PROJECT: JHABUA
INPUT DATA
TOE PROJECTION
β= -0.2987 TOE PROJECTION = -3.5844156 m
SAY 0.00 m
THICKNESS OF STEM
CLEAR HEIGHT OF STEM WALL 11.500 m (Including Surcharge height)
MAXIMUM BENDING MOMENT CREATED AT BASE = 2481.45013 kN-m
EFFECTIVE DEPTH OF STEM WALL AT BASE = 1496.00754 mm
TOTAL DEPTH OF STEM REQUIRED = 1646.0 mm
LET US KEEP TOTAL THICKNESS OF STEM AT BASE = 2700 mm
MINIMUM THICKNESS AT TOP = 600 mm
487137001.xls
496.10 0.6
BACKFILL
647.33
0.00 9.30
3.833
484.60 TOE HEEL
112.580
483.6 A
12.00
Horizontal pressure of
3.83 2481.45 647.33
backfill
Design Constants:- Ref: IS: 3370 (II) Table CONCRETE GRADE M25 Steel HYSD BARS Fe415
GENERAL Earth side (IS-3370) Water side (IS-3370)
σst = 230 N/mm 2 σst = 190 N/mm 2 σst = 150 N/mm 2
Curtailment of Reinforcement
Height upto which half of the reinforcement is to be curtailed
AT HEIGHT 8.40 M FROM TOP d= 1983.91 mm
Bending Moment at this level = 967.05 kN-m
AREA OF STEEL REQUIRED = 2881.96 mm2/m
Using # 25 mm Dia Bars Spacing Required = 170.33 mm
Use # 25 mm Dia Bars @ 170 mm C/C IN ONE LAYER
Area of Reinforcement Provided 2887.49 mm2/m OK
Note: This reinforcement is to be taken upto the top of the wingwall
28.649
324.78 258.2
324.784
Kp = 2.00213
p= 324.784 kN/m^2
Pp= 650.26 kN/m^2
Keep depth of Shear key a= 500 mm
Total Pp = 325.1 kN/m
Total Sliding force at bottom of the shear key Ph= 795.708 kN
Sum (W)= 2916 kN
F.O.S 1.75 LHS= 2.6497
SECTION OF CANTILEVER RETAINING WALL
0.6 m
RL 496.10 m
1.5 m
1.5 m
RL 484.60 m 0.00 m 9.30 m
0.5 m
1.35 m
12.00 m
Note:
A Minimum PCC (M15) of thickness 150 mm should be provided as leveling course before laying the richer concrete mix
The bars should be extended to a length not less than the development length