RESPONSIBILITY TABLE – VSP & TOS

NO. ACTION & SERVICES ACTION PLAN & ACTION PARTY


REQUIREMENT
VSP & TOS
Bid Preparation
1. Technical Proposal TOS shall prepare following technical
documents for VSP to review.
 Project Schedule
 P&A Program
 Risk Assessment
 Time Plan
VSP & TOS
Bid Preparation
2.
Commercial Proposal Based on P&A Program & Tender
Requirement, VSP & TOS shall obtain
budgetary costing for all services tp prepare
Commercial Proposal
VSP & TOS shall select & secure JU Rig
Jack up Rig
3. for Project.

The best option is to utilize Deep Driller 3


contracted by VSP
Well P&A related services VSP & TOS
3. with below table based on
TLJOC Requirement VSP shall propose all possible services
which VSP can provide
TOS shall select other services which VSP
cannot provide
TOS
ROV services
4.

Provision of Support Vessel: VSP shall propose possible vessels which


VSP can provide
- Anchor Handling Tugs
6. VSP & TOS shall select other vessels
- Supply Vessels which VSP cannot provide
- Towing Tugs
TOS
Site Survey (Debris Survey) with
7. Side Scan Sonar

Recovering of Well Protection TOS


9. Structure & SS Template
Well P&A Related Services
Ite Description Possible Service Contractors
m
A1 Cement Unit & services Depending on Unit installed on selected
Rig
A2 Drilling Fluid services VSP can provide????

A3 ROV Service TOS as above Table

Ạ4 Supply Vessels Plus towing vessel As above

A5 Casing Cutting & fishing services VSP can provide???? Or PVD-BOT

A6 VSP can provide????


Casing Running Services
A7 Wireline services VSP can provide???? But it should be
optional.
A8 Mudlogging services VSP can provide????

A9 Positioning Services TOS

A12 Surface wellhead & services PVD Tech

A12 Drilling bit ( contingency) VSP

A13 Communication services VSP

A14 Helicopter services VSP

A15 Supply of MGO fuel and water ???

A16 Supply base Services VSP

A17 Debris survey for rig move TOS as above

A18 Corrosion cap retrieval services & Tie PVD Tech or GE Vetco or NU Star
back tools running services
A19 Weather forecast VSP

A20 The Other Services Other required minor services shall be


determined after completing detailed
procedures.