You are on page 1of 2

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Four-laning of Ambala - Kaithal Section of NH-65 from Km 0.000 (Ambala) to Km 50.860 (Pehowa) with paved
shoulder (length 50.860 km) in the State of Haryana under NHDP Phase-III on EPC Basis.

CLIENT NATIONAL HIGHWAYS AUTHORITY OF INDIA


AUTHORITY'S ENGINEER MSV INTERNATIONAL INC.

EPC CONTRACTOR M/s DILIP BUILDCON LIMITED


M/s VARAHA INFRA LIMITED (JV)

BITUMEN EXTRACTION TEST


(AASTHO T 164, ASTM D 2174)

Location Date of Sampling

Source of Material Date of Testing

Type of Mix Sampled by

Tested by

OBSERVATIONS OF BITUMEN CONTENT

Sample No.

Weight of sample before extraction W1 gm

Weight of sample after extraction W2 gm

Weight of filter paper before extraction W3 gm

Weight of filter paper after extraction W4 gm

Weight of minaral aggregate W5 = W4-W3 gm

Weight of total mineral aggregate W6 = W2+W5 gm

Weight of bitumen extracted W7=W1-W6 gm

% of Bitumen content in mix (W7 / W1) x 100

Avg. Bitumen Contant %

Bitumen Content in JMF Tolerance ± 0.3 %


Remarks :-
EPC Contractor's Representative Authority's Engineer Representative

You might also like