You are on page 1of 4

Project

BP Block 31 - Survey Scope A - Hull Gauging


name
Project
SB82289
number
Client BP
Date 1/22/2020
Revision 0

Vendor ASOM

No Clarification description

1 Please provide a copy of Tristar Ultrasonic Thickness Measurement Procedure

2 Please confirm Tristar's UTM procedure is approved by ABS

Can the tensioned anchor lines be used for inspection of main deck stiffeners
3
for center tanks?

4 Please confirm if tensioned anchor lines can be used for inspection of all SOW
for center tanks; if not, what will be the alternative method?
If need to use the Horizontal Tensioned anchor lines how much will that affect
5 the overall schedule for the center tanks where access is suspect for the
locations under the center webbing?

Able to scale and modify manpower requirements to meet project schedule?


6
I.E. can readily get more persons?

Vendor to confirm they will comply with all project environmental


7
requirements, control of work and work permits systems.

8 Does vendor have in-house confined space training/experience?

9 Can the vendor provide an example of a daily report they propose for use?

10 Please provide CVI procedure for review

11 Please provide CVI certificates

12 Please provide track record for tank gauging


Will use of unmanned assets reduce durations for 'Base Scope Tanks' as well
13
as 'Additional Tanks UTM + CVI' & 'Additional Tanks CVI + Potential UTM'

14 Is price for drone included in pricing for Drone Operator?


Pricing sheet covers only site inspection team, no allowances made for office
15
support or overhead?

16 Please confirm duration needed between placement of PO and start of work?


Response Note

Refer to Appedix A - UTM procedure.

No procedure approved by ABS except UTM certificate approved by


ABS. Refer to Appendix B - Hull Gauging Certificate.

gavin

gavin

gavin

In event Owner ask for additional manpower, Tristar able to provide


additional team / more person as required by Owner.

Tristar is a certified company for ISO 45001:2018. ASOM is a


certified company for ISO 9001:2015 and ISO 45001:2018. The rest
of work documents will follow SBM Code of Practice. Refer to
Appendix C - Company ISO certification.

Sample of confined space certificate already attached at page 26 of


29 in previous submission. All confined space certificates will be
submitted after PO issued. Refer to Appendix D - Sample of
Confined Space Certificate.

Tristar will use ASOM's DPR format.

Refer to Appendix E - Operation Procedure (CVI).

Not applicable, based on experience. Tristar has a lot of experience


as part of class survey requirement. Especially for tanker. Bulk
carrier and general dry cargo ship.

Refer to Appendix F - Tristar's UTM Final Report.


Tristar have 2 unit of Drone equipment with operator to execute
'Base Scope Tanks' as well as 'Additional Tanks UTM + CVI' &
'Additional Tanks CVI + Potential UTM'
PT

PT

Tristar requested 2 weeks notification (PO) in advance prior to start


work.