1.3 Name of Road: Antliya Game Panchayat Ghar To Ramla Faliya Ghol Faliya Damar Road
1.11 Stage:Stage 1
-Clearing & grubbing, GSB: Gr I 100 mm, GSB Gr II 100 mm , WMM 125 mm, BBC 37.50 mm, Carpet 25 mm,
Seal coat 0.018 cu m per 10 sq mt , CD Work, Road furniture.
Observations:
1 Y Y Y Y Y
* If Engineer of Agency is Not Present on Site Then Proposed Dissection as per Tender Clause(i.e Rs
16500/-Month)
Grading : S
1 YES YES
3.0 GEOMETRICS :The QM Should Take at least two measurements in 1 KM length and if found that
the Roadway and Carriageway is inadequate QM may take more observation.
Observation -item 3 a:Roadway width & Carriageway.
4.0 EARTHWORK :
OBSERVATION -item 4 a:Quality of Material for Embankment/Sub Grade:
On Visual Classification
Location Identify the group symbol & Write Quality of Material is acceptable(Y/N)
(Type of soll)
Grading : N.A
N.A
OBSERVATION -item 4 b:Workmanship for Embankment and sub Grade Construction:
Grading : N.A
N.A
YES NO N.A
Grading : N.A
N.A
5. Sub-Base(GSB)
Observation - Quality of material and Workmanship:
If Mix material is used (Mix Design is done or not) YES
Whether
LAB TEST (AS Per
Suitable Compaction is
Record)
Confirms form Adequate(Y/N) Observed
Prescribed
to plasticity Thickness
Sr No Thickness
Grading angle of Layer(In
Provided(Y/N)
MDD OMC (Y/N) PI & LL mm)
CBR (Y/N) FDD FMC
gm/cc %
0/080 . . . Y Y Y Y 100+100 Y
0/060 . . . Y Y Y Y 100 Y
Grading : S
Filler
Volume
material Whether
Thickness of filler
Aggregate is non- Adequate
Location of each Thickness is material
confirms to plastic to compaction Remarks
(Km) layer of adequate(Y/N) percent
Grading(Y/N) desired is done
WBM(MM) of coarse
extent (Y/N)
aggregate
(Y/N)
Grading : N.A
N.A
Observation - item No 6.(b) Quality of material and Workmanship of WMM;
• If Mix material is used (Mix Design is done or not) YES
Filler
Volume of
material Whether
Thickness filler
Aggregate is non- Adequate
Location of each Thickness is material
confirms to plastic to compaction Remarks
(Km) layer of adequate(Y/N) percent of
Grading(Y/N) desired is done
WMM coarse
extent (Y/N)
aggregate
(Y/N)
0/080
125 Y Y Y . Y .
(Km)
0/060
125 Y Y Y . Y .
(Km)
Grading : S
Whether Coarse
Write Mixing Temperature
Aggregate Whether the Binder is of
Sr No Location and Whether it is in
confirm to approved grade(Y/N)
Permissible limits.(Y/N)
Grading(Y/N)
YES NO N/A
YES NO N/A
Wt of
%
Mix Wt of Mix % Asphalt % Asphalt
Wt.of Asphalt Remarks
with Without w.r.t reqd. as per
Asphalt(gm) w.r.t Pass/Fail
Asphalt Asphalt(gm) Aggregate Specification
Mix
(gm)
N.A
Thickness Whether
Write laying
Surface
and whether
evenness is
Sr Location it is in
within Remarks
No (km) Whether permissible
Thickness acceptable
Thickness is limit
in mm limit
adequate(Y/N) (Y/N)
(Y/N)
Grading : N.A
N.A
Thickness Whether
Write laying
Surface
and whether
evenness is
Sr Location it is in
within Remarks
No (km) Whether permissible
Thickness acceptable
Thickness is limit
in mm limits
adequate(Y/N) (Y/N)
(Y/N)
Grading : N.A
N.A
8.0.C Observations - Workmanship of BT layer(In case of completed works):(Paver Site) FOR : N.A
Grading : N.A
N.A
Grading : N.A
N.A
11.0 CC Pavements
Thickness
Grading : N.A
N.A
12.0 Road Furniture and Marking:
Junction Board NO
Km Stone Fixed NO
1) Para Nos. 13
15. General Observation of SQL(Including the observations made during the interaction with PIU Staff and
contractor's/Consultant's Engineers):
N.A
15.1 Observation about deficiency in project preparation (Give details observation about deficiencies in
general and items which have been left but are required as per site condition)
-> N.A
15.2 Whether the work hase been complete or is in progress as per work program or delay has occurred.if
delay has occurred,whether the liquidated damages have been withhold or recovered
->N.A
15.3 Whether the work has been completed within the sanction cost,if not what is the action taken by the
PIU (in case of complete works).
->N.A
15.4 Observation about the action taken by PIU on the inspecting officers including SQMs and
NQMs.(Clearly offer comments about the action on the observation f Department officers,State Quality
Monitors)
->N.A
15.5 Comment about difference in observation made by NQMs/SQMs in earlier inspection (the NQM Shall
Study earlier inspection report of NOMs/SQMs.if Any adn his Clear Comments about the differences in
observation,if any)
->N.A
Grading : S :
Agency Rating : A
Signature: Signature:
Awarded
Sr.no Item Sub Item
Grading
Quality of Material -
Overall Grading S
SITE PHOTOGRAPHS
Checking thickness of road at ch 0/060 Checking thickness of road at ch 0/060
Checking thickness of road at ch 0/080 Measuring width and camber of road at ch 0/080