2020 BUDGET FOR MAINTENANCE DEPARTMENT AT THE DEPOT
S/n Description of budget
PAINTING WORKS 1 Tank Roofs(7) 2 Tanks Shells(7) 3 Hydrant and Product Pipes 4 Gantry Structure and Super Structure 5 Water Structures and Gates 6 Jetty fence SERVICING 1 Pressure testing of Pressure Relief Valves 2 Foot Valve 3 Water treatment plants(Truck Park and Depot) 4 Boats,Staff Bus and Motorbike 5 Internal Floating Roof 6 Calibration of Breather Valves 7 Calibration of Flow meters 8 Pressure testing of reinforced Hoses 9 Calibration of storage tanks (6) by SGS 10 Servicing of air conditioners 11 Calibration of pressure gauges 12 Cathodic protection and earthing of tanks and pipes 13 Repair of Tilted water tank 14 Replacement of Cruise boat engine 15 Flat bar on storage tanks hand rails 16 Spare Parts Replacement TOTAL ENANCE DEPARTMENT AT THE DEPOT Justification Estimated Cost Duration
Corrossion Control 1,300,000
Corrossion Control 2,500,000 Corrossion Control 700,000 Corrossion Control 200,000 Corrossion Control 200,000 Corrosion Control 100,000