You are on page 1of 4

Manoj Kumar

E-mail:- manojec07@gmail.com, hariom.manoj@hotmail.com


Contact No: - +91-9826776857 / 8962000500

WIRELESS ENGINEER
With 8 Years 8 Months of Experience in:
LTE TDD FDD WCDMA & GSM

Possess excellent interpersonal, analytical, troubleshooting and team building skills with proven
ability in establishing quality systems / procedures and planning / managing resources.

PROFESSIONAL EXPERIENCE

Huawei Telecommunication (I) Co. Pvt. Ltd.


Tenure:  15th Mar 2018 to Present
Designation: NOC/Planning Engineer (RAN)

 Configuration of GUL, TDD, FDD, MIMO, Small Cells through CME.


 Operation and Maintenance of Huawei BSC & RNC 6910 & U2000.
 Integration & Swapping of new Nodes.
 Operational support, Technical support (L2) - troubleshooting and debugging critical network issues,
Performance optimization– RAN/LTE (CSFB, SRVCC) KPIs.

Previous Employment: -
TATA Teleservices Ltd (TATA Communications)
23rd Feb 15 to 15th Mar18
Designation: Lead-Field Operations (RAN)

 Operation and Maintenance of Huawei BSC & RNC 6900, M2000 & U2000, BTS & NodeB 3900 &
3900A.
 Operation and Maintenance of Huawei BSC & RNC 6900 & U2000.
 Configuration support, Technical support (L2) - troubleshooting and debugging critical network
issues, Performance optimization– RAN KPIs.
 Support to Field Engineers in GSM BTS & NodeB integration, Troubleshooting and others scopes.
 Huawei 3900 & 3900A NodeB Integration, Installation, Configuration file (XML) for NodeB creation
through Huawei CME and Configuring of NodeB on RNC as per Network Design and implementing
with speed and Quality.
 Supervision of RNC’s Operations & Maintenance, fault management and troubleshooting as well
Support.
 Power Upgrade, Installation & Configuration for High BB capacities, HSDPA & HSDPA+ features.
 Reconfiguration of IUB & RNC Daily Alarms Monitoring, Re-configuration & Troubleshooting of
RNCs.
 Planning and effecting switching activities in maintenance schedules to increase the up time Of Back
Bone OSP Link and reliability of the equipment’s (SDH, DWDM).
 Conducting surveillance & maintenance of TCL/TTL OSP Route.
 Identifying areas of obstruction / defects and Conducting service and repair to rectify the OSP Link
through the application of trouble shooting tools.
 Co-ordination with Infra Team for preventive & corrective maintenance of Utility Equipment’s like
DG, AC & Battery Banks for TCL NLD Sites.
 Infra alarm extend alcatel SDH & Huawei DWDM for monthly testing NLD Sites.
 Coordinating with other TSP, private vendor & Govt. vendor to track expansion & any other type of
work in OSP route and planning to save the Fiber cable route.
 Analyzing all SDH related faults & overcoming the cause of fault.
Aircel Limited
Tenure:  25th Jul 2014 to 20th Feb 2015
Designation: O&M Engineer (RAN Engineer)

 Manage O&M of Aircel network in Gwalior and Bhopal zone.


 Carry out schedule preventive and corrective maintenance and attend to faults escalated from NOC
 Support circle RF Team in all type of regulatory compliance and testing conducted by TRAI from time
to time through the year.
Samsung Electronics (I) Pvt. Ltd.
Tenure:  28th Feb 2014 to 25-Jul-2014
Designation: eNodeB Engineer/Quality Engineer
 Reliance Jio 4G Project, MP
 

 Main interface in cross-functional project teams and manage strategic relationships with clients,
contractors and channel partners.
 Installation & Commissioning (Deployment) of Samsung LTE eNodeB.
 Support to Field Engineers in eNodeB integration, Troubleshooting and others scopes.
 Technical Support in LTE Network.
 New site Addition, Parameter Audit, RET Configuration.

Huawei Telecommunication (I) Co. Pvt. Ltd.


Tenure: 7th Jan 2010 to 27-Feb-2014
Designation: RAN/BSS/Planning Engineer

Projects Handled
Project 1: TATA 3G (MPCG) (Huawei) Project.
 Integration & Commissioning of Huawei RNC 6900 (WCDMA). Software, Patch Up gradations and
License Up gradation of EMS Server M2000 (Linux), RNCs, BSC, NodeB & BTS.
 Deployment of New BSC, RNC, BTS & NodeB.
 BSS monitoring & Stats Analyses through OMC-R report & HW Issues Report generation.
 Verification of Installation & Commissioning of NEs prior to handover to O&M
 Rehoming of NodeBs from one RNC to Other RNC.
 Routine Health checkups of EMS, RNC & NodeB.
 Reporting to Project Manager regarding the projects and send weekly report.
 Managing Vendor and Client collect and analyses the statistics of the site works.
 Handling all the correspondence with corporate bodies like TATA, Alcatel-Lucent and Huawei.
Project 2: TATA GSM (MPCG) (Huawei) Project.
 Installation, Integration and configuration of Indoor BTS 3900, Outdoor BTS 3900A, BSC’s 6000 &
6900 and IBS of Huawei.
 Installation of GSM RF Antenna Systems and implementation of Site Radio Design, adhering to
Antenna Gain, Azimuth, Height and Orientation requirements.
 Sweep test of the Antenna Systems using Bird & Anristu Site masters for verification of VSWR.
 TRX expansions of the existing GSM Base Stations for capacity enhancement.
 Operation, maintenance and expansion of existing Base Transceiver Stations.
 Conducting ATP for BTS & BSC and perform handover on MOS Tool.
 Installation, Commissioning and Troubleshooting of Alcatel MUXs 1660, 1642.

Global Innovsource Solution Pvt Ltd. (GTL)


Tenure: 20 Apr 2009 to Dec 2009
Designation: BSS Engineer

Project 1: MTNL 3G (Mumbai) (Alcatel-Lucent) Project.


 Managing the project of 3G BTS (Alcatel-Lucent).
 Planning for I&C, Integration & Acceptance test with BSNL Team.
 All type of paper work related to this project (PAC, WCC & OTHER).
 Installation, Commissioning & Integration (Deployment) of 3G (D2U-9326) BTS of Alcatel-Lucent.
 Installation, Commissioning & Integration of 3G NODE-B (MACRO-9311) Indoor BTS of Alcatel-
Lucent.
 Completed around 250 sites integration, alarm termination with Quality.
 Handled commissioning and integration of BTS sites. Troubleshooting for all Hardware related faults
in the NodeB.
 Check VSWR, Power and clear Alarms.
Project 2: Aircel GSM (Mumbai & ROM) (Nokia & Huawei) Project.
 Installation of Huawei & Nokia BTS Indoor, Outdoor BTS.
 Diagnosing technical faults in BTS, and clear that’s faults.
 Installation & Commissioning of Huawei MW RTN 950 (Aircel Project).
Project 3: TATA GSM (Mumbai) project.
 Responsible for arranging team that completed BTS or MW installation on time with clearing all the
punch point.
 Ensuring planning and implantation of Projects with schedule time & cost with quality.
 Installation of Huawei BTS Indoor 3900, Outdoor BTS 3900A.

EDUCATIONAL QUALIFICATIONS

 B.E. in Electronics and Communication (2003-2007) from Rajiv Gandhi University of Technology,
Bhopal M.P with 70.5%
 Higher Secondary from M.P Board (2003) with 70%
 High School from M.P Board (2001) with 77%

ACHIEVEMENTS

 Awards from TTSL Circle Head for better performance.


 Core Team Member of EHS Management System for getting ISO 14001:2004 and OHSAS
18001:2007 certificate.
 Got “Rising Star of Year-2010” Award in Huawei Telecommunication.
 Installed and Integrate 250 3G sites and 2 RNCs in Raipur, MPCG.
 Installed and Integrate 300 2G sites and 2 BSCs in Raipur, MPCG.
 Erected 26 Tower in 3 month in Sholapur, MH.

TECHNICAL SKILLS

Telecom Technologies : GSM/WCDMA, Huawei CME, M2000, U2000, MOS Tool, Pathloss 4.0,
SDH, PDH, Bird/Anritsu VSWR/Power Meter, OTDR Tester
Computer Skills : Window’s, MS Office, Linux

PERSONAL DETAILS

Father’s Name : Mr. Shambhoo Ram


Date Of Birth : 18th May, 1986
Pancard No. : AWNPK8131H
Passport No. : J9950294
Marital status : Married
Sex : Male
Language known : English & Hindi.

Place: Pune
(Manoj Kumar)
Dated: 5-Oct-2018

You might also like