Professional Documents
Culture Documents
57/वििसं3
Sr.
Name of test Mass Concrete Small Concrete jobs and RCC Works Masonry Remarks
No.
Flexural strength of moulded Up to 200 m3 Work per day, one per Up to 200 m3 Work per day, one per --
27
specimens shift. shift.
Laboratory Permeability
One per month for every mix One per month for every mix
28 a) Moulded specimen Nil
proportion. proportion.
b) Drilled core One per monolith per 3 m depth. Nil One per monolith per 3 m depth.
-- i) Once a Week.
33 Setting Time of Lime --
ii) Additional if source is changed.
पृष्ट्ठ 49 पैकी 48