RBS6000 Integration Procedure On GSM: Creating Instalation Database (Idb) Launch The OMT As Below
RBS6000 Integration Procedure On GSM: Creating Instalation Database (Idb) Launch The OMT As Below
Click <delete> at lower right hand side under the <Cabinet Setup>
Drop down to select the required of the following and click <OK>
a. Cabinet Type
b. Power System
c. climate system
Click <NEW> under <Antenna Sector Setup>
Select the required shelves and slots depending on the configuration and band.
Drop down to select the required <Hub position> as shown above (B1).
Click on <external Nodes> ,<Add Nodes>, then drop down from <Hub Address> to the subsequent
ones ( e.g A5,A6 ) depending on the number of DUGs required. see below
Click OK : this confirms the added external nodes (see view below)
Click OK , then select the required <MCTR Configuration> as shown below ( Note: this depends on
the configuration and must be confirmed from the BSC)
Do the following for the subsequent views
Drop down the <inlet usage> to select <Smoke Alarm> as shown below
Click <Apply> on the view below
And then click YES below (this activates the inlets shown below)
And click OK in the view below
Drop down as below and select <present RUs> and highlight to make them present and then click OK
You must see below