You are on page 1of 14
sree ber Sonng Soe Nes Co Esato eforametn Nec ann EicivilRead Home Structure Tech Notes BBS Musthavebooks JOBS [FORUM] Contact Us | [ ## Home> STRUCTURE > Bar Bending Schedule for Neck Column | Estimation of Steel reinforcement in Neck Column. Bar Bending Schedule for Neck Column | Estimation of Steel ee reinforcement in Neck Column & Krishna 3 August 29,2017 @ 9 Comments Bar Bending Schedule for Neck Column / Estimation of Steel reinforcement in Neck Column:- | NEED HELP WITH. Bar Bending schedule plays a very important role in estimating quantities of steel reinforcement required for the building. Before getting into Bar bending wK schedule for Neck Column, | refer you to learn the Bas Quantity Survey how to Calculate Bar Bending Schedule (basics) and how to adopt Concrete Cover for Steel htpsscvlread.com/bar-bending-schedule-neck-calumnd 4 sr21r2020 Bar Bending Schedule or Neck Column | Estimation of Stee! reinforcement in Neck Column Contents [show] Neck column: The part of the column which is present in sub structure is called neck column. (Column in substructure) Well, the reason for this dividing column into two parts is to make ease in understanding the Bar Bending schedule clearly. QUANTITY OF REINFORCEMENT (STEEL) REQUIRED FOR NECK COLUMN OR Bar Bending Schedule for Neck Column :- In this post, | am finding out the Estimation of Steel reinforcement in Neck Column/ Bar Bending Schedule for Neck column. For this, | considered a plan as shown below. @ Columns ote = To C1 c2 c3 i Os lca cs cé Le= Lb = c7 cs cg leck Col EY htpsscvlread.comibar-bending-schedule-neck-calumnd ana 212020 Bar Bending Schedule for Neck Column | Estimation of Ste! reinforcement in Neck Column Steps to be followed while finding out the total wt. of steel required for constructing Neck columns: Neck column reinforcement calculation is divided into two parts Main bars and stirrups. Part-I:- Main Bars 1. Check the Length of Main bars 2. Add the overlap length and bend length to the neck column. 3. Adopt Dia of Main Bars 4, Calculate the total length of main bar. 5. Find the total wt of Main bars. Part-ll:- Stirrups 1. Deduce the concrete cover from all sides of tie/stirrups and find out the length of stirrup. 2. Adopt Dia of Stirrup. 3, Calculate the length of stirrup including hook. 4. Then Find out the total no. of stirrups. 5, Find the total length of stirrups 6. Lastly, Calculate the total wt. of stirrups. Length, Dia and No. of Bars are adopted and designed by the structural engineer by executing the load analysis. To make it clear | included almost all types of columns. Well C1, C3, C4, C6, C9 (Square Columns) are similar and C2, C8 (T-Column) C5 is Circular Column, C7 is L Type column. You can also refer different types of columns. Assume for calculation:- Dia of Main Bars = 16mm, Dia of Stirrups= 8mm, Spacing between stirrups = 0.1m. htpsscvlread.comibar-bending-schedule-neck-calumnd ana sr21r2020 Bar Bending Schedule or Neck Column | Estimation of Stee! reinforcement in Neck Column Length of Main bar excluding extra bars is 2.25m, Diameter of Circular column C5 = 0.6 No. of Main Bars = 4 in Square column, No. of Main Bars = 8 in Circular & L Type Column No. of Main Bars = 10 in T Type Column Column Details:- C1, C3,C4, C6, C9 is Square Column (0.4mx 0.4m) C5 Circular Column (Radius 0.3m) C2, C8 T-Type Column C7 L-Type Column 04 06 = 06 ptrees ey CALCULATION FOR THE QUANTITY OF NECK COLUMNS (MAIN BARS): C1, C3,C4, C6, C9 is Square Column (0.4mx 0.4m): {I pears E et — a0 $00 [et asin bas sureye, | [] Length - 85.500 htpsscvread.com/bar-bending-schedule-neck-calumnd ana 912112020 Bar Bending Schedule fr Neck Column | Estimation of Stee! reinforcement in Neck Column Length of Main Bar = L + 50D+16D 1180 fs the length of bar which stied withthe footing reinforcement {500 is the length of bar which is provided on the ground level for further extension of bars in Super Structure. 1 LenghhofMainBer— =L+S0+160 =225+ 500018 +10x0018 =3306m 2 Total No ofa =A 3. Teal Length on Bars = 4x3:08 =13 224 i 4. Weight of Steel bar in = t00 Kgsim For 38 150 (For 16mm) =te2 ~ ikgsim 5. Total Weightof Steel = 158x 13.224 =2089Kgs C5 Circular Column:- 1. LenghotManger — =L+50D+100 25+ 50 x 0.016 +16 x0.016 06m 2. Total No. of Bars 5. Total Length of Main Bars = 83.308 =26 448m p 4, Weiantor Stel barin. = <2 Kasim Fort © 10 (For 16mm) i = 158kgam 5, Tolal Weightof Steet = 15826 448 = 41,78Kos Well, L Type Column (C7) has same No. of Main Bars as circular column C5, total wt of steel required for L type columns are 41.78 Kgs. C2, C8 T-Type Column: read comibar-bending-schedule-neck-calumnd ona 612112020 Bar Bending Schedule for Neck Column | Estimation of See! reinforcement in Neck Column 16D isthe length ofbar which istied withthe footing reinforcement ‘50D is the length of bar which is provided on the groundlevel for further extension of bars in Super Structure, 1. LengthofMainBar = = L+0D+160 = 225+ 60x0.016 +16 x0016 =3.306m 2. Total No.of Bars 10 3. Total Length of Main Bars = 10x 3:306=33.30m 4. Weigtorsteelberin = 2 kgm fightorSteelbarin = 22 For 16m 26 =: 5a90m (or 16mm) =p 71280 5 Total WeightofSteel = 1.583930 = 5264Kqs re a ce ae Cora oH i oluma-t | 16mm} 3.306 + 13228 | 158. 2089 Golumn-2 | 16mm | 3.306 10 33068 | 158 5264 Columns | 16mm | 3.306 4 13228 | 158 2088 Columns | ismm | 3308 | + 3208 | 158 2080) Columns | 16mm | 3.306 8 2eae | 158 4178 Golumn-s | 16mm | 3.306 4 13226 | 158 20.89 Column-7 | tem | 3308 a 2e4ae | 138 4178 Columns | ismm | 3.306 10 3a08 | 158 S264 Columns | 16mm | 3.306 4 13228 | 158 20.80 Total | 29329 CALCULATION FOR THE QUANTITY OF NECK COLUMNS (STIRRUPS):- C1, €3,C4, C6, C9 is Square Column (0.4mx 0.4m) First of all deduct the concrete cover from all the sides of column for finding out the length of stirrup. As per the condition deduct the concrete cover of 0.05 from all sides of stirrups in square column htpsscvlread.comibar-bending-schedule-neck-calumnd ena sr21r2020 Bar Bending Schedule or Neck Column | Estimation of Stee! reinforcement in Neck Column Hook Length £0 vo w of Square Column +90+9D 340.340,340,3+0x0.08+9%0.08 344m 1. Length of Each stimup with hook Neck Column Length 2. No of Stirups = Meskoumet a =235~24 bars 3. Total lenath of Stirups = 241.344 32.256 ‘st 4, Weightof Sel arin = 555 Kast e (For rn) = yep 7 0:39ko8Im 5 Total weightofsteel = 039x 32.56 Fequiredtorstimups = 12.69 Kgs C5 Circular Column (Diameter 0.6m):- First of all deduct the concrete cover from all the sides of column for finding out the length of stirrup. As per the condition deduct the concrete cover of 0.1 from all sides of stirrups in square column. htpsscvlread.comibar-bending-schedule-neck-calumnd m4 sr21r2020 Bar Bending Schedule or Neck Column | Estimation of Stee! reinforcement in Neck Column Hook Length is ‘added in length of bia 0.6m . + he Top View of Circular Colum 4. Lengh of Each strup with hook =L+ 90 + 9D L =2n=2x3.14x02 256m 2. No. of Stirrups ek Coban Length 4 Toll lenghh of Sbrups > 4. Welonter steel barin = 22 koe (Form) 5, Total weight stet 29x30144 requiredforstimps = 11.79 Kgs €2,C8 T-Type Column : = 015 MC m a ke htpstcvread com jar-bending-schedule-reck-columny ana sr21r2020 Bar Bending Schedule or Neck Column | Estimation of Stee! reinforcement in Neck Column arts Part I =[L +90 + 9D] ={L+90+90] 15+0.45+0.15+0.45 +18 x0 008] + [0.550 15+0 55+0.15+16 x0 008) 21.344 + 1.544 =2.88 Neck Column Length Spesing 1. Length of Each stirup with hook 2. No.of Stimups 3. Total length of Stimups ve 4. WeightofSteelbarin = 77> Kgsim (For 8mm) sep 7 0.29Kgsim 30x6012 6.95 Kas 5. Total weight of steet required for stirups C7 L-Type column: - .ad.comfbar-bending-schedule-neck-columnl ona 912112020 Bar Bending Schedule fr Neck Column | Estimation of See! reinforcement in Neck Column 4. Length of Each stimup with hook = Part-l+ Part [L + 9D + 9D} s{L+90+90] += [0.55+0.18+0.18+0.55 +18 x0.008] + 0:55+0.15+0.55+0.15+18 x0.008] = 1504 + 1.544 =3.088 2 No.of Sirups = 2844 =235~24 bars 3. Total length of Stimups 3.088 ttm ve 4, Weightof Steel barin = 77> Kg: (For enn) 5. Total weight of steet required for srups a) a a CC ae ce Sn) ct oh i Column-t | amm | 1.348 ey 3225 | 039 1268 Golumn-2 | anm | 286 24 oa12 | 039 | 2095, ‘Column-3 | —smm | 1364 cr m5 | a9 i260 Cotumn-t | amm | 1344 2 3225 | 039 1260 Goluma-5 | amm | 1256 2 3014 | 039 1175 Columns | amm | 1368 m 3025 | 039 1200 Golumn-7 | amm | 3086 a vai | 039 | 2890. Columns | amm | 288 24 esta | 039 | 2095 Columns | smn | 1348 24 3225 | asa 12.68 Total | 468.00 ABSTRACT FOR FINDING OUT THE TOTAL QUANTITY OF STEEL REINFORCEMENT REQUIRED FOR NECK COLUMN FOR THE ABOVE GIVEN PLAN:- ae 8mm 158.00 S.No. |DiaofBar | Total Wtin Kgs 2 16mm 293 29 LIKE US ON FACEBOOK Bar Bending Schedule for Footings Bar Bending Schedule for Tie Beams / Strap Beams htpsscvlread.comibar-bending-schedule-neck-calumnd roa 212020 Bar Bending Schedule for Neck Column | Estimation of Ste! reinforcement in Neck Column Don’t Forget to Share With your friends! Sharing is Carin: For Instant updates Join our Whatsapp Broadcast. Save our Whatsapp contact +919700078271 as read and Send us a message “JOIN” Never Miss an update Click on “Allow US” and make us allow or Click on Red notification bell at bottom right and allow notifications. Stay tuned! More are updated Soon!!. Civil Read Wishes you ALL the BEST for your future, RELATED POSTS NOMINAL COVER, 14 IMPORTANT CLEAR COVER AND BUILDING EFFECTIVE COVER Krishna December 25,2019 IMPORTANT THUMB RULES USED IN CONSTRUCTION BY CIVIL ENGINEERS Krishna December 14,2018 ABOUT THE AUTHOR Admin. MATERIALS USED. IN CONSTRUCTION Krishna February 29, 2020 DIFFERENT GRADES OF CEMENT AND ITS IMPORTANCE Krishna March 6, 2020 Founder & Admin of civilread.com, | am a civil engineer working in Ultratech Cement Ltd, With a good subject knowledge in civil engg i have started this blog to share htpsscvlread.comibar-bending-schedule-neck-calumnd nna s2n2020 Bar Bending Schedule for Neck Column | Estimation of Stel enforcement a Neck Column valuable information to fellow civil engineers. You can also follow me on fb and twitter by clicking below Tags: Bar Bending Schedule, Estimation, reinforcement 9 COMMENTS HARISH | September 14, 2017 Reply please join me your what's app group for future updates 9843600933 krishna Author ‘September 20, 2017 Reply send us a message to 970078271 as JOIN in whatsapp we try t add u as soon as possible sambhav jain | July 8,2018 Reply please help me for given a format of bar bending schedule pf footing and column as soon as possible. Vivek kumar | August 20,2018 Reply Thank you. It was so easy to understand. Krishna Author | August 23,2018 Reply Cheers! i made u to understand! htpsscvlread.comibar-bending-schedule-neck-calumnd rane 912112020 Bar Bending Schedule fr Neck Column | Estimation of Stee! reinforcement in Neck Column ADAGIRI CHANDULKAR | September 29, 2018 Reply thanku so much we have getting more doubts clarification in this calculation. thanku so much bro Me Arshadullah | November 4,2018 Reply Thanks sirg} 3 eb Nima | November 12, 2019 Reply Thank you so much. Very informative to civil engineers sonal | March 3,2020 Reply thanku so much we have getting more doubts clarification in this calculation. ADD A COMMENT ‘Comment Text htpsscvlread.comibar-bending-schedule-neck-calumnd sana 12112020 Bar Bending Schedule fr Neck Column | Estimation of See! reinforcement in Neck Column Name* Email* Post COMMENT Top Guides We are Social ECivilRead Forum -Q& A > Bar Bending Schedule # @ in ct tnemvsfonm ll about Conrete . Ss > AllAbout Cement Eo Write for us > Quality Tests on Site > Different Types @ Write Post > AutoCAD © CIVIL READ Copyright © 2020 Home Termsof Service Privacy Policy AboutUs Contact Us. Followus Must have books htpsscvread.com/bar-bending-schedule-neck-calumnd vane

You might also like