Harvey Builders RFI#427


3663 Briarpark Dr Phone: (713) 783-8710
Houston, Texas 77042-2008 Fax: (713) 783-5313
Request for Information

Project: Marathon Oil Company RFI No: 427


GC Project No: 01-05133
Arch Project No:
Subject: C&S Level 15 Penthouse Balcony Steel Coordination
Received From: Mike Zeller (Harmon, Inc. - Houston) Received Date: 7/1/2020
Sent By: Riley Brant (D E Harvey Builders, Inc. - Houston) Sent Date: 7/1/2020
Assigned To: Khadija Valika (Kendall/Heaton Associates, Inc.) Response Requested By: 7/10/2020

Copies To: Paul Anderson (Hines Interests LP), Connor Brady (Walter P. Moore (ERP linked)), Riley Brant (D E
Harvey Builders, Inc. - Houston), Justin Estes (Hines Interests LP), Tyler Kids (D E Harvey Builders,
Inc. - Houston), Nathan Smith (D E Harvey Builders, Inc. - Houston), Miguel Stark (D E Harvey
Builders, Inc. - Houston), Fernando Torrealva (Walter P. Moore (ERP linked))
Ref. Drawing(s): Location: C&S Tower>Level 16
Roof
Drawing Link:
Ref. Spec: Cost Code:
Cost Impact: TBD Schedule Impact: TBD

If the information provided within this RFI constitutes a change in contract price; provide immediate notice of such impact and, within (5)
working days from receipt of these RFIs, provide notice of the cost.

Question from Riley Brant (D E Harvey Builders, Inc. - Houston) at 08:15 AM on 07/01/2020
There are coordination conflicts with the level 15 penthouse balcony steel. Attached is a prelim of the issues. A meeting will be scheduled to further
discuss resolution.
Attachments:
Harmon RFI 030 - Steel Coordination Level 15 Penthouse Balcony.pdf

All Replies:

WPM Response:
Please refer to attached modifications to steel support and cantilever concrete beam for support of these wedge
curtain wall components.

WPM Structures
07/20/20

D.E. Harvey Builders Page 1 of 1 Printed On: 07/01/2020 08:15 AM


8 7.6 7 7.3 6 5 4 3 2 1.4 1 0.8

14'-3" 20'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 20'-0" 10'-0" 4'-11" 9'-0 1/4"

9'-11 5/8"
1 A.1
S5.41

1 3/4"

1 3/4"
TB28 TB29 TPG19 TPG20
A
6 TB27
TB26 176.11°

26

26

26
19'-0 5/8" TJ15 TJ16 TJ4 TJ5
TB25

TPG18
TPG17
TJ15 TJ16 TJ3 TJ3 TJ3 TJ4 TJ5


.6
1
82

TJ1 TJ2 TJ3 TJ3 TJ3 TJ3 TJ3 TJ4 TJ5 S5.41

REFER TO TABLE
TO SLAB
TJ1 TJ2 TJ3 TJ3 TJ3 TJ3 TJ3 TJ4 TJ5

46'-11"

H
o
u
s
t
o
n
,
T
e
x
a
s
TPG7
TPG10

TPG5

TPG1
TPG10
TPG15

TPG11

TPG11
TPG1

TPG14
TJ1 TJ2 TJ3 TJ3 TJ3 TJ3 TJ3 TJ4 TJ5
38'-2 1/4"

H
I
N
E
S
6 TJ1 TJ2 TJ3 TJ3 TJ3 TJ3 TJ3 TJ4 TJ5
Development Manager

M
U
N
O
Z
+
A
L
B
I
N
3 1/2" LWC TOPPING SLAB ON RIGID INSULATION. TOPPING SLAB ON RIGID INSULATION.
2 5 HIGH DENSITY FILE
FLOATING SLAB REFER TO 1/S5.04, TOP TOPPING = +11 1/4" REFER TO 1/S5.04, TO TOPPING = +1'-0"
LOCATION DESIGNED
ON 1" FORM S5.05 ABOVE STRUCTURAL SLAB ABOVE STRUCTURAL SLAB Design Architect
FOR 180 PSF
TJ1 TJ2 TJ3 DECK SITTING TJ3 3 TYP TJ3 TJ3 TJ3 TJ4 TJ5

K
E
N
D
A
L
L
/
H
E
A
T
O
N
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
ON 4" CONCRETE
12'-0" TOPPING SLAB ON RIGID KNEE WALLS. S5.31 BEAM STEPS TO 30"
2'-9 1/4"
INSULATION. REFER TO 1/S5.04 AT THIS LOCATION Architect of Record

1'-8"
TPG21 TPG22 TPG23 WB

3'-6"
TO TOPPING = +1'-0" ABOVE 5 10'-0"
STRUCTURAL SLAB

P
L
A
N
N
I
N
G
D
E
S
I
G
N
R
E
S
E
A
R
C
H
C
O
R
P
.
TB41 TB10 TB11 TPG24 TPG25
4'-3"

8'-10 3/4" 1'-1 7/8"


S8x18.4 Interior Design Architect

1'-8"

6'-0 1/2"
9 1/4" WB

W
A
L
T
E
R
P
M
O
O
R
E
6 11'-5 1/8" TJ12
4'-8"

TJ13 TJ14

12'-4"
10'-1 1/2"

TB5 TB5
TJ6 5 TJ7 TJ6 Structural Engineering
BEAM STEPS TO 30" TB6 8" THICK

I
.
A
.
N
A
M
A
N
+
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
AT THIS LOCATION 1 3/4" #3@10" T&B CANT. SLAB
3'-2 1/4" 9" WIDE x 12" HIGH 1'-4" 7'-6"
CURB AT STAIR EDGE S8x18.4 S6 TJ12 TJ13 TJ14 9" WIDE x 12" 2'-6" #5@10" T&B
S8x18.4 Mechanical, Electrical, Plumbing & Fire Protection
4 HIGH CURB AT 7'-10"
TJ6 1 3/4" TJ7 TJ6 9'-0 1/4"

C
L
A
R
K
C
O
N
D
O
N
STAIR EDGE

TPG9
4'-8 1/8" 5'-8 1/8"

TPG6A
4'-8"
TB14

15'-2"
11'-8"

S5
8'-10 3/4"
2 3'-10 1/4" 1 3/4"

17'-0 3/4"

TPG9

31'-2"
TB4
TB1

TB1

TB13
TB2
TB3

9'-0"
S5.31 TJ12 Landscape Architecture
TJ13 TJ14

W
A
R
D
,
G
E
T
Z
&
A
S
S
O
C
I
A
T
E
S
,
L
L
P
3'-11 3/8"
TPG13

TJ6 TJ7 TJ6 4'-0"


4'-4 5/8"
TPG4A

S8x18.4 S8x18.4
18'-9 3/4"

PRECAST CONCRETE 3 1/4" TB6 1'-0 3/4" Civil Engineering

I
M
E
G
C
O
R
P
.
STAIR (BY OTHERS) 10'-5 3/4" HSS8x4x3/8 (LSV)

TPG4
TJ12

13'-9 3/4"
WITH CUSTOM STEEL TJ13 TJ14

HSS4x4x1/4
HSS8x4x3/8 (LSV) 9 RFI 058 4'-6" 1'-9"

10'-6 5/8"
10'-1 1/2"
TJ6PLATE HANDRAIL. 4'-7 1/4" 8'-2"

6'-11 1/2"
TJ7 TJ6 Security, AV/IT

10'-6"
HSS4x4x1/4

REFER TO ARCH.
38x30

H
M
A
C
O
N
S
U
L
T
I
N
G
,
I
N
C
.
2'-8" 3'-4"

5'-6"
4'-9"
6'-5"

9 HSS4x4x1/4 TB41
TB7 TB8 TB10 TB11 TB12
Building Maintenance Control Systems
HSS 10x3x1/4 POSTS

O
L
Y
M
P
I
Q
U
E
WITH INTERMEDIATE C
1'-2"

1'-6"
HORIZ. HSS 8x4x1/4 FOR 5'-10 3/4" 6'-1 1/4"
STAIR LANDING 6" WIDE x 12" HIGH CURB Exterior Building Maintenance
24x21 HEADER BEAMS AT 4
SUPPORT. 3'-1 1/4" 2'-0 3/4" 2'-8 3/4" AT ELEVATOR SILL
LEVEL 11 FOR ANCHORING TJ8 TJ9 TJ3 4 TJ3 TJ3 TJ10 TJ11
OF CRANE TIE BACK WB
S5.31
PLATES. REINFORCE WITH
15'-8"

RAISED CONCRETE AROUND BUS DUCTS. TOPPING SLAB ON RIGID INSULATION.


4-#7 M BARS T&B AND TIES TOPPING SLAB ON RIGID INSULATION ON LEVEL 15 ONLY REFER TO 2/S5.04, TO CONC = +1'-4" ABOVE REFER TO 1/S5.04, TO TOPPING = +1'-0"
#3@10" 7'-0" REFER TO 1/S5.04, TOP TOPPING = +11 1/4" ABOVE STRUCTURAL SLAB STRUCTURAL SLAB 5 ABOVE STRUCTURAL SLAB
TPG3

TJ8 TJ9 TJ3 TJ3 TJ3 TJ10 TJ11

25'-1 1/2"
TPG3
1'-3"
4
5,6
5 TJ8 /15J3@L15 TJ9 TJ3 TJ3 TJ3 TJ10 TJ11

S5.45 4-#9 WITH CLASS B SPLICE 1

TPG8
TPG11

TPG11
TPG12

TPG6
TPG8
1 3
3,4 4 CENTERED IN THE SLAB S5.41
S5.41 S5.45 AND SHEAR WALL
TJ8 /15J3@L15 TJ9 TJ3 TJ3 TJ3 TJ10 TJ11

C.5
19'-0"

CRANE TIE BACK PLATES AT


LEVEL 11. REFER TO DETAIL
TJ8 TJ9 TJ3 TJ3 TJ3 TJ10 TJ11
13/S5.47 AND CRANE
1,2
1 4
SUPPLIER DRAWINGS.
S5.45
TPG2

TPG2

18'-9 1/2"
TJ8 TJ9 TJ3 TJ3 TJ3 TJ10 TJ11
24x21 HEADER BEAMS AT
LEVEL 11 FOR ANCHORING

56

56

56

56
OF CRANE TIE BACK
PLATES. REINFORCE WITH TPG26 TPG27 TB20 TB21 TB22 TB23 TB24 TPG28 TPG29
4-#7 M BARS T&B AND TIES
#3@10"
D
1 3/4"

1 3/4"
9 1 3/4"
1
WPM SKETCH RESPONSE FOR RFI
S5.41
1 3/4" 427

WPM STRUCTURES
8 7
07/20/20
10 RFI 427

TPG18 A.1 PLAN NOTES:


TPG17
5 4 3 2
1. REFER TO PLAN FOR TOP OF CONCRETE FLOOR ELEVATION.
2. SEE GENERAL NOTES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 30'-0" 30'-0" 30'-0"
3. FLOOR CONSTRUCTION IS A NORMAL - WEIGHT, CAST-IN-PLACE, PAN-FORMED BEAM SYSTEM CONSISTING 03/13/2020
OF16” DEEP x 66” WIDE PANS WITH A 5” THICK SLAB REINFORCED WITH WWR 4x4-W3.5xW3.5, FOR A TOTAL LEVEL ELEVATION
15J1 15J2 THICKNESS OF 21”, UNLESS NOTED OTHERWISE. SMALLER WIDTH PANS ARE DIMENSIONED ON PLAN.

1'-2" WB
4. SEE CONCRETE MATRIX FOR MINIMUM CONCRETE STRENGTH REQUIREMENTS. 8 199'-0"
5. REFER 11/S5.04 FOR ONE-WAY SLAB REINFORCEMENT SCHEDULE. 8B2 TB10 TB11
PROFILE AND ADDITIONAL REINFORCEMENT REQUIREMENTS. B
6. REFER TO SHEET S6.11 FOR CONCRETE COLUMN SCHEDULE. 9 213'-9"
15J1 15J2 7. REFER TO S5.0X SERIES SHEETS FOR TYPICAL CONCRETE FRAMING DETAILS. REFER TO S5.1X SERIES
SHEETS FOR TYPICAL POST-TENSIONING DETAILS. 10 228'-6"
8. REFER TO S5.31 FOR SHEAR WALL ELEVATIONS. TJ17 TJ18
TB5
9. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR PENETRATIONS NOT SHOWN. SEE HSS 4x4x3/8
TYPICAL DETAILS FOR ADDITIONAL REINFORCEMENT REQUIREMENTS AT OPENINGS. 11 243'-3" STUB POST
15J1 15J2 10. CONTRACTOR TO VERIFY ALL SLAB EDGE, STAIR AND ELEVATOR OPENING DIMENSIONS WITH (TYP)
ARCHITECTURAL DRAWINGS PRIOR TO SUBMITTING SHOP DRAWINGS. 12 258'-0" 10 TBD TBD
11. REFER TO ARCHITECTURAL DRAWINGS A3.XX FOR SLAB EDGE DIMENSIONS, EXTENTS AND DIMENSIONS OF S8x18.4 S8x18.4 TJ17 TJ18
9 13 MAR 20 ISSUED FOR CONSTRUCTION –
RAISED OR DEPRESSED SLAB AREAS, SLOPES, CURBS, AND DRAINS. REFER TO TYPICAL DETAILS FOR ADDENDUM NO. 6
REINFORCEMENT REQUIREMENTS. 13 272'-9"

32x21 PT

32x21 PT
15J1 15J2 8 13 DEC 19 ISSUED FOR CONSTRUCTION - C/S

31'-2"
12. ALL STEEL THAT IS PERMANENTLY EXPOSED TO EXTERIOR, IN UNCONDITIONED SPACE AND OUTSIDE OF

8B1

8B1

8B1

TB4
BALANCE OF TRADES
8B1

WATERPROOFING MEMBRANE SHALL BE HOT-DIPPED GALVANIZED UNLESS NOTED OTHERWISE. 14 287'-6"


13. ANY NEW STEEL WITHIN INTERIOR SPACE SUPPORTING GRAVITY LOADS MAY REQUIRE FIREPROOFING. S6 S6 TJ17 TJ18 7 27 NOV 19 ISSUED FOR CONSTRUCTION -
REFER TO ARCHITECTURAL DRAWINGS FOR BUILDING TYPE AND FIRE RATING REQUIREMENTS. SITEWORK, FOUNDATION,
6 RFI 18 SUPERSTRUCTURE R4
14. CONTRACTOR SHALL COORDINATE FINAL CURTAIN WALL EMBED LOCATIONS WITH CURTAIN WALL 15 302'-3" S8x18.4 S8x18.4
15J1 15J2 MANUFACTURER. 6 22 NOV 19 ISSUED FOR CONSTRUCTION -
12" THICK CONCRETE 15. CONCRETE STRUCTURAL ELEMENTS SHALL MEET THE PRESCRIPTIVE FIRE PROTECTION REQUIREMENTS HSS8x4x3/8 (LSV) ADDENDUM NO. 3
CURB. TJ17 TJ18
LISTED BELOW: 5 30 AUG 19 ISSUED FOR CONSTRUCTION -

HSS4x4x1/4
TO CURB = 303'-5 1/2" a. COLUMNS = IBC 2012, SECTION 722.2.4 ADDENDUM NO. 1
2" 1'-2" 2" b. FLOORS = IBC 2012, SECTION 722.2.2.1 4 26 JUL 19 ISSUED FOR CONSTRUCTION
1'-0"

c. WALLS = IBC 2012, SECTION 722.2.1.1


2"

B 3 21 JUN 19 ISSUED FOR CONSTRUCTION -


1'-7"

TB10 TB11 SITEWORK, FOUNDATION,


HSS 10x10x3/8 WITH SUPERSTRUCTURE
4"

3/4" THICK BASE 8B2


PLATE AND (4)-3/4"Ø 8'-2" C
ANCHOR RODS NO. DATE ISSUE
(EMBED = 18") CAD FILENAME
10 RFI 427 HSS 6x4x3/8 (LSV) FOR SUPPORT
OF LOW RISE ELEVATOR MACHINE
BEAMS. CORDINATE ELEVATION
DRAWING TITLE
WITH ELEVATOR MANUFACTURER
TOWER LEVEL 15 PARTIAL 2
3 1/8" = 1'-0" TOWER LEVEL 8 PARTIAL FRAMING PLAN TOWER LEVEL 8-15
2 1/8" = 1'-0"
FRAMING PLAN
7/20/2020 1:41:27 PM

TOWER LEVEL 8-14 FRAMING PLAN


1 1/8" = 1'-0" KHA DRAWING NUMBER

1
8
0
2
1
PROJECT NO.

S3.19
8 7.6 7 7.3 6 5 4 3 2 1.4 1 0.8

14'-3" 20'-0" 12'-4 1/2" 17'-7 1/2" 30'-0" 30'-0" 30'-0" 30'-0" 20'-0" 10'-0" 4'-11"

9'-0 1/4" 16x21 CONCRETE


16x21 CONCRETE HEADER BEAM
HEADER BEAM
20x30 CONCRETE
CANTILEVER COLUMN
FOR PARAPET WALL
A.1
2
AND CATWALK SUPPORT

3.89°
4
(TYP)

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4

8 4
0
5
6
6
5
0

650

650

650

650

650

650

650

650

650

650

650

650

650

650

650

650
8 4
6
5
0
RB4 RB5 RPG18 RPG19
M 4
-0
7O
8 4
2
5
0 8 4
2
5
0 8 4
2
5
0 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 2 4
0
5
8 78

8 4
6
5
0

4
0
5
8 78
8 4
0
5
6

8 16
4
5
0

8 4
6
5
0
8 16
4
5
0

W
C
U 30
8 4

8 4

8 4

8 4

8 4

8 4
2
3
0

2
3
0

2
3
0

2
3
0

2
3
0

2
3
0
M 4
-0
9
O

A
4
8
M O -0 6
2
3
8 0 5
2
3
8 0 6
2
3
8 0 5
2
3
8 0 6
2
3
8 0 5
2
3
8 0 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
3
2
8 6 0
3
2
8 5 0
8 13

8 4
6
5
0

0
3
8 2
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
8 RFI 427

6
5
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
6
5
0

5'-2 1/2" 4'-4 1/2"


8 16
4
5
0

5'-1 1/2" 4'-6 1/2"

5'-1 1/2" 4'-6 1/2"

5'-1 1/2" 4'-6 1/2"


M 3
-0
O M 2
3
-0
O

8 4
6
5
0

8 4
2
3
0
8 16
4
5
0

M 2
3
-0
O
M 3
-0
O

8 4
8 4

2
3
0
6
5
0
RB3
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
W
C
U 3
0

6
5
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
6
5
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
6
5
0
14'-4 3/8"
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
6
5
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
11'-9 3/8"

6
5
0

8 4
2
3
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4

8 4
6
5
0

2
3
0
RB2
8 16
4
5
0

M 2
3
-0
O
M 3
-0
O

8 4
6
5
0

3'-3"
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
6
5
0
RJ1 RJ2 RJ4 RJ5
8 16
4
5
0 8 4
0
5
6

0
3
2
8 6

4
0
5
8 2
0
3
2
8 5
M 3
-0
O M 2
3
-0
O

8 4
6
5
0
8 16
4
5
0

M 2
3
-0
O
M 3
-0
O

8 4
6
5
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
6
5
0

8 4
2
3
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

14'-2 3/4"

14'-3 1/2"

8 4

8 4
6
5
0

2
3
0
RB1
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
6
5
0

3'-3"
8 16
4
5
0

M 2
3
-0
O
M 3
-0
O

8 4
6
5
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
30" DEEP TAPERED

6
5
0
8 16
4
5
0

4
M 3
-0
O M 2
3
-0
O

8 4
6
5
0
8 16
4
5
0

M 2
3
-0
O
M 3
-0
O

5'-0 3/4"
8 4
6
5
0

8 4
2
3
0
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
8 4

2
3
0
6
5
0
8 16
4
5
0

ENDED CONCRETE RPG17


M 3
-0
O M 2
3
-0
O

8 4
650

3'-3"
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
650
8 16
4
5
0

M 2
3
-0
O
M 3
-0
O

8 4
650
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

8 4
650
BEAM RB7
8 16
4
5
0

1'-6"
M 3
-0
O M 2
3
-0
O

5'-0 3/4"
8 4
650
8 4
0
5
6

4
0
5
8 2
0
3
2
8 6
8 16
4
5
0

0
3
2
8 5
RPG16
M 2
3
-0
O
M 3
-0
O

8 4
650
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

3'-3"
8 16
4
5
0

M 3
-0
O M 2
3
-0
O

M 3
-0
O M 2
3
-0
O

RJ1 RJ2 RJ3 RJ3 RJ3 RJ4

8 4
8 4
9
2
0

0
2
9
M 2
3
-0
O

6
9
2
8 0
M 3
-0
O

6
9
2
8 0
4

9 9
210

9 96
2
18

18
9 62
6
6
9
2
8 0

8
10
9 6

10
8
6
9
2
8 0

9 96
2
18

9
91826
8
10
9 6

5'-0 3/4"
6108

3'-3"
M 23-0O

M 3-0O
9 6108
8 0296

9 6108
9 91826

9 91826

8 450
8 0296

8 450
4 210

10'-8 1/2"

5'-0 3/4"
8
4
50
8
4
50
8 0296

9 91826
23-0O
8 4029 M

9 6108

3-0O
M 8 4029

8 0296

9 91826
9 6108

RJ18 RJ19 HSS8x8 POST FOR 8 4


0
5
6

0
3
2
8 6

4
0
5
8 2
0
3
2
8 5
CATWALK SUPPORT

5'-0 3/4"
8
4
06
8 4
6
0 M O -0
3
2 M O -0
3

8 4
0
5

8 4
0
5
6
3

8 34

M O 23-0 M O 3-0
650

8 54
0
HSS 10x10x3/8 POST 4 1'-11" RJ18 RJ20 RJ2 RJ3 RJ3 RJ3 RJ3 RJ4 RJ5
SITTING ON CONCRETE

RPG1
10'-7 3/8"
BEAM 8 4
0
5
6

4
0
5
8 2
0
3
2
8 6
0
3
2
8 5
M O 23-0 M O 3-0
8 54
0
8 54
0
5

SLOPE DOWN
8 1'-0 3/4"
RJ18 RJ20 RJ2 RJ3 RJ3 RJ3 RJ3 RJ4 RJ5

46'-11"

H
o
u
s
t
o
n
,
T
e
x
a
s
S5.47

M O 23-0
8 54
0

M O 3-0
8 54
0
8 4
0
5
6

0
3
2
8 6

4
0
5
8 2
0
3
2
8 5
RPG32

RPG10
RPG11

RPG5
RPG7
RPG11
RPG14
RPG15

RB6
M O 23-0 M O 3-0
8 504
8 504

RJ18 RJ20 RJ2 RJ3 RJ3 RJ3 RJ3 RJ4 RJ5 8 4


0
5
6

8 4
2
5
0
6
2
3
8 0
5
2
3
8 0
8" WIDE CONCRETE
8" WIDE CONCRETE

H
I
N
E
S
CURB (TYP)
CURB (TYP)
M O 23-0
8 504

M O 3-0
8 504

TO CURB = 319'-5"
5 TO CURB = 319'-5"
RJ23 RJ24 RJ25 RJ26 RJ22 RJ22 RJ26 RJ27 RJ28
8 4
0
5
6

6
2
3
8 0

8 4
2
5
0
5
2
3
8 0
Development Manager

M
U
N
O
Z
+
A
L
B
I
N
M O 23-0 M O 3-0
8 504
8 504

5
RB7 8 4
0
5
6

8 4
2
5
0
6
2
3
8 0
5
2
3
8 0
EMBED P5 Design Architect
RJ23 RJ24 RJ25 RJ26 3 RJ22 RJ22 RJ26 RJ29

K
E
N
D
A
L
L
/
H
E
A
T
O
N
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
1'-5" WB S5.31 8 BEAM STEPS TO 30"
RPG21 RPG22 AT THIS LOCATION 8 4
0
5
6

Architect of Record

6
2
3
8 0

8 4
2
5
0
5
2
3
8 0
M O 23-0 M O 3-0
8 504

3'-6"
8 504

8 364
50

1'-8"
8 504

M 23-0O
M 3-0O

RPG24

9"

P
L
A
N
N
I
N
G
D
E
S
I
G
N
R
E
S
E
A
R
C
H
C
O
R
P
.
8 54
0
8 54
0

LB20x30 RB8 RB9 RB10 RPG23


2'-10 3/4"

B
4
0298
8 4
029

8 0296

M 23-0O
M 3-0O
91826
9 91826 8 0296

61089

4'-0" 3'-6 1/2"


9 6108
1'-7"

8 54
0
8 54
0

2'-6"
5
4
0298
8 4
029

8 0296

M 23-0O
M 3-0O
91826
8 0296
9 91826

61089

8 54
0
9 6108

8 54
0

S8x18.4
8 4
0
5
6

8 4
2
5
0
6
2
3
8 0
5
2
3
8 0
Interior Design Architect
M 23-0O
M 3-0O

M16x80
/
HBC-C M16x80
/
HBC-C M16x80
/
HBC-C

317'-8 1/2"
9 6108

9 6108

9 6108

9 6
8
0
1
0
8
9 6

0
8
9 6

0
8
9 6

0
8
9 6
1

1
9 91826

9 91826

9 91826

9 9
8
2
6
9 9

8
2
6
9 9

8
2
6
9 9

8
2
6
9 9
1

6
2
8
1

M O 2
3
-0 M O 3
-0 M O 2
3
-0 M O 3
-0 M O -0
3
2 M O -0
3 M O -0
3
2 M O -0
3 M O -0
3
2 M O -0
3 M O -0
3
2 M O -0
3 M O -0
3
2 M O -0
3
8 0296

8 0296

8 0296

8 0296

8 0296

8 0296

8 6

8 6

M O 02-

6'-0 1/2"
M O 9
-0
1
2
9
0

2
9
0
8 4

8 4
0
4 2

4
2
0
8 9

4
2
0
8 9

0
4 2
1

1
029

029

48
46

W
A
L
T
E
R
P
M
O
O
R
E
1'-1 7/8"
4 4
5-02

2'-3" WB
5
4 24
-0

8 16
4
5
0 8 16
4
5
0 8 4
0
5
6
1 8 4
0
5
6
1 8 4
0
5
6
1 8 4
0
5
6
1 8 4
0
5
6
1

TOP OF SLAB

10'-0 1/2"
U
W
C 0
3

8'-2" 3'-2 1/4"


8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

RJ23 RJ24 RJ16

66

66
W
C 0
U 3

2 1/2"

8'-10 3/4"
TB5
9'-5 1/2"

20x32

2
3
8 0
8 5
2
3
0 8 6
2
3
0 8 5
2
3
0 8 6
2
3
0 8 5
2
3
0 8 6
2
3
0 8 5
2
3
0 8 6
2
3
0 8 5
2
3
0 8 6
2
3
0 8 713
0 8 5
2
3
0 8 6
2
3
0 8 5
2
3
0 8 6
2
3
0 8 13
0

3
8 0
7
RJ15

W
C
U 30
W
U 3
C 0
14 RJ11 RJ12 NWC TOPPING SLAB RJ10 Structural Engineering

8 4
3
8
5
0
8 4
6
5
0

8 4
8
5
0
7
8 3
8
5
0
4

CONCRETE 8" THICK


M O 2
0
- 8 2
5
0
4 8 2
5
0
4 8 2
5
0
4 8 2
5
0
4 8 2
5
0
4 8 2
5
0
4 8 78
5
0
4

17'-2 1/4" 2'-5 3/4"


M O 23-0
8 504 8 504

W
C
U 3
0
M O 3-0

9
M O -0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

8 4
6
5
0

I
.
A
.
N
A
M
A
N
+
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
PLINTHS INSIDE MECH ROOM CANT. SLAB
S5.47 NWC TOPPING SLAB
4 TO TOPPING = 318'-0"

11'-6 3/8"
8 1 3/4" INSIDE MECH ROOM RB11
5 S8x18.4 S8x18.4 RJ23 RJ24 RJ15 RJ16 #3@10" T&B
RFI 427 TO TOPPING = 318'-0" Mechanical, Electrical, Plumbing & Fire Protection

-0
1 M O 61
RPG4A

6
2
3
8 0

-0
M O 6
7'-10"

5
2
3
8 0
S8
W
U 3
C 0

RJ11 RJ12 2 RJ10 #5@10" T&B

C
L
A
R
K
C
O
N
D
O
N
3'-7" 5'-2"

RPG31

RB55
U
W
C 0
3

4 3'-10 1/4"

15'-2"
11'-8"
S5.31
RPG13

8'-10 3/4"

RB13

RPG9

31'-2"
RB57

RB57

RB57

RB18
RB55

6'-8"
S8

S8

S8

S8

RPG4
11'-6"
Landscape Architecture
W
C 0
U 3
M O -0

4 2
5
-0
7

M O 7-0
1
M O -0
1

RJ23 RJ16 RJ10


3
2 M O -0

4
0
5
8
8 3
M O -0

4 2

M O 6
2
0
-

6
2
M O -0
5
-0
7

M O 7-0
1

1'-6"
1

8 4
3
8
5
0
5'-8 3/4" 4'-6"

W
A
R
D
,
G
E
T
Z
&
A
S
S
O
C
I
A
T
E
S
,
L
L
P
U
W
C 0
3
W
U 3
C 0
3
8 0
7
0
8 713 0
3
8 2

3
8 0
1
4 5'-10 3/4" 3'-1 1/4" 8'-2" 11'-1 1/2" 8'-2" RJ10
RJ11 RJ12 RJ10 W
C
U 3
0

4'-4 5/8"
2'-6"

RB11 S8x18.4 S8x18.4


Civil Engineering

48
1'-5 1/2"

I
M
E
G
C
O
R
P
.
M O -0

-0
1 M O 61
8 4

3
2

6
2
3
8 0
0
5 8 4

M O -0

-0
M O 6
0
5

5
2
3
8 0
3

HSS8x4x3/8 (LSV)

13'-9 3/4"
RB12 RJ23 RJ24 RJ15 RJ16

HSS4x4x1/4
10'-1 1/2"

6'-11 1/2"
RJ13 RJ10

12'-2"
Security, AV/IT
HSS4x4x1/4
1'-0"

H
M
A
C
O
N
S
U
L
T
I
N
G
,
I
N
C
.
RB13
4'-8"

M O -0
1
M O -0

M O 0
1-

-0
5
4 27
8 4

6
2
3
8 0
0
5

3
2 M O -0
8 4

5
2
3
8 0

M O -0
1
0
5

M O 0
1-

-0
5
4 27
7'-5"
36

HSS4x4x1/4
RB60 RB61 RB8 RB9 RB10 RB56
Building Maintenance Control Systems
8 4
0
3
2

O
L
Y
M
P
I
Q
U
E
2'-6 1/2"
C
M O -0

4 2
5
-0
7

M O -0
1

M O 7-0
1

-0
1 M O 61
3
2

6
2
3
8 0
M O -0

M O -0

-0
M O 6
4 2

5
2
3
8 0
1

5
-0
7

M O 7-0
1
1'-8"

317'-8 1/2"

RB17
TOP OF SLAB 8 4
0
3
2

Exterior Building Maintenance


RB58 RB59
RJ30 RJ26 RJ31 4 RJ26 RJ32
M O -0

0
M O -6
1
8 4

6
2
3
8 0
0
5

3
2 M O -0
8 4

5
2
3
8 0

0
M O -6
1
0
5

S5.31

1'-5" WB
20x32 CONCRETE
M O -0

M O -0
1
M O 0
1-

-0
5
4 27
8 4

3
2

6
2
3
8 0
0
5 8 4

M O -0
0
5

5
2
3
8 0

M O -0
1
3

M O 0
1-

-0
5
4 27
RJ30 RJ26 RJ31 RJ22 RJ7 RJ26 RJ32

25'-1 1/2"
PLINTHS FOR COOLING
RPG3

TOWER FRAMING
SUPPORT (TYP, UNO)

RPG3
3,4
3
M O -0

4 2
5
-0
7

M O 7-0
1
M O -0

0
M O -6
1
1

6
2
3
8 0
3
2 M O -0
M O -0

4 2

5
2
3
8 0

0
M O -6
1
5
-0
7

M O 7-0
1
1

RJ1 S5.45 RJ2 RJ3 RJ3 RJ3 RJ8 RJ9

SLOPE DOWN
4-#9 WITH CLASS B SPLICE
RPG12

RPG30
RPG29

RPG29

RPG8
CENTERED IN THE SLAB

RPG6
M O -0

0
1 M O -6
1
8 4

3
2

6
2
3
8 0
0
5 8 4

M O -0

0
M O -6
0
5

5
2
3
8 0
3

AND SHEAR WALL


8 0
3
2
4

RJ1 RJ2 RJ3 RJ3 RJ3 RJ8 RJ9 8 4


0
3
2

C.5

M O -0
1
M O -0

M O 0
1-

-0
5
4 27
8 4

6
2
3
8 0
0
5

3
2 M O -0
8 4

5
2
3
8 0

M O -0
1
0
5

M O 0
1-

-0
5
4 27
8 0
3
2
4

8 4
0
3
2

1,2
1
5,6
5 RJ1 RJ2 RJ3 RJ3 RJ3 RJ8 RJ9 S5.45
S5.45
M O -0

4 2
5
-0
7

M O -0
1

M O 7-0
1

0
1 M O -6
1
3
2

6
2
3
8 0
M O -0

M O -0

0
M O -6
4 2

5
2
3
8 0
1

5
-0
7

M O 7-0
1

18'-9 1/2"
RPG2

RPG2
RJ1 RJ2 RJ3 RJ3 RJ3 RJ8 RJ9
M O -0

0
M O -6
1
8 4

6
2
3
8 0
0
5

3
2 M O -0
8 4

5
2
3
8 0

0
M O -6
1
0
5

RPG25 RPG26 RB14 RB14 RB15 RB15 RB16 RPG27 RPG28


M O -0

M O -0
1
M O 0
1-

-0
5
4 27
8 4

3
2

6
2
3
8 0
0
5 8 4

M O -0
0
5

5
2
3
8 0

M O -0
1
3

M O 0
1-

-0
5
4 27
W
U 3
C 0 W
C 0
U 3

D
M O -0
2
1

2
3
8 0
M O -0
2 8 13
0
1 3/4"

U
W
C 0
3
C 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

4
2
3
8 0

3
W
U
8 4

M O -0
3
0
5
1

8 4
5
0
3
1

2
6
M O 6
2
0
-

8" WIDE CONCRETE 318'-5" 24x24 CONCRETE


CURB (TYP AROUND PERIMETER) TOP OF SLAB PLINTH FOR DAVIT
1 3/4" WPM SKETCH RESPONSE FOR RFI
TO CURB = 319'-6" CONNECTION (12 THUS) 427
PROVIDE DETAIL
SIMILAR TO 10/S5.41
5
WPM STRUCTURES
PLAN NOTES:
07/20/20

1. REFER TO PLAN FOR TOP OF CONCRETE FLOOR ELEVATION.


2. SEE GENERAL NOTES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. FLOOR CONSTRUCTION IS A NORMAL - WEIGHT, CAST-IN-PLACE, PAN-FORMED BEAM SYSTEM CONSISTING
OF16” DEEP x 66” WIDE PANS WITH A 5” THICK SLAB REINFORCED WITH WWR 4x4-W3.5xW3.5, FOR A TOTAL
THICKNESS OF 21”, UNLESS NOTED OTHERWISE. SMALLER WIDTH PANS ARE DIMENSIONED ON PLAN.
4. SEE CONCRETE MATRIX FOR MINIMUM CONCRETE STRENGTH REQUIREMENTS.
5. REFER 11/S5.04 FOR ONE-WAY SLAB REINFORCEMENT SCHEDULE. 03/13/2020
PROFILE AND ADDITIONAL REINFORCEMENT REQUIREMENTS.
6. REFER TO SHEET S6.11 FOR CONCRETE COLUMN SCHEDULE.
7. REFER TO S5.0X SERIES SHEETS FOR TYPICAL CONCRETE FRAMING DETAILS. REFER TO S5.1X SERIES
SHEETS FOR TYPICAL POST-TENSIONING DETAILS.
8. REFER TO S5.31 FOR SHEAR WALL ELEVATIONS.
9. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR PENETRATIONS NOT SHOWN. SEE
TYPICAL DETAILS FOR ADDITIONAL REINFORCEMENT REQUIREMENTS AT OPENINGS.
10. CONTRACTOR TO VERIFY ALL SLAB EDGE, STAIR AND ELEVATOR OPENING DIMENSIONS WITH
ARCHITECTURAL DRAWINGS PRIOR TO SUBMITTING SHOP DRAWINGS.
11. REFER TO ARCHITECTURAL DRAWINGS A3.XX FOR SLAB EDGE DIMENSIONS, EXTENTS AND DIMENSIONS OF
RAISED OR DEPRESSED SLAB AREAS, SLOPES, CURBS, AND DRAINS. REFER TO TYPICAL DETAILS FOR 8 TBD TBD
REINFORCEMENT REQUIREMENTS. 7 13 DEC 19 ISSUED FOR CONSTRUCTION - C/S
12. ALL STEEL THAT IS PERMANENTLY EXPOSED TO EXTERIOR, IN UNCONDITIONED SPACE AND OUTSIDE OF BALANCE OF TRADES
WATERPROOFING MEMBRANE SHALL BE HOT-DIPPED GALVANIZED UNLESS NOTED OTHERWISE. 6 27 NOV 19 ISSUED FOR CONSTRUCTION -
13. ANY NEW STEEL WITHIN INTERIOR SPACE SUPPORTING GRAVITY LOADS MAY REQUIRE FIREPROOFING. SITEWORK, FOUNDATION,
REFER TO ARCHITECTURAL DRAWINGS FOR BUILDING TYPE AND FIRE RATING REQUIREMENTS. SUPERSTRUCTURE R4
14. CONTRACTOR SHALL COORDINATE FINAL CURTAIN WALL EMBED LOCATIONS WITH CURTAIN WALL
MANUFACTURER. 5 30 AUG 19 ISSUED FOR CONSTRUCTION -
15. CONCRETE STRUCTURAL ELEMENTS SHALL MEET THE PRESCRIPTIVE FIRE PROTECTION REQUIREMENTS ADDENDUM NO. 1
LISTED BELOW: 4 26 JUL 19 ISSUED FOR CONSTRUCTION
a. COLUMNS = IBC 2012, SECTION 722.2.4 3 21 JUN 19 ISSUED FOR CONSTRUCTION -
b. FLOORS = IBC 2012, SECTION 722.2.2.1 SITEWORK, FOUNDATION,
c. WALLS = IBC 2012, SECTION 722.2.1.1 SUPERSTRUCTURE
2 14 JUN 19 ISSUED FOR DESIGN
DEVELOPMENT - BID GENERAL
E.7 CONTRACTOR: CIVIL, STRUCTURE,
FOUNDATIONS, SITE CONCRETE,
PRECAST, CURTAIN WALL,
2 ELEVATORS - ADDENDUM NO 2

NO. DATE ISSUE


GA F
CAD FILENAME

DRAWING TITLE

TOWER ROOF
ROOF LEVEL FRAMING PLAN FRAMING PLAN
1
7/20/2020 1:41:31 PM

1/8" = 1'-0"

KHA DRAWING NUMBER

1
8
0
2
1
PROJECT NO.

S3.26
8 7.6 7 7.3 6 5 4 3 2 1.4 1 0.8

DAVIT SOCKET ON A.1


20x30 CONCRETE 3
PL 1x12x1'-0" (TYP) RFI 104
9 RFI 427 CONT. HSS 16x12x1/2 LSH CANTILEVER. HSS 12x12x1/2 CANTILEVER COLUMN TYP 8
S5.43

You might also like