Professional Documents
Culture Documents
+4.36 m
5.36 m
+0.915 m
A
–1.83 m
B
–4.57 m
C 283.7 kN/m2
–7.47 m
D 16.07 m
Peck’s pressure
envelope
–10.37 m
E
Actual pressure envelope
–13.57 m
F
Bottom of cut
–17.07 m
Now, using Eq. (19.8), we can convert the sand layer located between elevations
14.36 m and 10.305 and the equivalent clay layer of 17.375 m to one equivalent
clay layer with a thickness of 21.43 m:
1
cav 5 [g K H 2 tan f9s 1 sH 2 Hsdn9qu]
2H s s s
3 4
1
5 [s17.29ds1ds4.055d2 tan 301s17.375ds0.75ds2351.24d] <34.99 kN/m2
s2ds21.43d
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.