VIETSOVPETRO DAILY DRILLING REPORT WELL No: DH-14x]RIG. (OCEAN GENERAL DATE, June 18, 2002] COMPANY MEN. bow: 20/085: TT|WATER DEPTH 137m] Patrick Thomas [LASTCSG OD, _ 10 3/8"|CSG MO: 1222.44 CSG TVD: 2183.42] Nguyen Hai Chan BITAND HYDRAULIC Sample from ‘Aaive SG Vis 714145, PV Ye 1020 Gels (0710) 10726 _|Type BRPM/3 RPRT 40730 [Seria No | RPT FL TMT 074s JADC Code WOR. {7 RPM LGSTHGS (%) | 7.570 [Depinin. m — | [Foraue, kgPm [Sod / Sand (4) 7.5 [Depth out, m JBHA Weight. IF Cakemm/oH | 1/85 |Matees wt below jar. | KCL 1 Givcol, % 0 Driting Hours Pip & Sioff Wi.t Hole volume, ma] 355 ___|Reaming Hours IROT Wt Mud Type FEB Polymer fav. ROP, mnt ax. overpult 7059 (NOB. mt TALLY BHABS $813.74 (RPM (curt) - Tem $66 062.15 _ [RPM (otal) rar] JD MOTORS a ister T5 Pom Rate, VS ~ Float Sub SPP. aim is 16/16" S Sia Jae BIT, aim ls" Pony NwiDo jar Hours HAP @ ait fuwvo-tar0 otor Ser No [av DP/OH, mis _ INMOC [Motor Hours: BitNo Bit Grading [5x 8" DC [Motor wrer a ia" HE Jar AWD Ser No 2xe"Oc > GOST DATA Ko 72008. 74 fe x RWOP Procene $7.435,678.59 [LITHOLOGY —_[Liniest Clays.Ma\ 57 302.630.56 Total Length, m MWD & ENS SURVEYS: MD. ncination, dea a Plan : fis Isa 710" [Brit Water, m3. 318 376 103 [DOG 18 [Cement G, mt 63 63 415 Se aaa eo a Standby Boat Rod Plover RepairStanaby Monthy SB/RISFO.75/3.5 (3.25 TOTAL SOPTER & BOAT MOVEMENT. stBOP Test_| _ Ie vund2 [Next BOP Test 3JuLd2 fo KE Ep Page 1 of 2 LOO AE” DATE: 18-Jun-02 RIG RATE Tie FROM] TO Page 2 OPERATION 0.00 | 4118 | 1.25 IContina® to run 16 88" casing, Piok up casing henger and Tstlanding joint, make up sania, 715 | 200 [0.78 Fun casing on landing ang end ana ih 16 3/4" wel head. Check lending point with [Datum fine (ok). 13 3/8” Gasing shoe at 2222.44m: 200 | 00 | 1.00 Rig up cementing head and circulating Ines. 3:00 | 4:18 [4.28 (Cireulate 1 1/2 times casing volume. 4:15 | 9:00 | 4.50 Ling up Haliburton, Pum 10 bbis of Sw , Pressure test ines t0 247 Bar, Pump 8m of [Chemical Wash and 6rd of Mud Push. Drop bottom plug, Pump 3 bois to realease plug Load top plug. Commence cementing Tat lead slurry 2at at 1588g, 2nd lead slurry 78.2 at 138sq, and Tall slurry 16..6t at 1.8959. Drop top plug. pump 10 bbis SW with halivurton, 00 | 100] 2.00 (Commence displacing cement with rig pumps. Lost retumns with 600 strokes fo pump, ‘Cont fo displace until pressure bull up. 1.2 ms left to bump plug, Checked surface samples fang found they were thickening, 2 hrs prorto Lab test resuts 00 | 12:50] 7.50 Bleed off pressure, Floats holding, Line up and pump down Choke and Killines. Release ‘ool fang pump Gown landing string. Cement ta surface. 7zs0| 1630] 3.00 Lay out landing siring , 800 Ton elevators and Tam Facker 45:30 | 18:15] 2.76 Rin with milland flush tool. Flush BOP and w/ head area. Pooh with flush tool. 1:15 | 18:00] 0.26 [Change out Bails and lay out fush tool Taso [215 | 1.60 Iwake up seal assembly ,Rif-and weight sat game win TO ton. Line up Haliourion close lower pipe rams and pressure sel seal assembly to 241 bar. Hold for 10 mins. [Pooh with seal assembly r 7160! Be IMake up w/ bushing onto R/tool and Rih and set same, [225 [24:00 4.75 [Test BOP, Rams to 17 bar ow and 345 Bar high. § and 10 mins. [FOAL 24:00 Midnight fo 6:00 AM woo | 300 | S00 |Tast Failsafe to 17 Sar ow and 346 Gar high forS and 10 mins. Test Annulars to 17 Bar low land 241 Gar high for & and 10 mits Test choke and Kil manifold, Test on Siue Pod and Function test on Yellow Pod at T/ Pushers remote Panel 00 | 400 | 100 Pooh with test tool and ley cut same. 400 [6:00 | 2.00 ig up and test surface equipment, Kelly co0Ks, Safely valves and Kelly hose fo 1st standpipe Ivaive. 17bar low and 345 Bar high, for & and 10 mina ‘24-Hour Forecast Make up 12 14" BHA Rih cean out casing and Leak off Test, "RODITIONAL PERSONNEL Fue 4 [Centifuge SWACO-1 MORNING STOCK & WEATHER Dri Water: 360 md. Diesel Fuel 624516 m3, Bafle: 124 mt, Bentonite. 38 mi, [Cement G: 63 mt, Cement Blended: 0 mt Visibiy: Clear, Wind: 16-40 knots, Wind Direct. 290 dag, Swell 1-2 m, Direct. 240 deg Period: 3-5 sec, Wave. 5-9 m, Wave Direct. var dag, Period: 6-8 sec., Temperatura: 29 C. COMMENTS "ABDITIONAL EQUIPMENT [Wellhead running tool 1 set [Contnfuge = 1 JORILLING SUPERVISOR, DRILLING ENGINEER Page 2 of 2 DATE: 18-Jun-02 OPERATION 25 [Continue to rin 13 158" casing, Pick up casing hanger and Tstlanding joint, make up same 7:15 | 200 | 0.78 [Run casing on landing string and land in 18 2/4” well head. Check landing point with [Datum line . (ok). 18 9/6" Casing shoe at 2222.44m, 00 _| 3:00 | 7.00 [Rig up cementing head and circulating ines. 00 |_415 | 1.28 [Circulate 1 1/2 times casing volume. [ate | 806.) 480 [line un Halhurtian Sump 10 bbls of Sy_Prasauia test Ines to 241 Bar Puma ama of | (Chemical Wach and 6m3 of Mud Push. Drep bottom plug. Pump 3 bbls 10 realease plug) (Coad top plug. Commence cementing ‘at lead slurry 331 at 1 58ag. 2nd load slurry 79.2tat 1.586g. and Tall slurry 16.51 at 1.8889. Drop tap plug. pump 10 bbls SW with haliburton B00 | 1100] 2:00 [Commence displacing coment with rig 2umps at 140 Bar. Lost returns with 500 strokes 10 pump. (Cont to disolace until pressure build up 140-160Bar 1.2 m3 left to bump plug. Checked surface [samples and found they were thickening, 2 hrs prior to Lab test results 0 off pressure, Floats holding, Line up and pump down Choke and Kill ines, Release rool T [and pump down ianding sting. Cement to surface 2-30bis. {ESE | TESS] 00 [lay oul fencing sterg , S60 Ten elevators and Tam Packer 7330 | 18:15 | 2.75 [Rin with mili and flush tool, Fiush BCP ard w/ nead area. Pooh wit 76.15] 18:30] 0.28 [Ohange out Bails and lay out fush too. i 330 [arts [Make up seal assently Rin ard we ott se! lower pips rams and pressure sat sea’ assemay to 221 ba: [Poon wih seal assembly 1 tool [.06_ [Make up w/ bushing onto R /o0l ang Rin and ser sane 6 Sar hg rae | 7230) 4.80 fash 100) ie we 10 ton, Line ua Haliburton close Heid fer 10 mins, 26] 22:15 | 24.00] 1.75 [Test BOP, Rams to 17 bar low ar: [FOTAL 24:00 [Midnight to 6:00 AM 0:00 | 3:00 | 3.00 [Test Falisafe to 17 Sar ow and 345 Bar high ‘or Sand 10 mins. Test Annulars to 17 berlow [and 241 Bar high for 8 and 10 mins Test choke and Ail marifalG. Test on blue Pod and C Function test on Yellow Pod at T/ Pushers remote Panel Fao | AO | 1.00 [Pooh with testioc! end lay out same. 00 | 8:00 | 2.00 [Rig up and test surface equipment, Kely cocks, Safety valves and Kelly hose to 1st standbipe lvalve, T7bar low and S46 Bar high, for $ and 10 mins. i . I '28-Hour Forecast [Make uo 12 /14" BHA Rih clean out casing and Leak o* Text ‘ADDITIONAL PERSONNEL MORNING STOCK & WEATHER FMC = 4 [Brin Water: 360 m3, Diesel Fuel: 624515 m3, Bante. 124 mi, Santonio. O8 mt, [Genifige SWACO- [cement G: 63 mt, Cement Blended: 0 sity: ear, Wind’ 18-40 knots. Wind Direct: 250 deg, Swell 1-2 m. Direct. 240 deg Period: 2-8 a0, Wave: 6 .5 m, Wave Dect. var deg, Peviad’ 6.0 seq, Temperature: 29°. (COMMENTS FFhare was ne annulus drop when we last retums while deplacing, ‘ADDITIONAL EQUIPMENT. Weinesd running taci- 1 set entifuge- 1 DATE: June 16, 2002] COMPANY MEN bow: 18/085: 15 | WATE: ASTESTOT esc tance é200e Reser Fa Oo DRILLING MUD REPORT BT AND HYORAUIS lao. 2236___[Sampie fom ‘Active [BIT No. SRR. [TV 2199.26 _|SG/Vis 114/45 [Bt Size. 17 ie Progress, m a [PVIVe. 16720 [ake Hughes Driting Hours 200 [Gels (70) 10726 [type MK fav. ROP, rhe 4.00 RPM 73 RPM 40130 ]Serial No Te0uM ‘is Parameters for BHA _|APIFL/MBT #10745 __[TADC Coas 117. [WO8.t7 RPM 13-17 |1GS7HGS (Hr 7.570 [Depth in, m 2228 [Terque, katm 950.00 [Solid / Sand (5) 78 [Depth ouf. m 2236 JSHA Weight 27.20 |e CakemmipX| 1/88 [Metres 8 Wt below jar, 74.70 KCL Giyeoi, % a Driling Hours 208 Piup & Sift Wit, 1 Hole volume, m3 385) [Reaming Hours = ROT We.t 310.00 [Mud Tyoe PHB / Polymer [Av. ROP, ml 400 Max. overpul, 0.09 —|Sbs/otal Losses) 873—_JWOB, mt wat? | TALLY BHA #4 Daily Mud Cost | $4,794.17 _ RPM (eur 30-60. Tom] (Gum. Cost $66,138.47 _]RPW (otal "100.210 FT Bt JARS & MUD MOTORS. TK. 1x18 iotor 8 578 [larSerNo | DAR 20277 _| Ga —_ Float Sub | [iar Hours: 139,28 210 a S166 S Stab [iar Ser No ~_|eP arr, aim 267 — fs" Pony NMOC. [ier Hours HEP @ Bi 173 WOM Motor Ser NO 1015 [AV OPIOH, was ra INwoc Mater Hears 76387 BIENO Bit Grading 5x8" OC le" HE Jar bxeoo COST BATA MWD MTBF Daly Cost 75910.17 FORMATION _[Priocene. [Gum Cost $1,202,473.65 LITHOLOGY —_|imesi Clays Ma{AFE Cost 87,992,890,96 MWD & EMS SURVEYS MOM inclination, deg LT Azimuth, dog [ TVD, m iz "Vert. Section, m _| Ns lew _ 2 Dogieg. degiiom| —— WEATHER Foe. BOAT and SULK LOADS [rime 2400 VSP 75 | Bulk Material | Pumpable_ [On Rig] Revd | Used [On =a visibly clear (SLB 10" [Bri Water, m3 451 315 | 625 | 107 Wind, knots 40/20 [FMC 1 [Pot Water. m3 77 177 16 [Wind Direction 230 I oieset Fuel, ma s31 631 22 lwaveHegnt.m| 08-6 fPvo | 2 [Barte, mt 129 ~| 120 240 [Catering | 13 |Bentonite, mi 38 38 | 20 6 27___ [poe ¥8 [Cement mt 171 a DCGEVO| 31 [Cement Blend, mt “| [Others [Actual Var Load,| 2467.00 [Allow Var Load.t SGodst 070 [Last 50 Test T-Jure02 Standby Boat 0,758.5 /S25/TOTAL | 88 [Nem BOP Test | 21-Jun-02 Red Plover Master Tide at focation 22:40 Hrs. Off loading Mud chemicals, Cmt chemicals and equipment. Drilwater and bulk Ge aster Tide lft ication to Trent @ wih 2 passemgars at 11:76 hrs FP Qype Page 1 of 2 Cet heekhty DATE: 16-Jun-02 TIME RIG RATE OPERATION bh FROM] TO o 0.00 [2:15 [Continue fo Rih from The 20° shoe to bottom 22 16m. Tom of (Hara) =| ° 28 | 2:30 fash and rotate from 2276m to TO at 226m, oO 2:30 | 5:00 | 2.50 [Dril from 2228m to 2296m to allow 13 3/8" casing tO reach bation, © 5:00 | 6:30 | 3.50 [Sweep hole with 15md of hi vis. Grop Carbide and commence circ out of hole F [Carbide test no conclusive. G[ 8:30 | 8:45 | 0.25 [Spot 15m3 of ni-vis on bottary Flow check © _| 8.48 | 72:15 9.80 [Pooh to the 20” ehoe. Hole good. © | 12:18 [75:00 2.75 [Rin rom 20" shoe to 2226m. Fil Bm, Wash to TO a 2256m. © [46:00] 77:30 2.50 [cicinio un ne nl ean and drop Cari nt Rent hee Hae 1726 0117-30] 78:00] 0.50 |Spot 15m3 of hi-vis on batiom. Flow check ‘@_| 18:00 0:00 [6,00 [Pooh to the 20° shos spoming Graphite - Lube pile a 4850m to 1910m -6m3 of pill 4780 to 1650m - 223 of pil - [i260 to 830m - 68m3 of pil (TOTAL 24:00 Midnight to 6:00 AM ~ + 00] 706 | 7.90 [Continue to Pooh and rack back BHA 1:00 | 2:30 | 1.50 (Clean ig Toor. Make up Wear bushing running tel and retrieve wear bushing, Lay roo! and wear bushing 230 | 848 | 125 ig up to run 13 6" casing. Herd safely mesting on ngging up 16 ran casing and running 639, 345 | 845 | 1.50 [Make up Shoe Rand 1 intermediate joint fo Float collar and thread lock same. [Check float equipment. 548 [600 [0.75 [Rig ue Tam Packer and Pick up elevators. and commence running casing l2a-Hour Forecast JRun 13 3/8" casing and coment Fue -1 "ADDITIONAL PERSONNEL [Centriftge SWACO- 1 MORNING STOCK & WEATHER Gri Water 61573, Diesel Fuel 629m, Barite: 128 mt, Bentonile. 40 mt, [Cement G: 171 mt, Cement Blended: 0 mi. Visibility: clear, Wind: 16-20 knots, Wind Direct 240 deg, Swell 0.5- 6m, Direct. 240 dea, [Periog’ 5-5 sec, Wave: 3-6 m, Wave Direct: var deg, Period. 6-8 sec., Temperature: 29. ‘COMMENTS. ADDITIONAL EQUIPMENT, jelhead running tool. 7 s6t [Centrifuge - 1 DRILLING SUPERVISOR. EY Bp pruincencneer (CCA CEEZ___- VIETSOVPETRO DAILY DRILLING REPORT WELL No’ 14x OCEAN GENERAL [DATE: dune 6, 2002] COMPANY MEN bow: 708s. “IWATER DEPTH 437m] Patrick Thomas AST CSCO 2o"ese o- B20 meso WE 620m] Bul Minn Ho DRILLING: BIT AND HYDRAULIC. Samos Form Acive BIT No. [rv ISG Vis 703/100 [ait Sze | Fivgreos in vive Tiyee [Erting Houre Geis 76) [SenalNo fix, ROP. mar IS RPMTS RPM [abe Code Parameters for BHA __|APIFL/WBT Dept i [roe TTR Tests ror | Frorque, Amps oa 7 Sand (9) Rieves [BHA Weight. F Cake.mm oH | -7 70 _Jriling Hours ft nelow art [KCL [Given ¥ FReaming Hours | Piso & Som Wa ote volume. 3 WN. ROP. Fr - Rot vit Mud “0 wos. mx _ [ax overseiy | —_[Sosrtatai costes RPE eur) ["—“Tallyenar [bai Mua Cost_ PA iota) Tamm ength eam Cost 3 7 x 72 TERS SMUG MOTORS, wT liarSerno Can 0217 |S am —| | Lar Hoors 18.75 [oP BIT. airs = ma E - - PHP EO ~ 7 ~ lav POF ee fowr sour Bie | Bi Graang oor uTaF T MWD Ser No Pas t Jaw Fours as COST DATA ew TEP siycost_——SSC~C~sC*C*‘“~‘s FORMATION [Ouaternary [cum Cost 7 000 JUTHOLOGY [Sends Clave [aFE Cost ination dea a JAsimuth, deg a vom 1 J Secon m | - BULK LOADS, ES e aan [Pome Ton ig Ree] Used [OTE RSS Sts apa es [aah eee ica koa rac [4 por waren ms isc | te [Wind Direction Geosen [2 [Diesel Fue, m3 292 EJ rave Raa ae a a Vr 6 [Weve Direction [Catenng | 13 [eentonte mt] 20 5 3 femoerature. C 30 ~ 20 [Cement mt 100 702 60 2 roe aro 3 foaransene at — sees AY Toes soar Var eae | Higa — ASV CSRET | SOOO erate, | 07 Fasrs0° Tea —[—onay se Sandy Beat Monthly RISAE_| 07070 —|FOTAL Re 8OF Test Red Fiover [RELIGOPTER & BOAT MOVEMENT JOil Hustier arrived at location at 18:00 Hrs. Came along port side, tied up to pump bentonite, cement unload Fi 378" casing, mud chemicals, VSP wireline unit ef. OP. Page 1 of 2 Z DATE: _§-Jun-02 a? Page 2 RIG RATE nS OPERATION [FRow] ToT ° 0:00 [1:30 | 1.50 [Cont make up 20” shoe track. Thead lock all connections Te on guide lines ropes. ‘o[ 7:30] | 15:00] ¥1.80/[Cont RIA 20" casing, fling up each ont wi seawater. Erte 30° Housing sbsenir@ [WT cane, lal vsiny ceivalewrs a8 per program. rick up 18 3/4" Housing Install subsea cement plug. RIH 20" casing on 5" HWDP (rift landing string), Land 48 3/4" Housing onto 30° Housing, Make up DP plug dropping neaa wi elug natalie © __[ 18:60] 7500] 2.00 [Creulate hole clean whie mizing cement chemicals. [75:00] 78:50] 3.50 [Rig up cement line, Haliburton pun ip 10 abis of seawater and pressure test line to 270 bar. Mix ard pump lead slurry 70m at 1-5asg, Tail slury 41nd at 1.959, Release dat and pump [189 m3 with Halibuiton oumo, Displacement plug sheared at 110 Bar, Switch to ng pumps [and displace cement with 85m3 of seawater. Bump Plug and held 35.5 Bar against same $6 | 18302100 2.80 [Wait on Cement samples before releasing pressure, [21:00 [22:00 1.00 [Release pressure and rig down cement head. Release Rkool and lay oul 1 single and change fout 500: baits | 22100 [22:48] 0.76 [Wash wellhead. Slope indicator reaaing 3/4 deg (o _| 2245 [2400] 4.25 Pooh win 18 9/4" rtocl and lay out single and aup joint Total | 24.00 [Midnight to 6:00 AM 00 | 8:00 | 6.00 [Rig up to run BOP stack. Ska SOP stack over moonsodl I24-Hour Forecast [Running and ‘esting BOP ard riser sysien, "ADDITIONAL PERSONNEL [Seoservices -2 T MORNING STOCK & WEATHER, [Sri Water. 601 m3. Diesel Fuel: 205 m3, Barie 89 mt, Bentonite: 70 m C-1 [Cemant G: 63 mt, Cement Slended: 0 Centnfuge SWACO Neti cio Wine: 11-12 kre Wind Uren DeO doq_Guel1H a Graal Doe Power Tong - 2 Pericd: 4:6 sec, Wave: 06.0.9 m, Wave Direct. 240 deg, Periog: 6.8 sec., Temperature: 30 © COMMENTS ADSITIONAL EQUIPMENT [Wellhead running tool f set [Centrifuge - 7 j20" Power Tong 1. DRILLING SUPERVISOR DRILLING ENGINEER Page 2 of 2 VIETSOVPETRO DAILY DRILLING REPORT WELL: DH-t1x|RIG. OCEAN GENERAL[DATE: June 4, 2002] COMPANY MEN. Dow: 6)0ss: SIWATER O=PTH: 187 m|_Patick Thomas LAST OSG OD: 30"|6SG WD: T7m|osc Vo. 497 m| Bui Minh Ho DRILLING MUD REPORT BIT AND BYORAULIC M0, $23 [Sample fom ‘Acive _[BITNO. TAR Fv, m 623 [sGiVs 103/100 [Bit Sze. 28 Progress, m 263 [PVIVP Type TSK- 385, Biling Hours 70.75 [Gels 710) 48576-T fav. ROP. mh 24.46__|SRPM/3 RPM ia Parametare for BHA___|AFIFL/NBT [Beth in, 1985 031/70 [UGS THES ( Depth out, 23 [Tar 70000 [Solid / Sand (4) Metis 4s BHA Weight.t_| 22.3 _|FCakemm/ pH | -/10 |Driing Hours [18 Wit below jar. 6.10 [KCL Giyool% FReaming Hours - z = Fup & SiofWi{ 85/85 [Hole volume, ms) fav. ROP 2361 _ [ROT wi, 35 [Mud Type fw, mt 2-6 IMex, overpul.t = __|sbe/Total sees RPM (sur 60 TALLY BRA EZ Daly Mod Cosi_| $6,023.64 [RPM (total 142 Tem Longin, m_|cum. Cost 312,915.88 [Nozzles ane t Fmt ARS E MUD MOTORS Jui Rate, Vs % ctor 7.55 [larSerNo DAH 00277 | SPP. aim 38 Ficat Sub. 085 [larHours | 18.75 «(dP BIT, atm fe NMOS 258 __[Jar Ser No HA @ Br 26° Stab 1.70 [ar Hours lav DFIOH. fam wo 3.46 [Woler SerNo Toe [AVRO mis le" NBS 2.48 [Molar Hours 218 BitNo Bi Grading jaa" DC 45.33 [Voor MTBF RR a 0.64 [MWD Ser No P3i8 [8 1/4" DC 78.30 __|MWD Hours 215 ‘COST DATA xo 708 MWOMTEF |] aiy Com Ee fe" WOE 711.86__[FORMATION _[Guatemary —_[cum. Cost $5565.420.89 Frotal Lenathm| 216.28 LITHOLOGY Sands, Clays 37392 ees == mo aa = = a 4200 _ | __870.00 358.00 0.40 059 ost 0.68 070 728.88 719.34 706.78 718.18 131.25 ~a84.00 512.50 542.00 $68.99 328.99 vet, Section m | 008 013 032 ost 078 Ws 0.10 “2.04 20.45 027 047 few 0.12 032 0.60 090 118 Dogieg. degior| 0.08 97 0.08 0.06 0.05 WEATHER POs, BOAT and BULK LOADS. rime 2400 __ [VSP 7_| Bulk Material | Pumpablo [On Rig] Revd | Used | On Boat! Visisiiy Clear (SLB [Bn Water, m3 327 381 245 wind. rats 17-21 [FMC 1 [Po Water. m3 129 128) 33 Wind Direction 240 [Seosear_ [2 [ese Fuel. 282 308 28 lwave Height, m | 08-08 [PVD [Barts mt 5 70 0 Wave Direction | 240 [Catering | 12 [Bentonite, mt 20 25 35 DOG | 18 [Cement G, mt 760) 120) ° OGIFVD| 31 [Sement Glenc. m| 0 0 0 Sperat Spec F [actual Var_Loed,| 271gST [Allow Var. Load | 30008 RepaivSiandby | 070 30-May-02 ‘Standby Boat Monthiy R/SRZ | 0/070 Red Plover, HELICOPTER & BOAT MOVEMENT PRE ee BE ya-yuneuve wey Ui 40 DATE: 4-Jun-02 TIME lFROW| TO RIG RATE ven UcHtAnt. vod se4 o4ed rue Page 2 OPERATION 0:00 | 0:30 | 0.60 [Sweep hole w/ 16 m3 of PH mud at 360m. 0:30 [11:30] 11.50 [coninus to di 26" hole rom S60 mio TD al 8m ewossing each sland w/ 8nd oF PH mud ar30] 72:36) 4.00 [Sweep hole with 16 m3 of Hi Vis PHB mud. 42:30 | 13:16) 0.75 Dispiace hole w/ PHB mud. T 13:15 | 1430] 0.75 POOH from 623 m to 194 m. No drag. 44:30 15:30| 1.00, [Make up DP plug dropping cement head on &” OP and lay down, Secure fig 15:90 | 76.30] 1.00, [RIM from 184 m to 629 m, 4.5 m fl 76:30 17:80] 1.00 Dispiace hole w/ PHB mud. 17:30 18:30) 1.00 IPOOH from 623 m to 190 m. — 48:30 [18:00] 0.50 [Wash w/ seawater from 198 m to lop of wellhead at 138 m. 19:00 [20:30] 4.50 [Cont. POOH. Rack back 26” BHA, 20:30 [21:45] 1.25, [Cioan rig foor. Held safety meeting. Rig up to run 20" casing, 0 |0]0|0folofolojolololo|o| 21:45 |24:00| 2.25 [Make up 20° float shoe, shoe joint, oat collar and fic joint. Thead lock connections. Total | 24.05 (Midnight to 6:00 AM 00 | 730 | 7.50 [Cont. make up 20" shoe track Thead lock all connections. Tie on guide lines ropes, 1130 | 6:00 | 4.80. [Cont, RIH 20” casing, filing up each joint w/ seawater. Enter 30° Housing observing [w TV camera. Install casing centralizers as psr program. (250 rm af 6:00) [24-Hour Forecast (Cont. RIH 20° to 820 m, Circulate w/ seawaler and cement as per program, "ADDITIONAL PERSONNEL IGeoservices -2 JMC 1 ICenirifuge SWAGO -2 MORNING STOCK & WEATHER [Orii Water: 267 m3, Diesel Fuel: 281 m3, Barite: 69 mt, Bentonite: 21 mt. [Cement G: 120 mt, Cement Blended: O-rmt Visibility: clear, Wind: 18-20 knots, Wind Direction. 240 deg, Swell, 1.2-1.8 m, Direct 240-4 Power Tong - 2 Period: 4-8 sec, Wave; 0.6.0.9 m. Wave Direction: 240 deg, Period: 6-8 sec., Temperature: 20.C ‘COMMENTS: "ADBITIONAL FOUIPMENT fWeithead running too! - 7 set. Centrifuge — 1 [20° Power Tong = mune surenwson /2——-—__omILLNG ENGINEER Ji bo Wis isUvre (RO DAILY DRILLING REPORT DH-11x]RIG: OCEAN GENERAL [DATE: June 2, 2002] COMPANY MEN 7 A]WATER DEPTH 437 m|_Patrick Thomas 197 mICSG TVD: 487 m| Bui Minh H BIT AND HYDRAULIC [Mom 198.50 __|Sample from ‘Aciive [BIT NO. [rv0. m 188.50 |SG/vis 4.03 /100 [Bit Size, mn 26 Progress, m 61.00 fPvive Type TSK- 388 Priting Hours Geis (70) [Serial No 46876-T lav. ROP, mine | 5 RPM/S RPM [ADC Coce $14 Parameters for BHA API FL/MBT [Dept in, m 137 ia [WOS.t/ RPM Jigs 7HGs [Depth out. 198.5 Teraue, Amps Solid Sand (%) | —[aetres at BHA Weight, FF Cake.mm pH | -710___ [Oring Hours 3 | wt below jar KCL Giyco, % Reaming Hours Pio & Sioft Wet ole volume, m3 lav. ROP, mine 8 ~ ROT Wet laud Type | WOR, mt 5 Max overpullt Sbs/Total Losses RU (sur ~ TALLY BHA [Daily Mud Cost | $2,229.79 [RPM (total) 60 itera Length, m_[Cum. Cost $4,970.16 _|Nosles, 1/3200] ax 28 bs _[_0-54 | SaRs& muses —] WoTORS [Pum Rate, Vs 87 [_ [96° Hole Opener} 2.72 [ler Ser No SPP, atm 2 ~ Sit Sub 0.91 [JarHours GP BIT. aim le" DC 26.94 [ar Ser No [HP @ Bit io 100 Jar Hours Ww BPIGH, fom TOC :422__|Wotor Ser NO [Av OPIOH, mis xo 7.08 [Motor Hours BIND Bit Grading 5 RWOP 56.17 [Motor MTBF 1 TA-WT-A-ENO-TD. IMWO Ser No ~ IMWO Hours [COST DATA wo MTBF 37a isaz1 FORMATION Cum. Cost $189,796.68 frotal Length m| 143.66 [LITHOLOGY JAFE Cost 7,392,830.36, wom [ncination, deg _| [azimuth, deg lTvo.m Ver. Secon. m | _ 7 _ iS -| lew | [— Dogieg, dea/tOn WEATHER 08. BOAT and BULK LOADS [Fame 2400 |VSE 7 | Bulk Material | Pumpable | On Rig] Revd | Used [On Boat| [Visibility Clear S18 [Drill Water, m3. 703 787 [191 lwing. knots 2ixts [FMC 4 [Pot Water.m3 | 150 «| 159 | 16 | 36 Wind Direction | _240deq _|Geosen_| 2 [Diesel Fuel. m3 320 347 7 Wave Height, m am, [73 Bari, mt 70 70 Wave Direction (Catering | 12 [Bentonite, mt 7 i | 2 | [Temperature, C pos 49 [Cement G, mt 165 163 [41 DOGPVD | 31 [Cement Blend. mt [OeratiSoec.R.] 27.670 [Actual Var. Load, 22635 _|Alow Var. Load. t 300081 Repain/Stanaby [rast BOP Test | _S0-May.02 ‘Standby Boat [Wonthiy FYSPL2 [Next BOP Test Red Plover [Sao Mai 02 departed rig for Vung Tau at 6:30 on 2 Jun 2002 w/ 3 1/2" DP (OG) and emply containers (Mil [Req Plover stands by on "Man working in moonpoot” from 10:30 to 17). Page 1 of 2 wunmeuue HUA UT etS DATE: _2Junoe RIG RATE me UUCHN UCNEKHL, UBY Sed S48 Pe oUe Page 2 — OPERATION FROM] TO 0:00 [718 | 1.25 [Cont drit 36" hole rom 148 m to 167 m. Sweep hole w/6 ma of Hivis prehydrated gel. its | 146 | 0.50 [Take survay at 167 m (0.25 deg), 145 | 630 | 3.75 (Cont. to drill 36" hole from 167 m to TD at 188.5 m. 5:90 | 6:45 | 0.26 [Sweep hole w/ 16 m3 of PHB mud 5:45 [6:15 | 0.50 [Take survey at 198.5 m (7 deg). 6:15 | 645 | 0.50 liver trio from 198.5 to mud line . hole good no drag. 845 [715 | 080 [Dicplace well to prehydrated gel 7:5 | 930 | 2.25 {OOH and top up hole on way for metal dieplacement 9:30 [14:00] 4.50 Pick up and run 30” csq and land same in PGB. 44:00 [16:00 | 1.00 [Pfup 30” RiToo! and make up to 30” housing and jand Casing PGB in maonpacl 15:00 | 16:30] 1.50 Unjay end rack back R/Too! and run cement stinger. M/up 30" R/Tool and m/up to SO” housing. Fill up casing with seawater and rig up TV camera, 1630 | 17:45 | 1.25 IRih with 30° casing and PGB to TGB. Hold weight with blocks, PGB at 3/4 dex 17:45 | 16:00 | 1.25 IRig up Haliburton while circulating casing and hole clean, loo} Jolololojofofo}olo|o}o} 16:00 [21:30 2.60 |Kalibuton pump break circulation. Test lines fo 200 bar and cement casing as per program 1:90 [2400 | 2.80 8 [Wait on cement samoles to harden, Total [24.00 [Midnight to 6:00 AM 38 _| 0100 [sae | 7S [Wait on cement samples fo harden, 0__| 3:45 [5:00 | 4.25) lUn jay 30° rool Pooh with Ritool and cement stinger, 0] 5:00 [6:00 | 1.00 Ilup 18 34° Hetaing Running Tool assembly and ay same si (24-Hour Ferecast [Onl 26" hole "ADDITIONAL PERSONNEL MORNING STOCK & WEATHER IGeoservices -2 [Brit Water. 626 m3, Diesel Fuel: 305 m3, Barlte: 69 mt, Bentonite, 62 mt Fc 1 [Sentrifuge SWACO - 2 Power Tong - 2 "ADDITIONAL EQUIPMENT, [Walihead running too! - 7 set. [Centrifuge - 1. f20" Power Tong - 1 prune supenson ZS DRLLNG ENGINEER Lee [Cement G: 120 mt, Cement Blended: 0 mk. Visibility: clear, Wind: 20-24 knots, Wind Direction: 240 deg, Swell. 1.5-2.1 m, Pari: 6-8 sec, Wave: 06-1.2 m, Wave Direction: 240 deq, Pend: 6-8 seo, Temperature: 30. ‘COMMENTS [Seoservice wnt repostioned fo por side near flow Ina. Cont to inetall sensors for mud pits and sril floor. Swaco cenirtuge installation complete: Strap 20° casina Pron Dat? MIETSOVPETRO DAILY DRILLING REPORT. WELL No: DH-11x[RIG: OCEAN GENERAL [DATE: June 1, 2002] COMPANY MEN | bow: Joss: o|WATER DEPT: Patrick Thomas LAST SG 0: [CSG Wid: [CSG TVD. ui Minh DRICLING 7 BIT AND RYDRAULIC om | 148.00__[Sample fom ‘Active __ [SIT NO. 1 vo. 149.00 [SG/Vis 4.03/100 [Bi Size, in 25 Progress, 12.00 Pvi¥P L [Type TSK 1.60 [Geis (0710) L Serial No 488761 RPM /3 RPM 7 [ADC Code JaPt FL Misr 7 Depth in, m 137 GS7HGS () 7 Depth out, na | alia Sand (26) 1 [Metres | F.Cexemm oH | 110 [Oriling Hours 18 lt below iar. KCL Giyeol. % 7 fReaming Hours - [Piup & S/off Wit Hole volume, m3 ‘fav. ROP, rer 3 Ror wat 7 Mud Tye PrefGel_—_[WOB, mt 5 ax_overpult Sos/rotal Losses [RPM (suty TALLY BHA Daly Mud Cost_| $4,067.00 _|RPw/ (otal on Te Tength, m_ |cum. Cost $4,087.00 __|Nozies, TSA 25 Pe BE aa Pum Rate, Ve 7 ~ * Hole Opener 2.72 [arSerNo | Sub | 0.9% Ver Hours a ea p"Dc 26.94 [Jar SerNo [HHP @ Bit wo 7.00 [var Hours lav DP/OW, fom leva oC 4.22 [Motor SerNo | lav OPIOH, mvs 4108 |Votor Hours Bir Grading 56.17 [Motor MTBF. iWD Ser No law0 Hours GOST DATA — awo MTBF Bally Cost — FORMATION. [cum. Cost $116,301.47 frotal Length, m [LITHOLOGY IAFE Gost $7,392,830.35 flotal Length, m | wo T Inclination, dea — ‘Azimuth, deg Z TV. m — — Vert. Section, m a = | EW Dagieg. deqrt Om) WEATHER POs, BOAT and BULK LOADS fFime 2a0o_\VSP 7_| Bulk Material | Pumpable On Rig] Revd | Used [On Boat Visiiy Clear |SL8 [Ori water, mis 763 767 191 | ina, knots 2tkis—_[FMa 1 [Pot Water, m3. 188 160 | 16 | 36 Wing Direction] 240deg _|Geosen. | 2 [Diesel Fusl, ma 326 ‘M7 17 Wave Height. |___6m [PVD 5 [Barite, mt 70 70, jave Direction | 240deq [Catering _| 12 [Bentorite. mt 71 7 | 38 |i [Temperature, © 20 |006 [18 [Cement G, mt 783 6s [_ 44 31 [Cement Blend, rt [Actual Var Load, 2447s [Allow Var-Leaat | 000s RepairiStandby 70 20-May-02 ‘Standby Boat IMonthiy RISR/Z_| 0/070 Red Plover [Sao mai 02 arrived along port sids at 18:00 hrs. Offload deck cargo and bulk cement and bentonile, took backioad lEargoes (3 1/2" OP, empty containers). Page 1 of 2 | Page 2 TIME RIG RATE DATE: June 4, 2002 FROM] TO OPERATION 0:00 [72:00] 72.00 Pup 5° OF and rack back, Tolal30 sland Mixing prehydrated gel for spud. 72:00 | 72:30] 0.80 [Make up 30" Housing running tool on a stand of § HWDP and rack back. 12:30 | 16:00] 6.60 [Cont io piup DP. Total 15 stands. 48 Stands racked sack, 16:00 (22:30| 4.60 IM/up 26" bit and 36" hole opener and BHA. RIH to Imconpecl . Attach guide ropes and RIH to TGB, tag sea bed al 137m. 22:30 | 24100 4.50 [Spud well and dril 36° hole from 137m to 143m. Total | 24.00 fidnight to 6:00 AM O00 [18 [7.28 1:15 | 1:45 | 0.60 rake survey at 167 m (025 deg) 7:45 [5:30 [3.75 (Cont. to dril 36° hole from 487 mt TD at 168.57 [Cont. dril 36° Role from 140 mto 167 m. Sweep hole w/ ma of Hvis prehydated gal. 5:30 | 545 | 0.28 [Sweep Role w/ 16 m3 of PHB mud. 545 | 6:16 | 0.60 [Take survey at 198.5 m (7 deg), [24-Hour Forecast [Run 30” casing and cement same. "ADDITIONAL PERSONNEL. MORNING STOCK & WEATHER [Geoservices - 2 brit Water 764m, Diesel Fuel. 347 m3, Barile. 69 mt, Bentonite: 69 mt Fic -1 [Cement G: 163 mt, Coment Blended: 0 mt. [Centrifuge SWACO-2 Visibility: clear, Wind: 18 knots, Wind Direction: 240 deg, Swelk 1.2-1.8 m, Perid: 6-8 sec, Power Tang -2 |Wave: 06-7.0 m, Wave Direction: 240 deg, Temperature: 30C ‘COMMENTS Instaling Mud Legging unit and Centrifuge. "ADDITIONAL EQUIPMENT, FWalihead running Tool - 1 se [Sao Mai 02 departed rig for Vung Tau at 5:30 on 2 Jun 2002 Centrifuge - 1 [20" Power Tang - 1 loruuna surenvson”AB—~—__ oan ENGINEER Ue Page 2 of 2 | MIETSOVPETRO DAILY DRILLING REPORT. suTnate WATER DEPTH: 437 m| IoSG TVb: 437m MD, 360 Sample from, Active iT NO. ARR ftvo. m 360___|SG/Vis 7.08 1008 Size. 1h 26 Progress. rm 47 VI? In TSk-588 Dring Hours 7.75 [Gets (710) Serial No a6876-T 6 RPM /3 RPM ADC Code. jaPi FL MET Depth in, m 785 | IWOB, t/ RPM ILGS / HGS (3%) Depth out, m in Torque, Amps 400.00, |Solid / Sand (%) Metres 170.5. BHA Weight.t | 23.3 [F Cake,mm/ pH | __=710 _[riling Hours 78 wt below jr. Sit [KCL / Giyeo. % —_JReaming Hours Piup & Sich Wit ole volume, m3 lav. ROP, rhe B IMud Type [WOB, mt St _ ax. overpallt Sbs/Toiai Losses] RP (sur 30 TALLY BHA #2 [Daily Mud Cost_|__ $1,926.08 [RPM (otal) I item Length mm [Cum Cost $5,806.26 —|Nozzes, VERE” 3x26 pea O54 JARS B MUD MOTORS [Pum Rate, Us 59 Voter 7.56 [ar Ser No DAH 00277 SPP. aim 7207 (Float Sub [08s Jar Hours 8.25 Ja? BIT, am [B" NMDC_ 2.68 Jer Ser No HHP @ Bit ~ fe Sab 770 [Jer Hours [av OP/OH. fom aio 3.43 [fotor Ser No 70:5 [av OPIGH. mie er aMioe 6.49 [voter Hours 35 BitNo 1 BR Grading lewa oc 45.33 [Motor MTBF Lar 364 |MWO Ser No PaO [8 1/4" OC 48.30 IMWO Hours 65 COST DATA, [xO 1.08 [MWD MTSF $70,165.92 5: HOE 711.85 [FORMATION [ouatermany [cum Cost $257,881.00 [Total Length. m| 276.29 [LITHOLOGY [Sands, Clays _JAFE Cost '$7,302,890.35, HELICOPTER & BOAT MOVEMENT io _ Tim 3am ET ETO TIO 75500 inclination deg] 22 Deg “aves 08469 908 0.08 0.38 facimuth deg | 28.94 Deq | 265.27 Na7_[ 11.24 | N8o | 68 | BTC | 1687 | 71681 Bow Cent [Dna 1743 [ n- [68 [ere 1528.30 | 705.57 — nas_[ 11.08 [Neo [68 | aTC | 71530,6 | 604.14 Bow Cent Nea {11.83 |_N80 | 68 | BTC 7850.86 | 655.08 Na3_[ 77.25] NBO | _68 [arc 7562.14 | 671.55 Baw Cont Naz] 10.75 | Neo | 68 | BTC 7672.88 | 650.30 nat_[ 12.44 | Ngo [—e8| BTC 7585.33 | 649.55 Bow Cent Nao_| 12.57 | N80 |" 68 ‘BTC 7597.90 [637.14 Nae_[ 12.68 | N80 [68 | BTC 7610.46 | 624.54 N3a_| 12.54 | N80 | 68 | BTC 7623.00 | 611.98 Rigid cont Na7_| 1248 | N80 | 68] BTC 1635.46 | 500.44 Naé_| 12.40 [NGO] 88 | BTC 1647.86 | $86.58 N35_| 1251 | N80 | 68 | BIC 7660.37 | 874.58 Rigid Cent Nae [72.45 | Nebo | 63 [BTC 1672.82 | 562.07 Naa | 12.48 | N@O | 68 | BTC 1685.28 | 549.62 Ns2_[ 12.57 | Neo | 68 | BTC 7497.86 | 537.16 | Rigid Cent Nai_[ 12.61 | N80 | 68 | BTC 1710.36 | 524.58 NaO_| 1248 | NBO | 68 | BTC 1722.85 | 512.08 ("Nao | 12.57 | Neo [7 68 BIC 1735.42 [499.58 Rigid Cent N2e | 1256 | N80 | 66 BIC 4747.58 | 487.02 | Nar 12.45 | Neo |__68 | BTC 1760.43 | 474.46 | Nea_|_ 1222 | Nao [68 |" Bre 1772.65 | 462.01 | Rigid Cent Nab_| 12.45 | N-80 68 BIC “| 1785710 | 449.76 N2é_[ 1131 [N80 | 68 | BTC 1786.41 437.34 | Nas | 12.a4 | NBO | 68 | BTC 1808.85 [426.03 Rigid cent Nez_[ 12.56 | Ngo | 08 | 8TC 7921.41 | 413.58 Nat_| 1262 | NO] 68 | BTC 1834.03 | 404.03 Nzo_| 1250 | NO] 68 | BTC 1946.53 | 308.41 Rigid Gent Ni@ | 1288 | NO] 68 | BTC 71a59.08 | 375.01 Nia_| 1252 | No | 68 | BTC 1871.60 | 363.36 Ni7_| 1258 | NO | 68 | BTC 1684.18 | 350.84 Nio_| 12.62 [NBO | 68 | BIC 1896.70 | 338.26 N15 | 12.66 [Ngo | 68 | BTC 1908.28 | 326.74 Nia_[ 12.32 [N60 | 68] BTC e158 | 313.18 Nis_| 42.67 | NO | 68 | ATC 834.10 | 300.86 Nis] 42.14 | N-a0 [68 __[ BTC 1046.33 | 288.25 Nii [1231 | N8O[ 68 | BTC 1958.64 | 276.11 Page 3 of 4 15-JUN-2002 SAT 14:52 OCEAN GENERAL. 089 324 3428 P04 Length, Weight, |Connect-|Centraliz] Cum. | Bottom Joint m | S84° | pat | ion | ors |Length, m| Depth, m Comments Mio [1242 Nao | 8 [BTC 197408 | 265.80 No _| 12.23 [N80 [68 | etc 1983.29 | 251.38 _] Ne_[ 1251 | Neo} 68 [BTC 1995.80 | 230.15 ~ N7_| 12.65 | N80 | 68 | _BTC 2008.95 | 226.66 Ng_[ 12.41 | N60 | 68 | BTC 2020.76 |_214.08 NS [12.60 | Neo | 68 | BTC 2033.36 | 201.88 Na | 12.58 | N80 | 68__| BTC 2045.81 | 169.08 Na_[ i243 [N80 | 68__| BTC 2088.34 | 176.53 N2_[ 1220 | N60 | 68 [BTC 2070.54 | 164.10 Ni [72.43 | N-go | 68 | BTe 2082.07 | 181.80 Ba. Jnt| 3.60 _| N80 ere |[2086.57_| 139.47 [Bottom of Extension Joir Hanger] 0.34 Land at_| 135.67m | "2086.97 | 135.87 [Bottom of Casing Hangs RT| 048 ‘arc 2087.35 | 13883 |Top of Casing Hanger Ce 2099.16 | 135.08 |Landing String Lio [1443 | eo | 72 | BTC 2110.58 | 123.26 {Landing String | to | ti7e [La [ve | ste 212237 | 111.85 [Landing String te_| 11.83 | Lao] 72 | BTC 243420 | 100.07 [Landing String a tr [41.78 180] 72 | BTC 2145.88 | 88.24 [canding String te [12.08 [1-80-72 | sre 2188.06 | 76.46 [Landing String a ts | 4:88 | Leo | 72 | ere 2168.94 | 64.38 [Landing Siring ia [11.60 [80 | 72 | ere | 2181 84 | 62.50 [Landing Sting (3 | 11.93 [80 | 72 [BTC 2183.77 | 40.60 |Landing Sting (24078 | (80 [72 [arc 2205.82 | 26.67 [Lending String 1 | 1208 | Lao | 72 | atc 2217.58 | 16.92 |Landing String «is | 098 | Kos | 68 | ere 2226.56 | 4.86 |Landing String =4.12 _[Stickup VSP Drilling Supervisor Patrick Thomas VSP Drilling Engineer Bul Minh Ho Page 4 of 4 95/8" CASING 2nd - CEMENTING JOB CALCULATION DHX Volume Calculation & Job Procedure ‘Stony Design & Materials Estimation Tan StUmarY TEAD SURETY irewest Ginx Litem swe | weve ot ws 132 960 1.7 Case 254 rom [For biaWied Fd Is 1k vee a4 gal DisPeAceMENT lors 126 gal Insite Teer 02% Wy = sae latio sll hate 953 bol Aaiarea Tevet) ? " 2 ob 5 “ 125 pod TopotTal 288 5 237.0 ppb ‘op lasing Pig 0 | 2487 ah ‘spake weh md , 90 n aed ump pug 3 100 a Dery 1270 ppg Blead af Chcktost, + 0 wast hoe Hace 308A Tot 2mm || cw Poping Tine #151 Mia ||| 01228 016 mb sw 150m S900 am Thc Tie Request Sifey Min Beson ‘ni hein eno a 2st Tat oat Schlumberger 950F CASING Ist - CEMENTING JOB CALCULATION pum Volume Calcatation & Job Procedure Yas ceo + es Wace oe avregeu WMO a2 os Yoon ott Tepes at 2h peso he cree won ua Stuer Dosiga & Esimttion TEAST ram stunee nro map eg Teporat on Tee TRS 20» LM ave 1S Tan stuany 1 ons ioe ey ” a ‘sracen Meant oi? 20" CASING TALLY Well # DH-14X Comnany: _VIETSOVPETRO Rig: OCEAN GENERAL Dato. SsJuno2 = i Length, Connect-| Cum. ‘Centraliz- Joint # e 0 inet | Crag me Comments FS_]_038 [R55 Taat Shoe so] 1183 [Ks ZEW cs 55, bai Colar zc Ki Tx bow a8, £35 4 35 Tew 46 KS 45 KSo = aa 55, Tx Bow 43 | 11.10 | K-38 — az) 1188 411488 [Txbew ao [186 IC 38 i Taba Txbaw Tew Tx bow mt Taba Tbe 7 | txnga | Tenge Dergid Trig tN STO Pax LpaE SAP een} ear fSeiension Joint [Reusing 09 rep of 30" Housing [Top of 18 /4"Housing | VSP Drilling Supervisor VSP Drilling Engineer Liban Patrick Thomas 30” CASING & CEMENTING REPORT Well # DHX Company: VIETSOVPETRO Rig: OCEAN GENERAL Date: 2adun-2002 Casing Details: Depth, m Item Length, m (bottom) 30° Shoe Joint, 1" Wall Thickness, 12.32 197.00 X-56 Grade, Lynx SA Conn. 3x Intermediate Joints, 1” Wall 36.66 194.68 Thiokness, X-56, Lynx SA Conn 30" Housing w/ 30” Extension Joint 1241 148.02 1.5" Wall Thickness, X-§6, Lynx SA Top of 30” Housing at: 135,61 m Drilled 36” hole through TGB with seawater retums to seabed from 137 m (seabed) to 198.6 m sweeping hale w/ 8 m of prehydrated bentonite mud each stand. At TD displaced hole to PHB mut. Rigged up to run 30" casing. Picked up shoe jcint + 3 x intermediate joints + 30° housing extension wi Housing + Running Tool + 5° HWDP. RIH and landed 30° Housing onto PGB at the moonpool Disconnected running toal and POOH. Attached 38 m of 5" DP to the running tol as a stinger. Ran back to the moonpoo! and re-connected to the 30" Housing, Ran 30" casing on 5° KWDP 197 m, landed 30" Housing onto TGB, hold the string in tension, Check deviation wi TV camera (0.75". Circulated hole clean. Rigged up cement line. Prassure tested line to 200 bar. Mixed and pumped 38 m? of 1.8986 cement slurry w/"G" cement + 0.02gps 0047 + seawater. Displaced cement w/ 7.3 m’ of seawater, W.0.C. w/the string in tension till cement harden, Disconnected running too! and POOH. End af job. VSP Diiling Superviscr JF Patrick Thomas VSP Driling Engineer LE- Bul Minh Ho

You might also like