 2.50 0.50 0.50
5 -0.5% -0.5% -1.5% -1.5% 5
OFFSET=3.50
ELEV = 4.58
1.0

4 4
4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 21
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+280.00
10 10

9 9

8 8

ELEV=4.71
OFF=3.00m L

ELEV=4.64
OFF=3.00m R
OFF=0.00m
ELEV=4.62
MATERIALS AT STATION 0+280.00 AREA
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
0.50 0.50 2.50 2.50 0.50 0.50
Grouted Riprap (Class A)
5 3.2% 3.2% 0.6% 0.6% OFFSET=3.50 5
OFFSET=-3.50
ELEV = 4.67

6
ELEV = 4.51

0.9

1.2
4 4

4
3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+260.00
10 10

9 9

8 8
ELEV=4.86
= 4.81 L

OFF=0.00m
ELEV=4.63
OFF=3.00m

MATERIALS AT STATION 0+260.00 AREA


OFFSET=-3.50

ELEV=4.41
OFF=3.00m R
7 7 Unsuitable Excavation
ELEV

Embankment from Borrow (Common Soil)


6 6
Grouted Riprap (Class A)
0.507.5%
0.50 2.50 2.50
5 7.5% 0.50 0.50 5
-7.5% -7.5% OFFSET=3.50
5
0.9

ELEV = 4.40
0.8

4 4
9

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 22
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
0+290.50
10 10

9 9

8 8
MATERIALS AT STATION 0+290.00 AREA

OFFSET=3.00
OFFSET=3.50
ELEV = 4.76
ELEV = 4.73
OFFSET=0.00
ELEV = 4.61
OFFSET=-3.00
OFFSET=-3.50

ELEV = 4.46
ELEV = 4.43
7 7 Unsuitable Excavation
Embankment from Borrow (Common Soil)
6 6
Grouted Riprap (Class A)
0.50 0.50 0.50 2.50 2.50 0.50 0.50
5 -5.1% -5.1% 5
-5.1% -5.1%

0.4
0
3
0.9

4 4

3 3

2 2

1 1

0 0
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud 23
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur CROSS-SECTION PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II
2440

90

70
CONSTRUCTION OF (Name of Project and Location)
30
50
CONTRACTOR :
30
50
DATE STARTED :
30
50
CONTRACT COMPLETION :DATE
30
50
CONTRACT COST :
30
50
IMPLEMENTING OFFICE :OF/ CONTACT No.
1220 50
SOURCES OF FUND :
170

30
60
DEPARTMENT OF
40
60
PUBLIC WORKS AND HIGHWAYS
30
50
TEXT 2920 or call (02)165-02 for any concern on this project
50
www.dpwh.gov.ph

40 320

DPWH STANDARD PROJECT BILLBOARD


SCALE NTS

REFER TO:

- DEPARTMENT ORDER NO. 21, SERIES OF 2017


- UNNUMBERED MEMOS NO. 097.7, SERIES OF 2018
DISPLAY AREA
DISPLAY AREA

1200

1200
50 X 50 HORIZONTAL
COCO LUMBER (TARPAULIN ON 1200 x 2400 x 5
MARINE PLYWOOD)

50 x 75 VERTICAL
COCO LUMBER 50 x 50 WOODEN
50 x 50 WOODEN

1000

1000
STAKE
STAKE
EDGE OF ROAD
GROUND LEVEL

TRAFFIC DIRECTION
500

500
ROAD

ORIENTATION
TYPICAL FRAME ELEVATION FRONT ELEVATION

BILLBOARD FRAME
(NTS, ALL DIMENSION ARE IN MILLIMETERS)

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOEL A. INOCENTE
REGION V ENGINEERING ASSISTANT
CAMARINES SUR 2ND Construction of Tinalmud Nuevo - Tinalmud BILLBOARD 24
KATHRINE CRIS D. AGOR ERLINDA D. IPO SALVACION LORA C. DELEÑA RUBEN S. SANTOS JR.
PREPARED:
DISTRICT ENGINEERING OFFICE Viejo Road, Libmanan, Camarines Sur SPECIFICATION ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
BARAS, CANAMAN, CAMARINES SUR DATE: DATE: DATE: DATE: 13
MICHAEL B. BEDIS
ENGINEER II