You are on page 1of 3

Evaluation Report AutoStar

Project: EST. DE COORDINACION


Location: LA VICTORIA
Contract:
Engineer:
Filename: C:\ETAP 1600\GAMARRA\GAMARRA.OTI
Date: 17-09-2019

Revision: Base
Configuration: Normal
Study Case: SM
Evaluation*: Protection& Coordination
Fault Type*: Phase& Ground
Rule: ETAP Default (IEC)
Rule Reference:
Rule Description:

* Maximum symmetrical short circuit current used for evaluation.

Evaluation Report: 486547245.xls Page 1 of 3


Classification Zone ID Zone Type Device ID Type Condition
Warning
Cable18 Branch Cable18 Cable Valid upstream or downstream protective device not found for
-
coordination

[General] Evaluation Report: 486547245.xls Page 2 of 3


Cable / Line Protective Device Cable Protection Max Fault Reference
ID Pickup Damage 3Ph-Amps kV
Location Device ID Type Ampacity Condition
Limit Curve Not considered for limit evaluation based
OCR-IOC - - Pass
Cable18 Source RS12 OCR- on rule setting
Cable is underutilized due to LT Pickup 8149 22.9
Pass Warning Pass
TOC (OC2) 30 A < 201.6 A = Ampacity x 80%

[Cable | Line Protection] Evaluation Report: 486547245.xls Page 3 of 3

You might also like