THERMAL/NUCLEAR UNITS OUT OF GRID FOR MORE THAN 15 DAYS DURING 2020-21 as on: 06-

Date of Maintanance
Unit
Station Capacity (MW)
No
DD/MM/YYYY HH:24MM

1 2 3 4

PANIPAT TPS 6 210.00 19/06/2020 21.53.00

INDIRA GANDHI STPP 2 500.00 01/11/2019 12.53.00

INDIRA GANDHI STPP 2 500.00 21/03/2020 23.41.00

INDIRA GANDHI STPP 2 500.00 24/03/2020 20.45.00

FARIDABAD CCPP 2 137.76 03/05/2020 00.00.00

SURATGARH TPS 1 250.00 04/03/2020 14.22.00

SURATGARH TPS 2 250.00 13/05/2020 08.15.00

SURATGARH TPS 3 250.00 11/05/2020 22.11.00

SURATGARH TPS 4 250.00 10/05/2020 19.04.00

SURATGARH TPS 5 250.00 29/07/2019 12.00.00

SURATGARH TPS 5 250.00 04/07/2019 13.06.00

SURATGARH TPS 5 250.00 26/11/2019 17.30.00

SURATGARH TPS 6 250.00 06/03/2020 13.53.00

SURATGARH TPS 7 660.00 30/04/2020 10.50.00

CHHABRA TPP 6 660.00 20/06/2020 00.00.00

ANTA CCPP 2 88.71 06/05/2020 00.00.00

ANTA CCPP 3 88.71 26/12/2019 12.30.00

ANTA CCPP 4 153.20 25/11/2019 09.24.00

ANTA CCPP 4 153.20 25/12/2019 09.24.00

HARDUAGANJ TPS 7 105.00 07/01/2020 16.15.00

PARICHHA TPS 2 110.00 30/12/2019 21.32.00

ANPARA TPS 7 500.00 13/11/2019 14.13.00

PRAYAGRAJ TPP 3 660.00 24/05/2020 11.47.00

DADRI (NCTPP) 1 210.00 30/05/2020 19.50.00

DADRI (NCTPP) 2 210.00 03/06/2020 23.51.00

DADRI (NCTPP) 3 210.00 15/02/2020 00.00.00

AURAIYA CCPP 4 111.19 26/12/2019 12.24.00

AURAIYA CCPP 5 109.30 10/10/2019 21.45.00

AURAIYA CCPP 6 109.30 18/08/2019 20.26.00

DADRI CCPP 3 130.19 30/10/2019 00.48.00

DADRI CCPP 4 130.19 26/12/2019 13.00.00

DADRI CCPP 5 154.51 10/10/2019 21.45.00

DADRI CCPP 5 154.51 11/11/2019 19.37.00


DADRI CCPP 5 154.51 25/12/2019 00.01.00

DADRI CCPP 6 154.51 30/10/2019 00.34.00

DADRI CCPP 6 154.51 30/10/2019 22.22.00

MARWA TPS 2 500.00 09/01/2020 17.02.00

OP JINDAL TPS 3 250.00 07/04/2020 00.00.00

RATIJA TPS 1 50.00 21/06/2020 02.41.00

SVPL TPP 1 63.00 29/03/2020 00.00.00

LARA TPP 1 800.00 03/06/2020 13.28.00

TAMNAR TPP 2 600.00 11/04/2020 03.00.00

TAMNAR TPP 2 600.00 15/04/2020 00.00.00

TAMNAR TPP 4 600.00 25/05/2020 12.04.00

TAMNAR TPP 4 600.00 19/03/2020 14.36.00

BINJKOTE TPP 1 300.00 18/05/2020 12.00.00

BINJKOTE TPP 1 300.00 07/11/2019 00.00.00

BINJKOTE TPP 1 300.00 13/05/2020 15.48.00

BINJKOTE TPP 1 300.00 06/11/2019 21.19.00

SATPURA TPS 6 200.00 27/03/2020 17.30.00

SATPURA TPS 7 210.00 19/03/2020 20.08.00

SATPURA TPS 8 210.00 29/02/2020 23.54.00

SATPURA TPS 9 210.00 22/02/2020 02.52.00

SATPURA TPS 9 210.00 09/08/2019 23.59.00

SHREE SINGAJI TPP 1 600.00 02/06/2020 12.15.00

SHREE SINGAJI TPP 3 660.00 26/09/2019 13.02.00

SHREE SINGAJI TPP 4 660.00 30/05/2020 15.42.00

SANJAY GANDHI TPS 1 210.00 20/06/2020 00.29.00

MAHAN TPP 1 600.00 10/05/2020 19.09.00

MAHAN TPP 2 600.00 10/05/2020 11.32.00

NIWARI TPP 1 45.00 20/06/2020 00.34.00

NIWARI TPP 2 45.00 27/07/2019 00.24.00

KHARGONE STPP 2 660.00 04/04/2020 00.00.00

UKAI TPS 3 200.00 24/03/2020 07.55.00

UKAI TPS 5 210.00 24/03/2020 09.36.00

GANDHI NAGAR TPS 3 210.00 22/03/2020 08.24.00

GANDHI NAGAR TPS 4 210.00 22/03/2020 08.21.00

GANDHI NAGAR TPS 5 210.00 23/03/2020 16.55.00

WANAKBORI TPS 1 210.00 20/03/2020 11.05.00

WANAKBORI TPS 1 210.00 12/06/2019 19.45.00

WANAKBORI TPS 1 210.00 11/06/2019 10.20.00

WANAKBORI TPS 2 210.00 03/03/2020 18.15.00


WANAKBORI TPS 2 210.00 25/07/2019 18.30.00

WANAKBORI TPS 2 210.00 24/07/2019 13.03.00

WANAKBORI TPS 3 210.00 30/06/2019 17.51.00

WANAKBORI TPS 3 210.00 26/03/2020 13.30.00

WANAKBORI TPS 3 210.00 01/09/2019 10.13.00

WANAKBORI TPS 3 210.00 31/08/2019 10.13.00

WANAKBORI TPS 3 210.00 24/10/2019 08.30.00

WANAKBORI TPS 4 210.00 20/03/2020 11.07.00

WANAKBORI TPS 5 210.00 22/03/2020 08.03.00

WANAKBORI TPS 6 210.00 28/04/2019 07.30.00

WANAKBORI TPS 6 210.00 20/03/2020 14.25.00

WANAKBORI TPS 6 210.00 27/04/2019 21.21.00

WANAKBORI TPS 7 210.00 22/03/2020 11.25.00

KUTCH LIG. TPS 1 70.00 17/08/2019 20.24.00

KUTCH LIG. TPS 2 70.00 29/09/2019 00.00.00

DGEN MEGA CCPP 1 400.00 24/04/2020 00.00.00

SABARMATI (D-F STATIONS) 1 120.00 30/11/2019 00.00.00

SABARMATI (D-F STATIONS) 1 120.00 05/06/2020 00.00.00

MUNDRA TPS-I & II 5 660.00 01/06/2020 00.01.00

KAWAS CCPP 3 106.00 26/12/2019 13.27.00

KAWAS CCPP 3 106.00 06/11/2019 18.01.00

KAWAS CCPP 5 116.10 10/12/2019 07.37.00

KAWAS CCPP 6 116.10 30/10/2019 00.34.00

GANDHAR CCPP 1 144.30 26/12/2019 13.43.00

GANDHAR CCPP 2 144.30 26/12/2019 13.43.00

NASIK TPS 3 210.00 17/02/2020 00.00.00

NASIK TPS 4 210.00 25/03/2020 19.47.00

NASIK TPS 5 210.00 12/12/2019 10.40.00

MAUDA TPS 2 500.00 23/03/2020 12.38.00

MAUDA TPS 4 660.00 26/03/2020 00.23.00

SOLAPUR 1 660.00 24/02/2020 13.59.00

SOLAPUR 2 660.00 23/03/2020 11.12.00

SOLAPUR 2 660.00 03/10/2019 14.53.00

KORADI TPS 6 210.00 06/09/2019 15.41.00

KORADI TPS 7 210.00 27/08/2019 09.52.00

KORADI TPS 8 660.00 31/05/2020 22.56.00

BHUSAWAL TPS 3 210.00 01/09/2019 17.57.00

BHUSAWAL TPS 4 500.00 01/06/2020 07.15.00

BHUSAWAL TPS 5 500.00 01/06/2020 12.21.00


PARLI TPS 6 250.00 21/03/2020 17.31.00

PARLI TPS 7 250.00 12/05/2020 19.34.00

PARLI TPS 8 250.00 01/06/2020 13.13.00

URAN CCPP 6 108.00 22/03/2020 00.00.00

TROMBAY TPS 8 250.00 11/04/2020 16.55.00

JSW RATNAGIRI TPP 3 300.00 30/04/2020 15.13.00

RATNAGIRI CCPP 4 213.00 12/03/2020 19.52.00

RATNAGIRI CCPP 8 213.00 23/03/2020 00.10.00

TIRORA TPS 1 660.00 03/06/2020 15.02.00

TIRORA TPS 4 660.00 12/06/2020 10.30.00

TIRORA TPS 5 660.00 04/06/2020 12.29.00

AMARAVATI TPS 1 270.00 04/03/2020 19.30.00

AMARAVATI TPS 1 270.00 01/09/2019 09.11.00

AMARAVATI TPS 2 270.00 25/07/2019 02.00.00

AMARAVATI TPS 2 270.00 09/03/2020 20.15.00

AMARAVATI TPS 3 270.00 11/02/2020 18.00.00

AMARAVATI TPS 4 270.00 12/11/2019 00.00.00

AMARAVATI TPS 5 270.00 11/02/2020 19.30.00

TARAPUR 1 160.00 08/01/2020 00.00.00

RAICHUR TPS 2 210.00 05/04/2020 10.44.00

RAICHUR TPS 2 210.00 19/05/2020 11.39.00

RAICHUR TPS 4 210.00 12/06/2020 20.00.00

RAICHUR TPS 5 210.00 13/06/2020 19.45.00

RAICHUR TPS 5 210.00 07/02/2020 19.54.00

RAICHUR TPS 7 210.00 02/06/2020 07.34.00

RAICHUR TPS 8 250.00 29/04/2020 00.00.00

KUDGI STPP 1 800.00 07/04/2020 12.37.00

KUDGI STPP 2 800.00 27/03/2020 09.36.00

KUDGI STPP 2 800.00 06/07/2019 20.52.00

TORANGALLU TPS(SBU-I) 2 130.00 12/04/2020 00.00.00

TORANGALLU TPS(SBU-II) 4 300.00 29/12/2019 15.49.00

BELLARY TPS 1 500.00 02/06/2020 13.44.00

BELLARY TPS 1 500.00 05/02/2020 16.21.00

BELLARY TPS 2 500.00 27/06/2019 14.57.00

BELLARY TPS 2 500.00 28/06/2019 00.00.00

BELLARY TPS 2 500.00 02/06/2020 16.31.00

BELLARY TPS 2 500.00 10/02/2020 23.46.00

BELLARY TPS 3 700.00 17/10/2019 12.00.00

BELLARY TPS 3 700.00 06/04/2020 13.15.00


BELLARY TPS 3 700.00 25/12/2019 12.20.00

YERMARUS TPP 1 800.00 03/06/2020 13.15.00

UDUPI TPP 1 600.00 03/06/2020 13.23.00

UDUPI TPP 2 600.00 07/05/2020 10.36.00

TUTICORIN TPS 5 210.00 03/11/2019 22.02.00

VALANTARVY CCPP 1 38.00 04/06/2020 23.14.12

VALANTARVY CCPP 2 14.80 04/06/2020 22.14.12

MUTHIARA TPP 1 600.00 05/04/2020 16.11.00

NEYVELI TPS- I 2 50.00 20/06/2020 17.23.00

NEYVELI TPS- I 4 50.00 14/05/2020 09.34.00

NEYVELI TPS- I 8 100.00 04/06/2020 15.36.00

NEYVELI TPS-II 6 210.00 07/05/2020 16.41.00

VALLUR TPP 1 500.00 19/11/2019 22.59.00

VALLUR TPP 1 500.00 09/04/2020 15.26.00

VALLUR TPP 2 500.00 27/03/2020 23.00.00

VALLUR TPP 2 500.00 19/03/2020 16.30.00

VALLUR TPP 2 500.00 19/03/2020 14.40.00

VALLUR TPP 2 500.00 02/12/2019 12.18.00

VALLUR TPP 2 500.00 23/08/2019 09.21.00

KUDANKULAM 1 1000.00 31/05/2020 00.22.00

ITPCL TPP 1 600.00 01/06/2020 01.23.00

ITPCL TPP 1 600.00 11/06/2020 00.00.00

KOTHAGUDEM TPS (NEW) 9 250.00 04/06/2020 02.24.00

SINGARENI TPP 1 600.00 01/06/2020 03.30.00

RAYALASEEMA TPS 1 210.00 04/03/2020 22.50.00

RAYALASEEMA TPS 2 210.00 22/02/2020 20.47.00

RAYALASEEMA TPS 3 210.00 07/06/2020 22.22.00

RAYALASEEMA TPS 4 210.00 01/03/2020 19.24.00

RAYALASEEMA TPS 5 210.00 18/02/2020 20.26.00

RAYALASEEMA TPS 6 600.00 26/03/2020 00.00.00

VIJJESWARAM CCPP 2 33.00 24/02/2020 00.00.00

VIJJESWARAM CCPP 2 33.00 04/01/2020 13.27.00

VIJJESWARAM CCPP 3 34.00 31/03/2020 17.07.00

SIMHADRI 2 500.00 19/05/2020 12.11.00

JEGURUPADU CCPP PH I 1 52.80 23/05/2020 06.56.00

JEGURUPADU CCPP PH I 3 52.80 26/03/2020 16.25.00

JEGURUPADU CCPP PH I 3 52.80 01/06/2020 16.19.00

JEGURUPADU CCPP PH I 3 52.80 07/03/2020 13.45.00

JEGURUPADU CCPP PH I 3 52.80 06/03/2020 15.31.00


GODAVARI CCPP 3 47.00 28/12/2019 13.58.25

GODAVARI CCPP 3 47.00 18/02/2019 00.00.00

BARAUNI TPS 6 105.00 25/02/2020 06.56.00

BARAUNI TPS 7 105.00 28/05/2020 07.04.00

MUZAFFARPUR TPS 1 110.00 11/12/2019 23.12.00

MUZAFFARPUR TPS 2 110.00 19/10/2019 22.12.00

NABI NAGAR TPP 3 250.00 24/04/2020 12.54.00

DURGAPUR TPS 4 210.00 02/03/2020 17.42.00

MEJIA TPS 1 210.00 31/10/2019 17.54.00

MEJIA TPS 1 210.00 10/03/2020 23.25.00

BANDEL TPS 1 60.00 04/06/2020 18.26.00

KOLAGHAT TPS 2 210.00 26/12/2019 22.48.00

KOLAGHAT TPS 3 210.00 13/06/2020 15.15.00

KOLAGHAT TPS 6 210.00 16/01/2020 23.37.00

SAGARDIGHI TPS 2 300.00 18/03/2020 12.20.00

SOUTHERN REPL. TPS 2 67.50 15/01/2020 21.04.00

BOKARO `B` TPS 3 210.00 12/09/2019 03.22.00

DARLIPALI STPS 1 800.00 10/06/2020 13.15.00

DERANG TPP 2 600.00 29/04/2020 01.15.00

BARAMURA GT 5 21.00 31/10/2019 20.45.00

ROKHIA GT 8 21.00 11/06/2020 00.00.00

NAMRUP CCPP 5 24.00 31/08/2019 02.00.00

LAKWA GT 7 20.00 08/01/2020 10.03.00

LAKWA GT 7 20.00 06/01/2020 00.00.00

Total 64,063.40
ORITY

NG DIVISION

DAYS DURING 2020-21 as on: 06-07-2020

Expected date of return


remarks
DD/MM/YYYY

5 6

WATER WALL TUBE LEAKAGE

RSD/LOW SCHEDULE

GRID DISTURBANCE

RESERVE SHUT DOWN / STANDBY UNIT

RSD/LOW SCHEDULE

FUEL OIL PROBLEM

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

BOILER OVERHAUL/ ANNUAL MAINTENANCE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

TURBINE MISC. PROBLEMS

14/07/2020 BOILER OVERHAUL/ ANNUAL MAINTENANCE

RESERVE SHUT DOWN / STANDBY UNIT

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

R AND M / REFURBISHMENT works

HYDROGEN PRESSURE PROBLEM

GT/WHRB/ST PLANNED OVERHAUL

CONSERVATION OF MAIN FUEL/RSD

CONSERVATION OF MAIN FUEL/RSD

CONSERVATION OF MAIN FUEL/RSD

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

GT- LOW SYSTEM DAMAND

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE
RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

ASH HANDLING SYSTEM PROBLEM

COAL SHORTAGE

MISCELLANEOUS PLANNED MAINTENANCE

NON AVAILABILITY OF MAN POWER

RSD/LOW SCHEDULE

AIR PREHEATERS PROBLEM

COAL SHORTAGE

COAL SHORTAGE

ELECTRICAL MISCELLANEOUS PROBLEMS

Low system demand/ costly fuel

RSD/LOW SCHEDULE

SUPER HEATER TUBE LEAKAGE

FURNACE CLINKER FORMATION

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

WATER WALL TUBE LEAKAGE

BOILER OVERHAUL/ ANNUAL MAINTENANCE

RESERVE SHUT DOWN / STANDBY UNIT

I.D. FANS PROBLEM

RSD/LOW SCHEDULE

BOILER OVERHAUL/ ANNUAL MAINTENANCE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

WATER WALL TUBE LEAKAGE

RESERVE SHUT DOWN / STANDBY UNIT


RESERVE SHUT DOWN / STANDBY UNIT

WATER WALL TUBE LEAKAGE

P.A. FANS PROBLEM

RESERVE SHUT DOWN / STANDBY UNIT

SUPER HEATER TUBE LEAKAGE

WATER WALL TUBE LEAKAGE

RSD/LOW SCHEDULE

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

SWITH YARD RELATED PROBLEMS

RESERVE SHUT DOWN / STANDBY UNIT

LIGNITE SHORTAGE

LIGNITE SHORTAGE

GT-NO SCHEDULE FROM BENIFICIARIES

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

NO Power purchase agreement

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

CONSERVATION OF MAIN FUEL/RSD

CONSERVATION OF MAIN FUEL/RSD

CONSERVATION OF MAIN FUEL/RSD

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

MAIN STEAM LINE PROBLEM

Low system demand/ costly fuel

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE
RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

Fuel Shortage

RESERVE SHUT DOWN / STANDBY UNIT

RSD/LOW SCHEDULE

Fuel Shortage

Fuel Shortage

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

RESERVE SHUT DOWN / STANDBY UNIT

RSD/LOW SCHEDULE

GT-PROTECTION /INTERLOCK /RELAY

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

10/08/2020 ENMASS REFUELLING

TUBE LKG. AT LOW TEMP. SUPERHEATER ZONE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

TURBINE VIBRATIONS HIGH

RSD/LOW SCHEDULE
GENERATOR PROTECTION RELAY OPERATION
PROBLEM
CONSERVATION OF MAIN FUEL/RSD

CONSERVATION OF MAIN FUEL/RSD

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RESERVE SHUT DOWN / STANDBY UNIT

RSD/LOW SCHEDULE

TUBE LKG. AT LOW TEMP. SUPERHEATER ZONE

RSD/LOW SCHEDULE

BOILER INSPECTION/ RE-CERTIFICATION

RSD/LOW SCHEDULE

TURBINE OIL SYSTEM PROBLEM

WATER WALL TUBE LEAKAGE

RESERVE SHUT DOWN / STANDBY UNIT


WATER WALL TUBE LEAKAGE

WATER WALL TUBE LEAKAGE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

31/07/2020 TURBINE MISC. PROBLEM

ELECTRICAL MISCELLANEOUS PROBLEMS

ELECTRICAL MISCELLANEOUS PROBLEMS

COAL SHORTAGE

RSD/LOW SCHEDULE

ESP PROBLEM

WATER WALL TUBE LEAKAGE

BOILER AUX. MISC. PROMLEMS

WATER WALL TUBE LEAKAGE

GEN. TRANSFORMER TRIPPING/ DAMAGED

RESERVE SHUT DOWN / STANDBY UNIT

CONDENSER TUBE LEAKAGE/ CLEANING

TURBINE VIBRATIONS HIGH

WATER WALL TUBE LEAKAGE

RSD/LOW SCHEDULE

MISC. SHORT DURATION PLANNED MAINTENACE

RESERVE SHUT DOWN / STANDBY UNIT

SCHEDULED ANNUAL MAINTENANCE

BOILER OVERHAUL/ ANNUAL MAINTENANCE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

ABNORMAL BOILER OPERATIONAL PARAMETER

SCHEDULED ANNUAL MAINTENANCE

Fuel Shortage

RESERVE SHUT DOWN / STANDBY UNIT

CONSERVATION OF MAIN FUEL/RSD

Fuel Shortage

Fuel Shortage

GENERATOR BEARING PROBLEM

GT-GEN./FIELD BREAKER PROBLEM

Fuel Shortage
Fuel Shortage

SCHEDULED ANNUAL MAINTENANCE

ELECTRICAL MISCELLANEOUS PROBLEMS

RSD/LOW SCHEDULE

RSD/LOW SCHEDULE

ELECTRICAL MISCELLANEOUS PROBLEMS

A.V.R. PROBLEM

WATER WALL TUBE LEAKAGE

WATER WALL TUBE LEAKAGE

Low system demand/ costly fuel

Low system demand/ costly fuel

E.S.P.MISCELLANEOUS

ASH HANDLING SYSTEM PROBLEM

Low system demand/ costly fuel

ELECTRICAL MISCELLANEOUS PROBLEMS

RESERVE SHUT DOWN / STANDBY UNIT

ASH HANDLING SYSTEM PROBLEM

WATER WALL TUBE LEAKAGE

I.D. FANS PROBLEM

23/09/2020 ELECTRICAL MISCELLANEOUS PROBLEMS

GENERATOR MISCLLANEOUS MAINTENANCE

NON AVAILABILITY OF MAN POWER

Fuel Shortage

MINOR MAINTENANCE WORKS