Bulk Tank Unloading Checklist

Date: _________________________ Product: ______________________


Batch Number:__________________ Tank Number: _________________
Start Time: ___:___ Stop Time: ___:___

TOTAL GALLONS: ________________________


Initials of BPT
1) All Appropriate PPE Worn

2) Notify Personnel That a Tanker is Being Offload/ State Product

3) All Paperwork Received


a) BOL
b) Certificate of Analysis
c) Verify offloading to correct tank with correct type of chemical

4) Equipment Inspected

5) Verify Movement of Tanker is Prevented & Tanker is Grounded

6) Sample Obtained and Inspected


a) Clarity
b) Free of foreign matter
c) Specific gravity
d) Properly labeled

7) Hoses and Valves Double Verified Before Off Load

8) 3 Points of Contact Maintained/Lanyards Utilized

9) Over/Under Pressure Prevented

10) Tank Level Monitored Throughout Load

11) Notify Personnel – Tanker Complete

12) All Tanker Paperwork Filled Out


a) Office - Original
b) Bulk Plant - Copy
Additional Notes:

Bulk Plant Technician Signature: _______________________________ Date: __________

2nd Plant Technician Signature: _______________________________ Date: __________