You are on page 1of 18

Final Year Project Presentation

“ECO-FRIENDLY PADDY THRESHER MACHINE”

JAHANGIRABAD EDUCATIONAL TRUST


GROUP OF INSTITUTION
PRESENTED BY:-

• MD. MARGHOOB (ME-1654540016)


• MD . GHYASUDDIN (ME-1654540012)
• MD. MASOOQUE (ME-1654540017)
• MD. SAJID (ME-1654540019)
• TAUSIF IQBAL (ME-1654540041)
• MD. MAHTAB ALAM (ME-1654540015)
• ATIF JAVED (ME-1654540027)
• AZAHAR UDDIN MONDAL (ME-1654540008)

PRESENTED TO : - (INTERNAL ADVISOR)


Mr. MOHD. FARUQUE
FINAL YEAR PROJECT COMMITTEE (SUPERVISOR)
DEPARTMENT OF MECHANICAL
ENGINEERING MR. NAPHIS AHMAD
ASSISTANT PROFESSOR
( DEPARMENT OF ME )
PRESENTATION FLOW

 Project objective
 Introduction
 Features of Project
 Block diagram
 Components
 Structure of Thresher machine
 Specification
 Time and Cost analysis
 conclusion
PROJECT OBJECTIVE

The most important objectives of Paddy


Thresher machine:
 The users have appreciated its
performance and adopted this
machine with lower investment.
 Provide ecofriendly machine.
INTRODUCTION

Paddy thresher machine: A paddy thresher machine is


a piece of farm equipment that
separating the grains from the stalks.

Types of paddy thresher machine:-


 Angle bar types
 Wire loop types
 Spike tooth types
• Rasp bar types
Features of project
There are various features of our project:-
 It is much lower cost paddy thresher machine.
 Its efficiency is high.
 It is ecofriendly machine.
 It can be move from one place to other along
with less effort.
 Good fabrications work.
 Easy to maintenance.
BLOCK DIAGRAM
Structure of paddy thresher
machine
PARTS OF THE MACHINE
SPECIFICATIONS

 Overall dimensions(in cm) : L-200 , W-75 ,


H-120
 Weight – 40 kg (approx.)
 Thresher cylinder speed (rpm)- 250-300 rpm
 Cleaning system:- Blower
 Feeder capacity:-700 kg/hr
 Grain output:- 250 kg/hr
TIME AND COST ANALYSIS

TASK TIME ITEMS COST

Research Work 1 week Paddy thresher


machine Rs 0/=
System designing 1 week All parts
Rs 0/=
Hardware 1 months Travel Charges
designing Rs 20000/=

Report writing / 1 week Other Expenses


presentation (Including
Rs 0/=
Documentations)

Total Time 2 months Total


Rs 20000/=
CONCLUSIO
N
This project offers the following
facilities.
• Superior Controlling.
• Eco-friendly
• Affordable cost
Please watch one short
clips

You might also like