PROCEDURE
PRE-PIGGING ACTIVITIES
ENSURE THAT THE FOLLOWING VALVES ARE ON OPEN
POSITION.
Open the vent valve and vent the launcher barrel to atmospheric pressure and
leave open.
Open the pig launcher drain valve to drain off any liquid and leave open.
When the pig launcher barrel is completely drained, with the vent and drain
valves still open, open the launcher door (closure).
LAUNCHING THE PIG CONTD
Insert the pig as far as possible into the nominal bore section of the barrel.
Inspect and lubricate the launcher door seal, locking mechanism and hinges. Replace seal if
damaged.
Confirm pig launcher pressure and line pressure are the same.
Partially close the main line valve. This will increase the flow through
the kicker valve and behind the pig.
LAUNCHING THE PIG CONTD
Continue to close the main line valve until the pig
leaves the trap into the main line as indicated by
the pig signaler.
Open the vent valve to depressurize the pig launcher to zero bar
Crack open the by-pass valve to gradually pressurize the receiver barrel, allowing
gas to vent for at least 3-5 minutes, then close the vent valve and allow pressure in
the receiver barrel to build up to the line pressure.
20%
40%
50%
Monitor pressure profile every 30minutes and ensure the pig travels at the
calculated speed
Continue venting until liquid is seen at the outlet of the vent valve
Close the vent valve immediately and open the drain valve to drain liquid
into the slop tank
RECEIVING THE PIG CONTD
Isolate the drain valve when slop tank is fille
Depressurise the receiver barrel to zero bar via the vent valve
Close the trap drain valve and leave open the vent
valve for purging and line up
RECEIVING THE PIG CONTD
Close the vent valve after purging for 10minutes.
Demobilize.