Abstract – Arcing due to an internal arc fault test is 2. TESTS AT INTERNAL FAULT
carrying out in order to demonstrate the capability of
the metal-enclosed switchgear to withstand to stresses 2.1 Test conditions
generate by electric arc.
Firstly, it is aimed the limitation of the destructive The tests at internal fault are carrying out on metal –
effects of the enclosures and protection of the persons
near the metal-enclosed switchgear.
enclosed switchgears in similar conditions as in
The behaviour of the metal-enclosed switchgear during exploitation. As stipulated in IEC 62271-200/2003
the test is pointed out by video recordings, which lead to standard and technical specification EDF-HN64S52,
the evaluation of the test result together with the for metal – enclosed switchgears the test shall be
observations stated after test on metal-enclosed carried out on at least two representative cells which
switchgear and indicators also. form an assembly.
The paper presents two alternative methods for The test can be carried out on an assembly not
verification at electric arc action of metal-enclosed previously subjected to arcing, or, if subjected, being
switchgears according to international standards. in a condition which keep the initial parameters and
does not affect the result of the test.
1. INTRODUCTION In case of different types of devices that could equip
the cell the largest device will be fit in. At the test, the
Stress regimes above normal limits such as cells shall be fully equipped.
overheating and overvoltage can often occur during Installation and mounting conditions have to be
the functioning of metal – enclosed switchgears. correctly simulated. The minimum clearance
These regimes conduct to a lowering of the insulation distances in mounting instructions have also to be
resistance of the main circuit components. These met, e.g. distance against wall and ceiling, limitation
effects being cumulative in time, flashovers and due to covers position and so on.
breakdowns, which evolve in local or general electric For the purpose of this test special rooms are used.
arcing, can occur even for normal stresses [1]. They are composed of two perpendiculars to each
The electric arc occurring develops an energy which other walls and a ceiling with variable dimensions
in first moments creates an overpressure that stresses that can be used for different kinds of cells. The low
the metal – enclosed switchgears structure strength pressure spaces from outside the cells are also
[1]. simulated as stated in utilization instructions (e.g.
For strength structure at limit designed, enclosures cable ducts and other close units).
deformations and even tearing of covers, doors, In front of accessible parts of the cell, vertical and
inspection windows, ventilation openings, etc can horizontal indicators (human simulators) are used at a
occur, sometimes with throwing of these out and distance of 30 cm for accessibility type A and 10 cm
flames emissions [1]. for accessibility type B [2].
Such behaviour, beside the material damages, can Vertical indicators have a 2 m height from the floor
lead to operative personnel injuries that are near and the horizontal ones are placed at a distance of 2
metal – enclosed switchgears. m from floor and 0.1 – 0.8 m around the cell [2].
In order to limit the destructive effects, a lot of Both indicators consist of 15 cm square frames made
measures are taken starting with the designing phase, of textile material with a specific weight of 150 g/m2
so the metal – enclosed switchgears should resist at for type A and 40 g/m2 for type B [2]. The
arcing due to an internal fault. accessibility type is A or B depending of the cells are
The proof that the metal – enclosed switchgears fulfil restricted to authorized personnel only or with
these conditions is checked by laboratory tests. unrestricted accessibility, including that of the
In this sense, in the paper are presented alternative general public.Example of room simulation with the
methods for checking at electric arc on medium placement of functional unit and indicators
voltage metal – enclosed switchgear with compact positioning are presented in Figure 1.
RMU [2,3].
2.2 Alternative methods for performing internal phase scheme at 12.5kArms current with a 5%
internal arc test tolerance, according to technical specification EDF-
HN64S52 [3], the test circuit power factor being not
Tests at internal arc of metal – enclosed switchgears higher than 0.15.
with compact RMU are applied two alternative The test voltage is equal or lower to rated voltage of
methods according to international standards: IEC the switchgear, according to reccomendations of
62271-200/2003 [2] and technical specification EDF- international standards [2,3].
HN64S52 [3]:
• Arc initiation inside of tank by switching 2.2.2. Arc initiation inside of tank by fuse wire
failure inside
• Arc initiation inside of tank by fuse wire
inside 2.2.2.1. Test procedure
2.2.1. Arc initiation inside of tank by switching The arc shall be generally initiated between all phases
failure by means of a metal wire of about 0.5 mm in
diameter.
2.2.1.1. Test procedure
The point of initiation, the numbers of tests and the
The enclosure is filled with low pressure SF6 gas or arc supply direction have to assure a maximum stress
with atmospheric pressure air in order to have an of the cell. In case of segregated phase conductors,
lower dielectric medium. The electric arc initiated by the arc shall be initiated between one phase and earth.
failure switching which is found in a lower dielectric The test shall be carried out three phase with a 50 Hz
medium. The procedure is the following: the switch frequency, the test circuit power factor being not
in closed position is passed by inductive load current, higher than 0.15.
adjusted with inductances and resistors (Figure 2) at The applied voltage of the test circuit should be equal
equal or greater value of rated current, with power to the rated voltage of the metal-enclosed switchgear.
factor 0.1. The arc is initiated by breaking of the A lower voltage may be chosen if the following
switch in the moment when the voltage is applied at conditions are met: the arcing current is practically
switchgear terminals. sinusoidal and the arc is not extinguished.
If the dielectric medium is not so lower to initiate the The prospective short-circuit current shall be equal or
electric arc, then the speed of the switchgear is higher than the thermal rated current (1 s) with a
+
reduced, with an agreement between manufacturer 0 5%
tolerance and the prospective value of the peak
and customer. The homopolar current is limited to current (flowing in one of outer phases) shall be
1000 Arms through a resistance coonected on supply 2.5 times the r.m.s. value of the a.c. component with a
neutral earthing. The test are performed in three- 5% tolerance.
Table 1
Parameters/Circuit tests Test methods
By switching failure With fuse wire inside
Test circuit Three-phase with inductive Three-phase without inductive
charging, according to charging, according to
EDF-HN64S52 IEC 62271-200
Applied voltage Equal or lower to rated voltage Equal or lower to rated voltage
Test current IT = 12.5 kArms, +0 5% tolerance IT ≤ 40 kArms, +0 5% tolerance
+
Ipeak = 2.5 * IT, 0 5% tolerance Ipeak = 2.5 * IT, +0 5% tolerance
Charge inductive current Equal or higher to operating rated -
current
Test duration 0.7 s 0.1 or 0.5 s or 1 s
Acceptance criteria According to IEC 62271-200, According to IEC 62271-200,
Annex A6 Annex A6
The test parameters during the internal test were: The diaphragms for pressure relief located at rear of
Ip = 31.25 kA, Ik=12.5 kA, tk = 0.7 s and 12.2 kV the RMU opened.
three-phase applied voltage on input terminals of All acceptance criteria were fulfilled.
RMU. During the test, oscillograms are recorded showing
For the test the RMU was settled on a cable channel the currents on all phases (IR, IS, IT), voltages drop on
with lateral right side open and placed in a special arc (DURS, DUST, DUTR) and test duration (Figure 3).
room with two perpendicular walls and ceiling. Test results are presented in a Test Report [4].
The combined vertical and horizontal indicators were
mounted in front of the RMU at 300 mm
corresponding to accessibility class A.
20000A
CH5
-20000A
20000A
CH3
-20000A
20000A
CH4
-20000A
800A
CH9
-800A
615V
215V
-185V CH6
-585V
2.20s 2.30s 2.40s 2.50s 2.60s 2.70s 2.80s 2.90s
616V
216V
-184V CH7
-584V
2.20s 2.30s 2.40s 2.50s 2.60s 2.70s 2.80s 2.90s
573V
173V CH8
-227V