DRR Manual of Procedure DOCUMENTATION/PUBLISHING

I. Objective: I. Objective:
1. Prepared DRR Manual of Procedure 1. Documentation/ publish documentation
II. Time Frame: 12 Weeks from SENDONG activities
III. Schedule/Plan of Action ( see Schedule II. Time Frame: 7-8 weeks
page) III. Schedule
1. 1st week: profiling/: identifying core 1. 1st week: gathering of materials
group for manual; emailing possible 2. 2nd week: rechecking/evaluating
core group published materials
2. 2nd week: gathering of materials 3. 3rd week: selection of materials
3. 3rd week: rough draft of manual outline 4. 4th week: draft of Comprehensive
of contents; documentation
4. 4th week: 1st meeting for manual 5. 5th week: Printing of Documentation
content/draft ( rough draft to be Draft/ editing content and technical
prepared already) aspects
5. 5th week: Writing of manual draft 6. 6th week: Finalizing Documentation for
6. 6th week: Meeting: writing of manual Publishing
draft/ follow up meeting 7. 7th Week: editing and publishing
7. 7th Week: writing of manual draft IV. Sources of Materials
8. 8th week: meeting: finalizing manual 1. Fr Eric
draft 2. Tabang Sendong website
9. 9th week: meeting: finalizing manual 3. Communication’s group
draft 4. Newspaper ( local)
10. 10th week: Finalizing manual 5. DevComm
11. 11th week: Meeting: final manual V. Core group
12. 12th week: Editing/ printing final manual 1. Fr Eric ( tabang sending)
IV. Identify Core group for Manual of 2. DRR
Procedure development/creation
1. ERC
2. SOM
3. KKP
4. NSTP Questions:
5. DEVCOMM/Ecoville
6. SuSan 1. Output is brochure type? Magazine type?
7. RCE Newspaper? Journal?
V. 2.