This document provides details for the plumbing system methodology for the PN Hafeez Hospital project in Islamabad, Pakistan. It includes calculations for the underground water tank capacity and required throughput flows to meet the project's water demands. It also specifies parameters for the deep well submersible pump, such as the pumping level, submergence level, piping lengths, cycling times, and required maximum flow of 918 gallons per minute. The document recommends upgrading the discharge pipe size from 8 inches to satisfy velocity and friction head loss criteria.
This document provides details for the plumbing system methodology for the PN Hafeez Hospital project in Islamabad, Pakistan. It includes calculations for the underground water tank capacity and required throughput flows to meet the project's water demands. It also specifies parameters for the deep well submersible pump, such as the pumping level, submergence level, piping lengths, cycling times, and required maximum flow of 918 gallons per minute. The document recommends upgrading the discharge pipe size from 8 inches to satisfy velocity and friction head loss criteria.
This document provides details for the plumbing system methodology for the PN Hafeez Hospital project in Islamabad, Pakistan. It includes calculations for the underground water tank capacity and required throughput flows to meet the project's water demands. It also specifies parameters for the deep well submersible pump, such as the pumping level, submergence level, piping lengths, cycling times, and required maximum flow of 918 gallons per minute. The document recommends upgrading the discharge pipe size from 8 inches to satisfy velocity and friction head loss criteria.
DATED: 27TH JANUARY, 2020 SUBJECT PLUMBING SYSTEM METHODOLOGY (DWSP-01A/01B) DEEP WELL SUBMERSIBLE PUMP CALCULATIONS
TANK SPECIFICS AND REQUIRED THROUGHPUT FLOW CALCULATIONS
TOTAL WATER HOLDING CAPACITY OF U.G.W.T (EXCLUDES 1 FEET
= 225,176 GALLONS OF CLEAR BOARD HEIGHT)
TOTAL WATER DEMAND CAPACITY REQUIED FOR FIRE FIGHTING
= 60,000 GALLONS SYSTEM (1000 GPM FOR A DURATION OF 30 MINUTES)
TOTAL WATER DEMAND CAPACITY FOR 1 DAY REQUIED FOR NON-
= 165,176 GALLONS POTABLE WATER SUPPLY TO THE BUILDING TANK WATER LEVEL RELATIVE TO SITE'S GROUND LEVEL = -12.0 FEET
TOTAL WATER LEVEL HEIGHT IN THE TANK = 10.0 FEET
LOW NON-POTABLE WATER SUPPLY SWITCH LEVEL (FROM THE = 4.49 FEET INTERNAL BOTTOM SURFACE OF THE U.G.W.T)
PUMPING LEVEL (DEPTH OF WATER LEVEL IN THE WELL BELOW
= 500 FEET GRADE)
SUBMERGENCE LEVEL OF PUMP AND ITS PIPING (VERTICAL DEPTH
= 700 FEET BELOW GRADE) HORIZONTAL LENGTH OF PIPING RUN = 350 FEET TOTAL TIME REQUIRED TO REPLENISH 1 COMPLETE DAYS NON- = 4 HOURS POTABLE WATER SUPPLY FLOW DRAW CYCLING TIME OF THE DEEP WELL SUBMERSIBLE PUMP = 20 MINUTES
STOP TIME OF THE DEEP WELL SUBMERSIBLE PUMP = 5 MINUTES
STARTS PER HOUR = 3
NET PUMP OPERATION TIME = 180 MINUTES / DAY
FLOW REQUIRED AT MAXIMUM PROBABLE DEMAND = 918 GPM
TRANSFER PUMP'S - DISCHARGE PIPE SIZE (AS PER HAZEN WILLIAMS)