TECHNICAL ANNEXTURE & SCOPE FOR TUBE FINNING

Sr. No. QUANTITY (NOS.) 388 224

1 Drawing No S6-A2-AQC9-M-117 S6-A3-AQC9-M-100


TUBE DESCRIPTION (Free Issue by SCL)

2 TUBE OD x THICK (MM) 38.1X3.2 38.1X3.6

3 TUBE MATERIAL SA 213 T22 SA 213 T22

4 OVERALL LENGTH (MM) 3620 5815

5 FINNED LENGTH (MM) 3365 5665

6 BARE END (MM) 90 75

7 BARE END (MM) 75 75

FINNED DESCRIPTION

High frequency Resistance High frequency Resistance


8 FINNING PROCESS
Welded Welded

9 TYPE SOLID SOLID

10 FIN MOC SS 409 L SS 409 L

11 HEIGHT (MM) 12.7 12.7

12 FIN THICKNESS (MM) 1.27 1.27

13 FIN PITCH (MM) 10.5 12.7

14 FINNING BREAK (MM) 90 CONTINUES

15 FPM 95 78

WORK SCOPE

15 HYDRO TEST 10% 10%

IBR FORMALITIES (AS PER IBR REGULATION


16 WITHOUT IBR WITHOUT IBR
1950 & ITS LATEST AMENDMENTS )

VENDOR WILL SUBMIT GAD & QAP FOR APPROVAL TO SCL & WILL START MFG. ONLY AFTER APPROVAL AT SCL
17
END

18 TUBE CLEANING IN VENDOR SCOPE FOR FINNING (BARE TUBE SUPPLY BY SCL ON FOC BASIS)

BEFORE START OF THE MANUFACTURING ALL RAW MATERIALS (Fins) TEST CERTIFICATE WITH SAMPLE
19
TESTING RESULT SUBMISSION FOR APPROVAL To SCL

20 MATERIAL TO BE DISPATCHED ALONG WITH ORIGINAL IBR T.C. ONLY & REQUISITE MTC.

21 SCL MAY GO FOR TPI FOR FINAISHED GOODS FOR WHICH VENDOR WILL INFORM WELL IN TIME

22 AFTER FINAL READINESS OF MATERIAL ALL TUBES & STUB ENDS MUST BE FITTED WITH PVC END CAPS.

PROPER PACKING TO BE ENSURED BEFORE DISPATCH OF MATERIAL TO AVOID ANY TYPE OF IN-TRANSIT
23
DAMAGE