RISHAV SINGH.
Department of Civil Engineering
Dream Institute of Technology
Thakurpukur, B.H. Road, Kolkata- 700104
Abstract
followed one principal faith — two of the without Vallabhbhai Patel. But perhaps
most potent reasons that break nations the most important void that the Statue of
apart. There was, of course, no such Unity might fill is that of the trio that led
uniformity of language or religion in India India’s struggle for freedom only Patel
that more than five hundred princely states never told his story. Both Gandhi and
could be merged — without, as Soviet Nehru wrote voluminously about the saga
premier Nikolai Bulganin noted, as they saw it. But Patel, when asked by
eliminating the princes. That no royal head his daughter why he didn’t write his
rolled during the integration of princely version, famously said that some write
states with British India to create the history and others create it. But this statue
modern nation state was almost entirely might just fill the gap.
due to Vallabhbhai Patel. Moreover, as 1.4. The Tallest statue in the World: The
Patel biographer P. N. Chopra noted, ‘Statue of Unity’ (SOU) is dedicated to the
“Sardar’s India was greater in size than Iron Man of India, Sardar Vallabhbhai
that of Samudragupta, Asoka and Akbar, Patel. Sardar Patel is widely considered to
and the writ of the Centre wielded an be the architect of modern India. The SoU
authority and respect never dreamt of by will stand tall as an inspiration to future
these great rulers.” This is why it is apt generations, a reminder of Sardar Patel’s
that the statue of Patel is called the “Statue sterling contribution.At 182 meters from
of Unity”. There are at least 15 statues of the road entry and 208.5 meters from the
Jawaharlal Nehru around India, including river entry, the SoU will be the tallest
by Ram Vanji Sutar, who has designed the statue in the world; taller than the 153 m
Statue of Unity. There are statues of M K tall Spring Temple Buddha in China and
Gandhi in nearly 70 countries, one of the almost twice as tall as the world famous
most recent being the one that came up in Statue of Liberty in New York. For a sense
2015 at London’s Parliament Square, after of its height, the statue is 100 times larger
a well-publicised campaign led by than a man of average height of about 5 to
economist-politician Meghnad Desai. 5 and a half feet!
True, Patel also had a couple of statues to
his name, but none that recognized his
contribution to the national movement on
par — as it undoubtedly was — with
Gandhi and Nehru. That is why, when
Rajmohan Gandhi wrote his book on Patel
more than two decades ago, he complained
that while praise given to Gandhi was
dutiful, and to Nehru fulsome, it was
niggardly about Patel. This concern is
supported by a couple of telling examples.
Nehru got a Bharat Ratna as a sitting Fig: Comparing the Height of Sardar Patal
prime minister in 1955, while Patel’s Statue with Others.
award had to wait till 1991. Gandhi and 1.5. Features of Sardar Patel Statue
Nehru even got their own adjectives – • An exhibition centre at its base
Gandhian and Nehruvian – but there is no showcasing the life and achievements of
‘Patelian’. This is so because Patel’s Sardar Patel
contribution has barely been recognised in • A 320 m long designer bridge connecting
the way Indian history is learnt. Most Sadhu Hill to the mainland
Indians do not understand that the map that • A memorial and visitors’ centre
they have been taught to call India would • 4-lane approach road
not exist, or would look very different,
• An administrative complex, 3-star hotel statue base also stands above the highest
and conference centre flood level recorded over a 100-year
• A 40-m suspended fabric roof structure period of the nearby Narmada dam. A
for the visitors’ centre detailed hydrological study was conducted
1.6 Engineering Challenges: Wind, by a specialist consultant to ascertain the
Earthquakes: Natural factors like wind and river level and flow during various
earthquakes posed stiff challenges. conditions. Altogether, the statue is
Situated right in the middle of the river divided into five zones. Up to its shin is
Narmada, the statue is exposed to the the first zone, comprising three levels,
tunnel effect of winds blowing down the including an exhibit floor, mezzanine and
river. Studies of wind patterns over the roof. It will contain a Memorial Garden
years revealed wind speeds of 39 m per and a large museum. Zone 2 extends up to
second (roughly translated into 130 the statue’s thighs at 149 meters, while
km/hr.) could buffet the statue in a worst- Zone 3 goes up to the viewing gallery at
case scenario. The statue has been 153 meters. Zone 4 and Zone 5 would be
engineered to withstand wind speeds of up out of reach of visitors, with Zone 4
to 50 m per second (almost 180 km/hr.). comprising the maintenance area and Zone
The challenge is not only of the wind 5 the head and shoulders.
blowing against the statue but the 2. METHODOLOGY
succession effect it creates at the back of 2.1. Structural Design: Part of the statue
the statue that had to considered in the enclosed inside the 8mm bronze cladding
structural design. is a two-layered structure. The innermost
1.7. Walking pose of the Sardar: The layer has two 127-metre-high towers made
Sardar’s legs are clad in a dhoti, his feet in of reinforced cement concrete. These
chappals and in a walking pose that means towers rise up to the chest area. The steel
that the statue is most slender at the base. frame between the towers and the cladding
The walking pose also opened up a gap of forms the second layer. There were
6.4 meters between the two feet which multiple engineering challenges too. One,
then had to be tested to withstand wind unlike the Statue of Liberty and Christ the
velocity. Redeemer, the Statue of Unity does not
1.8. The Face: Another challenge came in have a wider base.
the form of the look of the statue. Since A wider base is required to make a
Patel’s face was an important aspect, structure stable. As Patel wore a dhoti, the
special care was taken in casting the facial statue is thicker towards the top and
features that had to be as close as possible thinner at the bottom. This challenge was
to the Sardar’s face. The statue is also overcome by keeping the slenderness ratio
supposed to appear as if it is walking on between the width of the statue and its
water, towards the Sardar Sarovar dam, height to 16:19 — significantly higher
with its left leg slightly forward. The than the 8:14 ratio rule that is followed in
actual features of the Sardar were decided the construction of high-rise structures.
through a participative exercise involving Two, the base of the statue, below the
thousands of people. A mock-up was dhoti-clad legs, is about 25 metres high,
created and exhibited for people to see and equivalent to an eight-storey building. This
comment on it. part of the structure houses two massive
1.9. Movement of Men and Material: lifts, which can carry over 25 people to a
The statue is located amidst 135-metre high gallery in just above half a
remote, mountainous terrain, which posed minute.
enormous difficulties in delivery of Fitting these vibration-causing
materials. A temporary Bailey’s bridge machines inside the statue’s two vertical
connected the hill to the mainland. The
cores, the first of its three layers, was a was estimated to be about 20.63 billion
challenge for the engineers. (US$290 million) by the government. The
Three, engineers had to factor in tender bids for the first phase were invited
the speed of wind, and the possibility of in October 2013 and were closed in
earthquakes and flood. Being built on an November 2013. Narendra Modi, then
island in the middle of Narmada, the statue serving as Chief Minister of Gujarat, laid
will have to face the tunnel effect of winds the statue's foundation stone on 31 October
blowing down the river. The walking pose 2013, the 138th anniversary of Patel's
of the statue opened up a gap of 6.4 metres birth.
between the two feet. To deal with these
issues, the cladding used in the statue has
overlapping panels, which allow it to move
vertically and horizontally, to resist
earthquake and wind forces. Two 250-
tonne mass dampers, which are installed in
structures to reduce the amplitude of
vibrations, have been used.
As a result, the statue is capable of
withstanding wind blowing at almost 220
km per hour and surviving earthquakes
measuring up to 6.5 on the Richter scale.
Four, the statue’s location amidst remote,
mountainous terrain made transportation
of equipment and material difficult. To
make the movement to the island easier, Fig: Constructional Phase of Statue
the engineers banked on the fact that the Indian infrastructure company
island remains accessible from one side of Larsen & Toubro won the contract on 27
the river via land for at least eight months October 2014 for its lowest bid of 29.89
post monsoon as water in the channel billion (US$420 million) for the design,
recedes. A rock bridge was built over construction and maintenance. They
shallow water and a temporary Bailey commenced the construction on 31
bridge was constructed for the monsoon, October 2014. In the first phase of the
when there is more water in the river. Over project, 13.47 billion were for the main
210,000 cubic metres of cement concrete, statue, 2.35 billion for the exhibition hall
18,500 tonnes of reinforced steel, 6,500 and convention centre, 830 million for the
tonnes of structural steel, 1,700 tonnes of bridge connecting the memorial to the
bronze, and around 1,850 tonnes of bronze mainland and 6.57 billion for the
cladding, made up of some 565 macro and maintenance of the structure for 15 years
6,000 micro panels, were used to build the after its completion. The Sadhu Bet hillock
statue. Most of this material was moved was flattened from 70 to 55 metres to lay
using the two bridges. the foundation. L&T employed over 3000
3. CONSTRUCTION workers and 250 engineers in the statue's
A Consortium comprising Turner construction. The core of the statue utilised
Construction, Michael Graves and 210,000 cubic metres (7,400,000 cu ft) of
Associates and the Meinhardt Group cement concrete, 6500 tonnes of structural
supervised the project. It took 56 steel, and 18500 tonnes of reinforced steel.
months to complete – 15 months for The outer façade is made up of 1700
planning, 40 months for construction and tonnes of bronze plates and 1850 tonnes of
two months for handing over by the bronze cladding which in turn comprise
consortium. The total cost of the project 565 macro and 6000 micro panels. The
bronze panels were cast in Jiangxi The constitutional provisions are backed
Tongqing Metal Handicrafts Co. Ltd (the by a number of laws — Acts, Rules, and
TQ Art foundry) in China as suitable Notifications. The Environment Protection
facilities were unavailable in India. The Act, 1986 came into force soon after the
bronze panels were transported over sea Bhopal Gas Tragedy and is considered an
and then by road to the workshop near the umbrella legislation as it fills many gaps in
construction site where they were the existing laws. Thereafter a large
assembled. number of laws came into existence as the
Local tribals belonging to the Tadvi tribe problems began arising, for example,
opposed land acquisition for the Handling and Management of Hazardous
development of tourism infrastructure Waste Rules in 1989. The Environment
around the statue. They have been offered (Protection) Act, 1986 authorizes the
cash and land compensation, and have central government to protect and improve
been provided jobs. People of Kevadia, environmental quality, control and reduce
Kothi, Waghodia, Limbdi, Navagam, and pollution from all sources, and prohibit or
Gora villages opposed the construction of restrict the setting and /or operation of any
the statue and demanded the restitution of industrial facility on environmental
the land rights over 375 hectares (927 grounds. 1986 - The Environment
acres) of land acquired earlier for the dam (Protection) Rules lay down procedures for
as well as the formation of new setting standards of emission or discharge
Garudeshwar subdistrict. They also of environmental pollutants. The
opposed the formation of Kevadia Area environmental Protection Act, 1986 is an
Development Authority (KADA) and the ‘Umbrella’ Act enacted by the national
construction of Garudeshwar weir-cum- parliament. This Act empowers the
causeway project. The government of Government to take all necessary measures
Gujarat accepted their demands. to protect control and abate environmental
Construction of the monument was pollution. The Act identifies the MoEF,
completed in mid-October 2018; and the Government of India as the apex nodal
inaugural ceremony was held on 31 agency to deal with environmental
October 2018, presided over by Prime problems of nation so that an integrated
Minister Narendra Modi. The statue has and holistic policy can be implemented
been described as a tribute to Indian with regard to the environment. The scope
engineering skills. of this Act is very broad covering water,
3.1. Environmental clearance: In the Air, Land and human beings and other
Constitution of India it is clearly stated living creatures. The main functions of
that it is the duty of the state to ‘protect MoEF are:
and improve the environment and to • Coordination of the activities of various
safeguard the forests and wildlife of the central and state authorities established
country’. It imposes a duty on every under the previous Acts;
citizen ‘to protect and improve the Natural • Laying down emission/ effluent standard
environment including forests, lakes, for various industrial activities;
rivers, and wildlife’. Reference to the • Powers to get information about the
environment has also been made in the industrial process and to inspect the plant,
Directive Principles of State Policy as well premises, records and other necessary
as the Fundamental Rights. The materials including seizure of the
Department of Environment was documents;
established in India in 1980 to ensure a • Giving direction for closure, prohibition
healthy environment for the country. This or regulation of industrial processes as
later became the Ministry of Environment necessary and
and Forests in 1985.