Project: DUBAI HILLS ESTATE MALL PROPERTY

First Floor
Distribution Board: DB-FFL-N-C02-1 LOAD DISTRIBUTION SCHEDULE Electrical Room
LOCATION:
Fed From: SMDB-LGL-N-C03-1 REVISED (SV-M1-04)
(N-C02)
Rating of Incomer: 32 A,TP ISOLATOR
CCT ECC
MCB CONNECTED LOAD/POINTS Rated Load Each (W)
ELCB SL Cir Wire Wire
Rating Room / Area Rated Load Each (W) Remarks
Rating No. No. Size Size 13A S. 13A T. 13A COOKE 15A S. WAT.
Amps LTG C. FAN EX FAN SH. S/O W/H H/D OTHER R Y B
Sq.mm Sq.mm S/O S/O FCU R S/O PUMP
01. R1 20 4.0 4.0 FF-CORRIDOR - (ZONE -1) 1 50 50
40A, 4P,
100mA, 02. Y1 - - - SPACE - -
SEC-1
03. B1 - - - SPACE - -

04. R2 - - - SPACE - -
40A, 4P,
30mA, 05. Y2 20 4.0 4.0 FF - WATER METER ROOM - (ZONE -1) 1 200 200
SEC-2
06. B2 20 4.0 4.0 FF- ESCALATOR - (ZONE -1) 2 200 400

07. R3 20 4.0 4.0 FF- CORRIDOR - (ZONE -1) 1 400 400


40A, 4P,
30mA, 08. Y3 20 - - SPARE 600 600 PROVISION
SEC-3
09. B3 20 - - SPARE 200 200

10. R4 10 2.5 2.5 FF- SHKYLIGHT P1 - (ZONE -1) 4 50 50


40A, 4P,
100mA, 11. Y4 10 2.5 2.5 FF- F.O.H CORRIDOR D13 - (ZONE -1) 2 50 50
SEC-4
12. B4 10 2.5 2.5 FF-TREE FLEX - (ZONE -1) 2 200 400

13. R5 10 2.5 2.5 FF-WATER METER ROOM (FL5) - (ZONE -1) 1 50 50

14. Y5 10 2.5 2.5 FF-BOH CORRIDOR (FL1) - (ZONE -1) 2 100 200

40A, 4P, 15. B5 10 - - SPARE 200 200


100mA,
SEC-5 16. R6 20 4.0 4.0 FF-SIGNAGE - (ZONE -1) 4 200 800 LED ADVERTISEMENT

17. Y6 10 2.5 2.5 SFF-HOP FRONT HIGH STREET(LL-506) - (ZONE -1) 5 50 250

18. B6 10 - - SPARE 200 200

1350 1300 1400 Watts

4.05 kW

CABLE SIZE

1x4C 10 sq.mm XLPE + LSF