B25D & B30D Mk III 6X6 ADT CHAPTER 6 872150

CHAPTER 6. HYDRAULIC SYSTEM

SECTION 3. TESTS

JT05800 DIGITAL Transducers are temperature sensitive. Allow


THERMOMETER INSTALLATION transducer to warm to system temperature.

After transducer is warmed and no pressure


applied, push sensor zero button for one second
to set the true zero point.

When using for different pressures, turn selector


to OFF for two seconds and then to the pressure
range. Readings are inaccurate if proper range
for transducer is not used.

Transducers:
3400 kPa (35 bar) (500 psi)
1. Temperature Probe 34 000 kPa (350 bar) (5000 psi)
2. Cable 70 000 kPa (700 bar) (10,000 psi) Install cranking
device DC280088.
3. JT05800 Digital Thermometer

Fasten temperature probe (1) to a bare metal HYDRAULIC OIL CLEANUP


hydraulic line using a tie band.
PROCEDURE USING PORTABLE
Wrap temperature probe and line with a shop FILTER CADDY
towel.
Specifications
JT02156A DIGITAL ANALOGUE Hydraulic Reservoir Capacity
PRESSURE/TEMPERATURE . . . . . . . . . . . . . . 78.8 L (20.8 USGAL)
ANALYSER INSTALLATION Hydraulic Reservoir Filtering Time
. . . . . . . . . . . . . . . . . . . . 7 minutes
approximate.
Engine Speed . . . . . . . . . . 2750 ± 30r.p.m.
Hydraulic System Capacity . 155 L (41 USGAL)
Hydraulic System Filtering Time
. . . . . . . . . . . . . . 25 minutes approximate.

Service Equipment And Tools

• Portable Filter Caddy


• Two 3658 mm (12 ft) x 3/4 in. ID 100R1 Hoses with
3/4 M NPT Ends
• Quick Disconnect Fittings
• Suction Wand
1. JT02156A Digital Pressure/Temperature • Discharge Wand
Analyser.
2. Transducers. This procedure must be used to clean complete
hydraulic system after any major component
Use the digital pressure/temperature analyser (1) failure.
and transducers (2) in place of analog gauges
and a separate temperature reader.

REVISION 0 433
872150 CHAPTER 6 B25D & B30D Mk III 6X6 ADT

Install new return filter elements. Stop engine. Remove filter caddy.

NOTE: 1. For a failure that creates a lot of Install new return filter elements.
debris, remove access cover from hydraulic
reservoir. Drain the hydraulic reservoir. Check oil level in hydraulic reservoir; add
Connect filter caddy suction line to drain port. hydraulic oil if necessary. (See CHAPTER 1 of
Add a minimum of 19 L (5 gal) of oil to the the OM for oil specifications and quantities).
hydraulic reservoir. Operate filter caddy and
wash out the hydraulic reservoir.
2. The minimum ID for a connector is 1/2 in. to
HYDRAULIC SYSTEM WARM-UP
prevent cavitation of filter caddy pump. PROCEDURE
Put filter caddy suction and discharge wands into Service Equipment And Tools
the hydraulic reservoir filler hole so ends are as
far apart as possible to obtain a thorough
cleaning of oil. • JT05800 Digital Thermometer
NOTE: If machine temperature is below –
Start the filter caddy. Check to be sure oil is 18°C (0°F), start procedure with engine
flowing through the filters. Operate filter caddy running at 1/2 speed. Failure to do this could
until all oil in the hydraulic reservoir has been cause pump cavitation. Once oil temperature
circulated through the filter a minimum of four is above -18°C (0°F) the engine speed can be
times. increased to fast idle.

NOTE: Filtering time for hydraulic reservoir is Below -18°C (0°F) an extended warm-up period
0.089 minute x number of litres (0.33 minutes may be necessary. Hydraulic function will move
x number of gallons). slowly and lubrication of parts may not be
adequate with cold oil.
Leave filter caddy operating for the next step.
Do not attempt normal machine operation until
Start the engine and run it at specification. hydraulic functions move at or close to normal
cycle times.
Specification
Operate functions slowly and avoid sudden
Engine - Speed . . . . . . . . . 2240 ± 20 r.p.m. movements until engine and hydraulic oils are
thoroughly warmed.
NOTE: For the most effective results,
cleaning procedure must start with the Operate a function by moving it a short distance
smallest capacity circuit then proceed to the in each direction. Continue operating the function
next larger capacity circuit. increasing the distance travelled in each cycle
until full stroke is reached.
Starting with the smallest capacity circuit, operate
each function through a complete cycle. For faster warm-up, restrict air flow through oil
cooler using cardboard or other similar material.
Repeat procedure until the total system capacity Use correct viscosity hydraulic oil to minimize
has circulated through filter caddy seven times. warm-up period. (See CHAPTER 1 in the OM
for oil specifications.)
Each function must go through a minimum of
three complete cycles for a thorough cleaning of Connect digital thermometer. Install temperature
oil. probe on hydraulic reservoir-to-pump inlet line.
See “JT05800 Digital Thermometer
NOTE: Filtering time for complete hydraulic Installation” on page 511.
system is 0.158 minute x number of litres (0.6
minute x number of gallons). Filtering time for ‹ CAUTION
machines with auxiliary hydraulic functions
must be increased because system capacity Avoid possible serious injury from machine
is larger. movement during warm-up procedure. Clear
the area of all bystanders before doing the
warm-up procedure.

434 REVISION 0
B25D & B30D Mk III 6X6 ADT CHAPTER 6 872150

Clear the area of all bystanders to allow for Test is used as an indication of hydraulic circuit
machine movement. performance. A slow cycle time is an indication of
a restriction or leakage in that circuit.
Start engine. Do not accelerate engine rapidly
during warm-up. Run engine at 1/2 speed for Cycle times are also a general indication of
approximately 5 minutes before operating any hydraulic pump performance. Always record the
functions. average of at least three complete cycle times.

Engage park brake. Do Hydraulic System Warm-Up Procedure to


heat hydraulic oil to specified temperature. (See
‹ CAUTION procedure in this Chapter.) Use monitor display
menu to monitor hydraulic oil temperature. See
Holding a function over relief for more than 10 Monitor Display Unit-Menu Function (in Section
seconds can cause damage to control valve. 2-1 of operators manual).

Operate steering and bin raise and lower ‹ CAUTION


functions over relief to heat hydraulic system.
Avoid possible serious injury from machine
Once oil temperature is above –18°C (0°F), movement. Clear area of all bystanders before
increase engine speed to fast idle. performing test. Area must have enough
overhead clearance to raise bin to full height
Stop periodically and operate all hydraulic of 7226 mm (23 ft. 8.5 in.). Do not perform this
functions to distribute the heated oil. test within 4 m (13 ft.) of high voltage power
lines.
CYCLE TIME TEST Park machine on level ground in the straight
ahead position.
Specifications
Hydraulic Oil Temperature 50 ± 5°C (120± 10°F).
Bin
Engine Speed . . . . . . . . . 2620 ± 50 r.p.m. Select “N” (Neutral) on gear shift control and
Bin Raise engage park brake.
(New Pump) Cycle Time . . . . . . . . 11.9 sec.
Operate machine at specification.
Bin Lower
(New Pump) Cycle Time . . . . . . . . . 6 sec.
Actuate bin control valve to full stroke for each
Bin Raise function. Record cycle times.
(Used Pump) Cycle Time . . . . . . . . 14.9 sec.
Bin Lower Steering
(Used Pump) Cycle Time . . . . . . . . . 8 sec.
Engine Speed . . . . (Slow Idle) 600 ± 20 r.p.m. Select “N” (Neutral) on gear shift control and
Steering Wheel disengage park brake.
Stop-to-Stop Cycle Time . . . . . . . . 7 - 8 sec.
Operate machine at specification.
Steering Wheel
Stop-to-Stop . . . . . . . . . . . . . . 4.7 Turns
Starting with machine turned against the left or
right stop, turn steering wheel to opposite stop.
Service Equipment And Tools
Record the time and number of steering wheel
• Stop Watch turns stop-to-stop. Repeat several times, in both
directions, to verify count.

REVISION 0 435
872150 CHAPTER 6 B25D & B30D Mk III 6X6 ADT

MAIN HYDRAULIC PUMP Install articulation locking bar.

RESIDUAL AND Activating Service Mode


COMPENSATOR VALVES TEST
AND ADJUSTMENT • Turn the ignition off and then on
• Press and hold the menu button for 60
Specifications Residual Valve seconds. On completion of the 60 second,
“Service Mode” will be displayed on the
Hydraulic Oil screen. Release the menu button.
Temperature . . . . . . . 50 ± 5°C (120± 10°F) • Service Mode is switched off when the ignition
Engine Speed . . . . . . . . . . 600 ± 20 r.p.m. is switched off. The process therefore needs to
be repeated if Service Mode needs to be
First Residual Valve re-entered after the ignition has been switched
Pressure . . . . . . 2500 ± 100 kPa (25 ± 1 bar)
. . . . . . . . . . . . . . . . . . (363 ± 14.5 psi) off. The MDU will remain in service mode if the
truck is driven (i.e. starts moving). All over
Compensator Valve ridden functions will however be re-set to the
normal mode.
Hydraulic Oil
Temperature . . . . . . . 50 ± 5°C (120± 10°F) Procedure to Activate the Hydraulic
Engine Speed . . . . . . . . . 1000 ± 20 r.p.m. Pressure Setup Mode
First Compensator Valve
Pressure . . . . . . . . . . . . 24 000 ± 500 kPa • Activate Service Mode.
. . . . . . . . . (240 ± 50 bar) (3625 - 3770 psi)
• Press the MENU button.
• Scroll down through the MENU options using
Essential Tools the "NEXT" button until “Machine Config” is
highlighted. Press the "SELECT" button.
• JT03482 High Pressure Test Hose Kit • Scroll down until “Hyd Press Setup” is
highlighted. Press the "SELECT" button.
Service Equipment And Tools • If you can’t find the “Hyd Pres Setup” menu
line, you are not in “Service Mode”
• JT02156A Digital Pressure/Temperature • The different options can be selected by
Analyser scrolling to it with the "NEXT" button.
• To select an option hold down the SELECT
The purpose of test is to check the residual valve button for 3 seconds or until you’ve heard 3
and compensator valve pressure settings and beeps.
adjust as necessary.

Residual (low stand-by) pressure is maintained Procedure to Calibrate the Bin


by the pump when no functions are actuated. The Position Sensors
compensator valve de-strokes the pump at full
system pressure, thereby limiting system • Start the truck.
pressure.
• Activate Service Mode.
• Press the "MENU" button.
‹ CAUTION
• Scroll down through the "MENU" options
1. To perform this test, machine MUST be using the "NEXT" button until “Machine
parked in an area that will allow bin to be Config” is highlighted. Press the "SELECT"
raised to full height. button.
2. Before the hydraulic pressure can be • Scroll down until “Position Sensors” is
checked and adjusted, the MDU needs to be highlighted. Press the "SELECT" button.
set to “Service Mode” and “Hyd Press Setup”
needs to be activated. While in Hyd Press
• Scroll down until “Set Bin Zero” is
highlighted.
Setup mode the hydraulic safety features and
electronic overrides are switched off. When • Ensure the bin is all the way down by using
these features are active it will be impossible the bin tip lever.
to set the hydraulic pressure properly. • Press and hold the "SELECT" button for 3
seconds or until you’ve heard 3 beeps.
• Scroll down until “Set Bin Full” is highlighted.

436 REVISION 0
B25D & B30D Mk III 6X6 ADT CHAPTER 6 872150

• Move the bin all the way up by using the bin tip
lever.
• Press and hold the "SELECT" button for 3
seconds or until you’ve heard 3 beeps.

Setting the Main Pump Pressures

• Start the truck.


• Activate “Service Mode” and go to “Hyd
Press Setup”. Select “Hyd Pump”.
• Connect the pressure gauge to Test Point
MP1.
• The gauge should read the pump residual
pressure of 25 Bar. If the pressure is incorrect,
the pump needs to be adjusted.
• Remove the cap on the residual pressure
adjustment screw of the pump controller. Be
careful not to lose the dowty washer.
• Loosen the locking nut on the adjustment
screw.
• At idle, turn the screw clockwise to increase
the pressure and anti-clockwise to decrease
the residual pressure.
• Lock the screw with the locking nut once the
correct pressure has been set.
• Put back the cap on the residual pressure
adjustment screw and tighten. Remove bot residual valve cap (1), loosen nut,
and turn adjusting screws out one full turn.
Residual Valve Pressure Setting
Adjust first residual valve to specification. Turn
adjusting screw in to increase pressure.
Do Hydraulic System Warm-Up Procedure to
heat hydraulic oil to specified temperature. (See Tighten nut and install cap.
“Hydraulic System Warm-Up Procedure” on
page 434). Use monitor display menu to monitor Tighten nut and install cap.
hydraulic oil temperature. (See Menu Display
Unit - Menu Function in CHAPTER 8 of the
OM). Compensator Valve Pressure Setting

Connect the pressure gauge to Test Point MP1. Do Hydraulic System Warm-Up Procedure to
heat hydraulic oil to specified temperature. (See
Run engine at specification. “Hydraulic System Warm-Up Procedure” on
page 434). Use monitor display menu to monitor
Record pressure reading. Adjust pressure as hydraulic oil temperature. (See Menu Display
necessary. Unit - Menu Function in CHAPTER 8).

Tilt cab for access to main hydraulic pump. Do Run engine at specification.
Tilt and lower the cab procedure. (See
CHAPTER 7, SECTION 1 in OM.) Go to MDU and select required menu.

‹ CAUTION Raise the bin to full height.

Beware of rotating drive shaft when making Actuate bin raise function over relief.
adjustment on main hydraulic pump. Keep all
tools and equipment stored away from Record pressure reading. Adjust as necessary.
openings so they do not fall into the drive
shaft. Wear close fitting clothing. Remove compensator valve cap, loosen nut, and
turn adjusting screws out one full turn.

REVISION 0 437
872150 CHAPTER 6 B25D & B30D Mk III 6X6 ADT

Adjust first compensator valve to specification. Connect digital pressure/temperature analyser


and transducer or a gauge to port MP1 of test
Turn adjusting screw in to increase pressure. port manifold.

Tighten nut and install cap. Do Hydraulic System Warm-Up Procedure to


heat hydraulic oil to specified temperature. (See
NOTE: Turn second compensator valve “Hydraulic System Warm-Up Procedure” on
adjusting screw in until a slight pressure rise page 434.) Use monitor display menu to monitor
is noticed, then tighten nut. hydraulic oil temperature. (See Menu Display
Unit - Menu Function in CHAPTER 8).
Tighten nut and install cap.
Run engine at specification.
De-select “Hyd Press Setup”
Raise the bin to full height.
SYSTEM RELIEF VALVE AND Actuate bin raise function over relief.
BIN RAISE CIRCUIT RELIEF
VALVE TEST ‹ CAUTION
It is only necessary to adjust one main pump
Specifications compensator valve for this test. Compensator
valve MUST be adjusted to specification after
Hydraulic Oil Temperature test is complete.
. . . . . . . . . . . . . . 50 ± 5°C (120± 10°F)
Engine Speed . . . . . . . . . 1500 ± 20 r.p.m. While monitoring pressure gauge, adjust one
main hydraulic pump compensator valve IN to
System Relief Valve Pressure increase pressure. The point at which the
. . . . . . . . . . . . . . 28 000 + 2000 –0 kPa
. . . . . (280 + 20 – 0 bar) (4061 + 290 – 0 psi) pressure ceases to increase is the system and
bin raise circuit relief valves setting.
Bin Raise Circuit Relief Valve Pressure . . . . .
. . . . . . . . . . . . . . 28 000 + 2000 –0 kPa
. . . . . (280 + 20 – 0 bar) (4061 + 290 – 0 psi)

Essential Tools 1

• JT03482 High Pressure Test Hose Kit. A4

02

Service Equipment And Tools TT B5 B6

• JT02156A Digital Pressure/Temperature A5 A6

Analyser.
2 M5

The purpose of this test is to check the pressure


settings of the system relief valve and the bin 210907 - HydBackGDS0006CV

raise circuit relief valve.


If pressure reading is low, replace system relief
System and bin raise circuit relief valves are not valve (2) and repeat test. If pressure reading is
adjustable. It will be necessary to replace relief still low replace bin raise circuit relief valve (1).
valve(s) if not within specification.
Adjust compensator valve to specification. (See
‹ CAUTION “Main Hydraulic Pump Residual and
Compensator Valves Test andf Adjustment”
To perform this test, machine MUST be on page 407).
parked in an area that will allow bin to be
raised to full height.

Install articulation locking bar.

438 REVISION 0
B25D & B30D Mk III 6X6 ADT CHAPTER 6 872150

PRIORITY VALVE TEST ACCUMULATOR PRESSURE


REDUCING VALVE TEST AND
Specifications ADJUSTMENT
Hydraulic Oil Temperature
. . . . . . . . . . . . . . . 50 ± 5°C (120± 10°F) Specifications
Engine Speed . . . . . . . . . . 600 ± 20 r.p.m.
Hydraulic Oil Temperature. . . . . . 50°C ± 5°C
Main Hydraulic Pump Load Sense Pressure . . . . . . . . . . . . . . . . . . . (12°F ± 10°F)
. . . . . . 1500 kPa (15 bar) (218 psi) minimum
Engine Speed . . . . . . . . . 1000 ± 20 r.p.m.
Essential Tools Accumulator Pressure Reducing Valve Pressure
. . . . . . . . . . . . . . . 18 500 - 19 500 kPa
. . . . . . . . (185 - 195 bar) (2685 - 2830 psi).
• JT03482 High Pressure Test Hose Kit
Essential Tools
Service Equipment And Tools
• JT03482 High Pressure Test Hose Kit
• JT02156A Digital Pressure/Temperature
Analyser 0 - 1000 psi Gauge Service Equipment And Tools
The purpose of this test is to verify the operation
of the priority valve. • JT02156A Digital Pressure/Temperature
Analyser
Connect digital pressure/temperature analyser
and transducer or a gauge to port ML1 of The purpose of this test is to check the
hydraulic system manifold. (See “Hydraulic accumulator pressure reducing valve pressure
System Manifold Operation (Top View)” on setting and adjust as necessary.
page 404).
‹ CAUTION
Do Hydraulic System Warm-Up Procedure to To avoid injury from escaping fluid under
heat hydraulic oil to specified temperature. (See pressure, stop engine and relieve pressure in
“Hydraulic System Warm-Up Procedure” on the system before disconnecting hydraulic
page 434.) Use monitor display menu to monitor lines. Tighten all connections before applying
hydraulic oil temperature. (See Menu Display pressure.
Unit - Menu Function in CHAPTER 8).
Apply and release brake pedal approximately 35
Run engine at specification.
- 40 times to relieve pressure from system.
Starting with machine against right or left steering
Connect digital pressure/temperature analyser
stop, steer machine in opposite direction as fast
and transducer or a gauge to port M4 of test port
as the hydraulics will allow.
manifold.
Read pressure gauge while steering. Pressure
Do Hydraulic System Warm-Up Procedure to
should be no less than specification. If pressure
heat hydraulic oil to specified temperature. (See
is less, replace priority valve. (See Hydraulic
“Hydraulic System Warm-Up Procedure” on
System Manifold Assembly CHAPTER 14,
page 434.) Use monitor display menu to monitor
SECTION 1 in the Repair Manual).
hydraulic oil temperature. (See Menu Display
Unit - Menu Function in CHAPTER 8).

Run engine at specification.

REVISION 0 439
872150 CHAPTER 6 B25D & B30D Mk III 6X6 ADT

‹ CAUTION Essential Tools


Brake accumulators must be completely
charged before taking pressure reading. • JT03482 High Pressure Test Hose Kit

Actuate brake pedal repeatedly until main Service Equipment And Tools
hydraulic pump goes into stroke to charge brake
accumulators. Allow accumulators to charge • JT02156A Digital Pressure/Temperature
completely. Analyser

The purpose of this test is to check the brake


accumulator charge valve pressure setting and
adjust as necessary.
ML1

ML3
X3 S4
‹ CAUTION
To avoid injury from escaping fluid under
MP3
X4
MP2

SP1
MR
pressure, stop engine and relieve pressure in
the system before disconnecting hydraulic
MP1

lines. Tighten all connections before applying


XB

1 pressure.

Apply and release brake pedal approximately 35


- 40 times to relieve pressure from system.

Activate “Service Mode” and go to “Hyd Press


Setup”. Select “Hyd Pump”

210907 - HydBoGDS0007CV
Ensure that the pump pressures have been set.

Connect digital pressure/temperature analyser


Actuate bin raise function over relief. Record and transducer or a gauge to port M4 of test port
pressure reading. Adjust accumulator pressure manifold.
reducing valve XB (1) as necessary.
Do Hydraulic System Warm-Up Procedure to
BRAKE ACCUMULATOR heat hydraulic oil to specified temperature. (See
“Hydraulic System Warm-Up Procedure” on
CHARGE VALVE TEST AND page 434.) Use monitor display menu to monitor
ADJUSTMENT hydraulic oil temperature. (See Menu Display
Unit - Menu Function in CHAPTER 8).
Specifications Run engine at specification.
Hydraulic Oil Temperature 50 ± 5°C (120± 10°F)
NOTE: Main hydraulic pump will go into
Engine Speed . . . . . . . . . 1000 ± 20 r.p.m. stroke and charge pressure will start to rise at
Accumulator Circuit Charge Pressure approximately 13 000 kPa (130 bar) (1885 psi).
. . . . . . . . . . . . . . . 16 500 - 17 500 kPa This pressure cannot be adjusted.
. . . . . . . . . (165 - 175 bar) (2393 - 2538 psi)

440 REVISION 0
B25D & B30D Mk III 6X6 ADT CHAPTER 6 872150

Actuate brake pedal repeatedly until main Essential Tools


hydraulic pump goes into stroke to charge brake
accumulators.
• JT03482 High Pressure Test Hose Kit.

Service Equipment And Tools


1

ML1
• JT02156A Digital Pressure/Temperature
ML3
Analyser.
X3 S4
MP3
X4
MP2
The purpose of this test is to check operation of
SP1
MP1 MR brake low pressure switch S4 and to check the
XB gas charge pressure of the brake accumulator in
port A4 of hydraulic system manifold.

‹ CAUTION
To avoid injury from escaping fluid under
pressure, stop engine and relieve pressure in
the system before disconnecting hydraulic
lines. Tighten all connections before applying
pressure.
210907 - HydX4GDS0008CV
Apply and release brake pedal approximately 35
The pressure will rise until accumulators are fully - 40 times to relieve pressure from system.
charged. Take pressure reading at this time.
Connect digital pressure/temperature analyser
Adjust the brake charge pressure X4 (1) by and transducer or a gauge to port M4 of test port
turning the adjustment screw clockwise to manifold.
increase the pressure and anti-clockwise to
reduce the pressure. It is important to note that Do Hydraulic System Warm-Up Procedure to
the pressure on the gauge will not change during heat hydraulic oil to specified temperature. (See
the adjustments. “Hydraulic System Warm-Up Procedure” on
page 405.) Use menu display menu to monitor
NOTE: The brake accumulators first need to hydraulic oil temperature. (See Menu Display
be discharged to see the effect of each Unit - Menu Function in CHAPTER 8 of OM).
adjustment. The charge band for the
accumulators should be from approximately Stop engine.
130 Bar to 165 Bar. The lower limit of the
charge band is not adjustable. Turn key switch to ON position. DO NOT start
engine.
Accumulators must be discharged and main
hydraulic pump allowed to go to stroke after each NOTE: Other indicator lights may be ON or
adjustment to obtain proper reading. flashing but buzzer does not sound because
engine is not running.

BRAKE LOW PRESSURE


SWITCH AND BRAKE
ACCUMULATOR TEST

Specifications
Hydraulic Oil Temperature
. . . . . . . . . . . . . . 50 ± 5°C (120 ± 10°F)
Brake Low Pressure Indicator Light Actuation
Pressure . . . . . . . . . . 12 300 - 12 500 kPa
. . . . . . . . . (123 - 125 bar) (1785 - 1815 psi)
Brake Accumulator Gas Charge
Pressure . . . . . . . . . . . . 8000 ± 350 kPa
. . . . . . . . . . . (60 ± 3.5 bar) (870 ± 50 psi)

REVISION 0 441
872150 CHAPTER 6 B25D & B30D Mk III 6X6 ADT

Apply and release brake pedal until brake low


pressure indicator light comes ON. Record the
pressure reading when indicator light comes ON.

NOTE: Brake accumulator is not serviceable.

1
ML1

ML3
X3 S4
MP3
X4
MP2

SP1
MP1 MR

XB

Remove accumulator charging valve guard (1)


and cap (2).

‹ WARNING
USE ONLY dry nitrogen to charge brake
accumulators. DO NOT use compressed air or
any other gas as they may be combustible or
210907 - HydS4GDS0009CV
cause oxidation and condensation in the
accumulator.
If indicator light does not come ON at
specification, replace brake low pressure switch Connect charging adapter and hose to charging
S4 (1). valve of accumulator.

FRONT AND REAR BRAKE ‹ CAUTION


ACCUMULATORS PRESSURE Loosen outer nut ONLY to open charging
valve. DO NOT loosen the inner nut, to do so
TEST AND CHARGE will remove charging valve fitting. If charging
PROCEDURE valve fitting is removed with pressure in
accumulator, personal injury may result.
Specifications
Turn outer nut (3) of charging valve counter
Accumulator Pre-Charge clockwise to open. Do not loosen inner nut.
Pressure . . . . . 8000 ± 350 kPa (80 ± 3.5 bar)
. . . . . . . . . . . . . . . . . . (1160 ± 50 psi) Record accumulator pre-charge pressure.
Charge accumulator to specification if necessary.
Essential Tools
Apply and release brake pedal approximately 3 -
• JT03522 Charging Adapter 4 times to relieve any pressure buildup in system.

The purpose of this test is to measure pre-charge Turn outer nut of charging valve clockwise to
pressure in each individual front and rear brake close.
accumulator and charge if necessary.
Close nitrogen regulator and remove charging
Apply and release brake pedal approximately 35 adapter and hose.
- 40 times to relieve pressure from system.
Install charging valve cap and guard.

Repeat procedure for each accumulator.

442 REVISION 0
B25D & B30D Mk III 6X6 ADT CHAPTER 6 872150

SERVICE BRAKE VALVE TEST

Specifications
Hydraulic Oil Temperature 50 ± 5°C (120 ± 10°F)
Engine Speed . . . . . . . . . 1000 ± 20 r.p.m.
Full Pedal Travel Pressure
. . . . . . . . . . . . . . . . 12 000 ± 500 kPa
. . . . . . . . . . . (120 ± 5 bar) (1740 ± 70 psi)
Pedal Release Pressure. . . . . . . . . . 70kPa
. . . . . . . . . . . . . (0.70 bar) (10psi) or less.

Essential Tools

• 38H1031 (–8M x –8M x –8F ORFS) Disconnect front axle brake line (1), or rear axle
(Parker No. 8R6LO) Swivel Run Tee brake line (2).
• JT03479 (1/2 Male Quick Coupler x –8 F
ORFS) Adapter Connect digital pressure/temperature analyser
and transducer or a gauge to brake line using
Service Equipment And Tools swivel run tee and adapter.

Do Hydraulic System Warm-Up Procedure to


• JT05412 Pressure Test Kit heat hydraulic oil to specified temperature. (See
• JT02156A Digital Pressure/Temperature “Hydraulic System Warm-Up Procedure” on
Analyser page 434.) Use monitor display menu to monitor
hydraulic oil temperature. (See Menu Display
The purpose of this test is to check operation of Unit - Menu Function in CHAPTER 8).
the brake valve and record brake pressures at
full pedal travel and with pedal released. Run engine at specified speed.

‹ CAUTION ‹ CAUTION
Prevent personal injury from unexpected Brake pressure must decrease to 70 kPa (0.70
machine movement. Always install bar) (10 psi) or less after brake pedal release
articulation locking bar before working in the to prevent excessive drag which causes
articulation joint area. premature wear to brake pads and disks.

Install articulation locking bar. While observing pressure reading, slowly


depress brake pedal to the end of its travel and
‹ CAUTION then slowly release the pedal.
To avoid injury from escaping fluid under Record pressure reading at end of pedal travel
pressure, stop engine and relieve pressure in and after pedal is released.
the system before disconnecting hydraulic
lines. Tighten all connections before applying The pressure must increase gradually and reach
pressure. specification at full pedal travel and gradually
decrease to specification upon pedal release.
Apply and release brake pedal approximately 35
- 40 times to relieve pressure from system. If pressure is not to specification with pedal
depressed, do “Accumulator Pressure
Reducing Valve Test And Adjustment” on
page 439and “Brake Accumulator Charge
Valve Test And Adjustment” on page 440.

REVISION 0 443
872150 CHAPTER 6 B25D & B30D Mk III 6X6 ADT

If pressure does not increase or decrease While holding the steering against the stop (and
gradually as pedal is depressed and released, while keeping the engine at 1000 RPM).
inspect brake valve. (See Disassemble and
Assemble Brake Valve. CHAPTER 9, SECTION
2 in the Repair Manual). 1

STEERING RELIEF VALVE ML1

PRESSURE TEST AND MP3


ML3
X3

X4
S4

ADJUSTMENT
MP2

SP1
MP1 MR

Specifications
XB

Hydraulic Oil Temperature


. . . . . . . . . . . . . . . 50 ± 5°C (120± 10°F)
Engine Speed . . . . . . . . . 1000 ± 20 r.p.m.)
Steering Relief Valve Pressure
. . . . . . . . . 19 500 kPa (195 bar) (2828 psi)

Essential Tools
210907 - HydX3GDS0010CV

• JT03482 High Pressure Test Hose Kit Adjust steering relief valve X3 (1) to specification.
(Adjust the steering LS relief setting by turning
Service Equipment And Tools the adjustment screw clockwise to increase the
pressure and anti-clockwise to reduce the
• JT02156A Digital Pressure/Temperature pressure).
Analyser
Lock the screw with the locking nut once the
The purpose of this test is to check the steering correct pressure has been set.
relief valve pressure setting and adjust as
necessary. Tilt cab for access to main hydraulic pump. Do
Tilt and lower the cab procedure. (See
Connect digital pressure/temperature analyser Procedure in Part 2 of this Manual).
and transducer or a gauge to port MP1 of test
port manifold. ‹ CAUTION
Beware of rotating drive shaft when making
Do Hydraulic System Warm-Up Procedure to
adjustment on the hydraulic system manifold.
heat hydraulic oil to specified temperature. (See
Keep all tools and equipment stored away
“Hydraulic System Warm-Up Procedure” on
from openings so they do not fall into the
page 434.) Use monitor display menu to
drive shaft. Wear close fitting clothing.
monitor hydraulic oil temperature. (See Menu
Display Unit - Menu Function in CHAPTER 8
in the OM). STEERING CYLINDER LEAKAGE
Run engine at specification. TEST
Turn the steering wheel to the left and hold it Specifications
against the arctic lock, while revving the engine
to 1000 RPM. The pressure on the gauge should Hydraulic Oil Temperature 50 ± 5°C (120± 10°F)
rise to 195 Bar. If it doesn’t, the pressure needs
Engine Speed . . . . . . . . . . 600 ± 20 r.p.m.
to be adjusted on the steering LS relief valve -
Valve X3 on the main hydraulic manifold. Steering Against Stop Time . . . . . 20 seconds
Piston Seal Leakage . . 15 mL/min (1/2 oz/min)
Loosen the locking nut on X3. . . . . . . . . . . . . . . . . . . . approximate.

The purpose of this test is to measure steering


cylinder piston seal leakage.

444 REVISION 0
B25D & B30D Mk III 6X6 ADT CHAPTER 6 872150

Do Hydraulic System Warm-Up Procedure to Service Equipment And Tools


heat hydraulic oil to specified temperature. (See
“Hydraulic System Warm-Up Procedure” on
page 434.) Use monitor display menu to monitor
• JT02156A Digital Pressure/Temperature
Analyser
hydraulic oil temperature. (See Menu Display
Unit - Menu Function in CHAPTER 8 in OM).
The purpose of this test is to check the residual
and compensator valve pressure settings and
NOTE: Check steering cylinder for leakage in
adjust as necessary.
fully extend position. In retracted position,
piston contacts head end of cylinder, Install articulation locking bar.
blocking leakage flow across piston seal to
head end port.
‹ CAUTION
Turn machine left or right against steering stop to Inter-axle lock MUST be disengaged and
extend steering cylinder to be checked. Stop transfer case-to-oscillation joint drive shaft
engine. MUST be removed to prevent movement of
machine while performing this test.
Disconnect line from rod end port of the extended
cylinder. Install plug in open line. Place a Apply park brake and put inter-axle lock switch
graduated measuring container under open into the disengage position.
cylinder port to catch leakage.
Remove transfer case-to-oscillation joint drive
Start engine and run at specification. shafts. (See CHAPTER 2, SECTION 3 in the
Repair Manual.)
Turn steering wheel against stop in same
direction as machine is turned. Hold against stop Connect digital pressure/temperature analyser
for 20 seconds. Record leakage and multiply and transducer or a gauge to port MP2 of test
reading by three (x 3). port manifold.
If leakage is over specification, inspect Steering Do Hydraulic System Warm-Up Procedure to
Cylinder piston seals. (See CHAPTER 8, heat hydraulic oil to specified temperature. (See
SECTION 2 in the Repair Manual.) “Hydraulic System Warm-Up Procedure” on
page 434). Use monitor display menu to monitor
SECONDARY STEERING PUMP hydraulic oil temperature. (See Menu Display
Unit - Menu Function in CHAPTER 8).
RESIDUAL AND
COMPENSATOR VALVES TEST Connect digital pressure/temperature analyzer
and transducer or a gauge to port MP2 of test
AND ADJUSTMENT port manifold.

Specifications Start machine and shift to “D” (forward), range


“1”, and activate “Range Hold” function. Run
Hydraulic Oil Temperature 50 ± 5°C (120± 10°F) engine at specification.
Engine Speed . . . . . . . . . 1000 ± 20 r.p.m.
Special Test Steering Relief Pressure
Residual Valve Adjustment
. . . . . . . . . 23 000 kPa (230 bar) (3336 psi).
Engine Speed . . . . . . . . . . 1500 ± 20 r.p.m Specification
Residual Valve Pressure Residual Valve - Pressure . . . 2 200 ± 100 kPa
. . . . 2200 ± 100 kPa (22 ± 1 bar)(319 ± 15 psi) . . . . . . . . . . . . (22 ± 1 bar) (319 ± 15 psi)
Compensator Valve Pressure
. . . . . . . . . 21 000 kPa (210 bar) (3045 psi)
Steering Relief Pressure
. . . . . . . . . 19 500 kPa (195 bar) (2828 psi).

Essential Tools

• JT03482 High Pressure Test Hose Kit

REVISION 0 445
872150 CHAPTER 6 B25D & B30D Mk III 6X6 ADT

Essential Tools

• JT03482 High Pressure Test Hose Kit

Service Equipment And Tools

• JT02156A Digital Pressure/Temperature


Analyser

The purpose of this test is to check that the bin


lower circuit relief valve is operating within its
specified range.

Connect digital pressure/temperature analyser


and transducer or a gauge to port MP1 of test
Without turning the steering wheel, record port manifold.
pressure reading. Adjust residual valve (1) to
specification. Turn adjusting screw in to increase Do Hydraulic System Warm-Up Procedure to
pressure. heat hydraulic oil to specified temperature. (See
“Hydraulic System Warm-Up Procedure” on
Tighten nut and install cap. page 434.) Use monitor display menu to monitor
hydraulic oil temperature. (See Menu Display
Unit - Menu Function in CHAPTER 8).
Compensator Valve Adjustment
Run engine at specification.
Turn machine left or right against steering stop,
allowing steering circuit to go over relief. Record
pressure reading. Adjust compensator valve (2)
to specification.

Specification
Compensator Valve - Pressure . . . 21 000 kPa
. . . . . . . . . . . . . . . (210 bar) (3045 psi)

Tighten nut and install cap.

Run engine at specification. Turn machine left or


right against locking bar, allowing steering circuit
to go over relief.

Adjust X3 steering relief to standard machine Hold bin tip lever in the lower position until bin
specification. (See “Steering Relieve Valve lower circuit is over relief. Record pressure
Pressure Test And Adjustment” on page 413). reading. Replace bin lower circuit relief valve (1)
Install transfer case-to-oscillation joint drive shaft. if pressure reading is not within specification.
(See Drive Shafts CHAPTER 2, SECTION 3 in
repair manual.)

BIN LOWER CIRCUIT RELIEF


VALVE TEST

Specifications
Hydraulic Oil Temperature 50 ± 5°C (120± 10°F)
Engine Speed . . . . . . . . . . 600 ± 20 r.p.m.
Bin Lower Circuit Pressure . 8 000 - 10 000 kPa
. . . . . . . . . (80 - 100 bar) (1160 - 1450 psi)