Professional Documents
Culture Documents
VALVE ON RISER
DROP OUT OF TEE H.W.
STRAINER STR.
FLOW IN DIRECTION OF ARROW T.W.
"P" TRAP
3. ALL 4" AND LARGER SANITARY PIPING SHALL PITCH AT A MINIMUM OF 1/8" PER FOOT. ALL SANITARY PIPING
SMALLER THAN 4" SHALL PITCH AT A MINIMUM OF 1/4".
Seal
4. ALL NATURAL GAS DROPS SHALL BE EQUIPPED WITH A DRIP LEG WITH A CAPPED END FOR DIRT & MOISTURE
FLOOR DRAIN F.D. COLLECTION.
5. ALL PLUMBING PIPING SHALL BE RUN TIGHT TO STEEL TRUSSES AND RACKED ALONG STEEL AND WALLS WITH A
STANDARD PIPE HANGING / RACKING SYSTEM. PIPING SHALL BE RUN CLEAR OF ALL DOORS AND WINDOWS.
6. THESE DRAWINGS ARE A SCHEMATIC PIPING DIAGRAM; ALL PIPING RUNS SHOWN MUST BE CAREFULLY
ROOF DRAIN R.D. DETERMINED BY THIS CONTRACTOR. THE CEILING CONSTRUCTION IS VERY CONGESTED. THIS CONTRACTOR
SHALL VIEW THE DRAWINGS OF ALL TRADES & PROVIDE ALL OFFSETS NECESSARY TO FACILITATE PIPING RUNS
TO ALL FIXTURES AND EQUIPMENT. THIS CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER
CONTRACTORS TO FACILITATE THE INSTALLATION OF ALL PIPING, HANGERS, ETC. Revisions
No. Description Date
NEW CONNECTION 7. THE P.C. IS RESPONSIBLE, AT HIS OWN EXPENSE, TO REPAIR ANY SERVICES OR DAMAGES CAUSED BY HIS
WORK.
1-
80
0-
Not For Construction
24
2-
17
Plumbing Legend Notes &
76
Abbreviations
CALL BEFORE YOU DIG
PENNSYLVANIA ONE CALL SYSTEM, INC. Scale 1/8" = 1'-0"
1-800-242-1776
PA ACT 287 (1974) REQUIRES THREE WORKING Date NOVEMBER 21, 2012
DAYS NOTICE TO UTILITIES BEFORE YOU
EXCAVATE, DRILL OR BLAST BCJ Project Number 11209
P0.01
11/19/2012 4:19:22 PM