Distribution Board: DB-FFL-N-C02-1 LOAD DISTRIBUTION SCHEDULE Electrical Room
LOCATION:
Fed From: SMDB-LGL-N-C03-1 REVISED (SV-M1-04)
(N-C02)
Rating of Incomer: 32 A,TP ISOLATOR
CCT ECC
MCB CONNECTED LOAD/POINTS Rated Load Each (W)
ELCB SL Cir Wire Wire
Rating Room / Area Rated Load Each (W) Remarks
Rating No. No. Size Size 13A S. 13A T. 13A COOKE 15A S. WAT.
Amps LTG C. FAN EX FAN SH. S/O W/H H/D OTHER R Y B
Sq.mm Sq.mm S/O S/O FCU R S/O PUMP
01. R1 20 4.0 4.0 FF-CORRIDOR - (ZONE -1) 1 50 50
40A, 4P,
100mA, 02. Y1 - - - SPACE - -
SEC-1
03. B1 - - - SPACE - -
04. R2 - - - SPACE - -
40A, 4P,
30mA, 05. Y2 20 4.0 4.0 FF - WATER METER ROOM - (ZONE -1) 1 200 200
SEC-2
06. B2 20 4.0 4.0 FF- ESCALATOR - (ZONE -1) 2 200 400
14. Y5 10 2.5 2.5 FF-BOH CORRIDOR (FL1) - (ZONE -1) 2 100 200
17. Y6 10 2.5 2.5 SFF-HOP FRONT HIGH STREET(LL-506) - (ZONE -1) 5 50 250
4.05 kW