Contents
1 Scope.............................................................. 2
2 Purpose........................................................... 2
3 Conflicts and Deviations................................. 2
4 Applicable Documents.................................... 3
5 Definitions and Acronyms............................... 4
6 Instructions......................................................7
7 Responsibilities............................................. 12
Revision Summary............................................... 16
1 Scope
1.1 This Saudi Aramco Engineering Procedure (SAEP) defines the requirements for
electrical inspection in Saudi Aramco operating facilities.
1.2 Applies to all permanent or temporary facilities within Saudi Aramco including
Industrial Plants, Commercial Buildings, Public Buildings, Residential
Buildings and facilities in any operating areas.
1.3 Applies for existing Community and Operations Support Facilities owned by
Saudi Aramco.
1.4 Electrical equipment owned and operated by Contractors within Saudi Aramco
Operating Units shall be tested and inspected in accordance with this procedure.
Exclusions:
2 Purpose
2.1 Electrical equipment are in good physical and functional condition and comply
with all the requirements of this procedure for external and internal condition as
required.
2.5 Adequate resources are provided for the electrical inspection program.
3.1 Conflict
3.1.1 Any conflicts between this SAEP and other applicable MSAERs shall be
resolved in accordance with SAEP-302.
Saudi Aramco: Company General Use
Page 2 of 47
Document Responsibility: Inspection Engineering Standards Committee SAEP-378
Issue Date: 23 July 2016
Next Planned Update: 23 July 2019 Electrical Inspection Requirements
4 Applicable Documents
The requirements contained in the following documents apply to the extent specified in
this procedure.
SAES-P-123 Lighting
Examples of critical loads are: major computer centers, critical care areas in clinics and
hospitals, major office buildings, process units in gas plants and refineries.
Defect Notification (DN): Process used by the electrical inspector or any other
qualified/responsible individual to document findings and request for closure action in
SAIF application.
Inside-Plant: Facilities within the perimeter security fencing installed per the SAES-
O-series of standards.
Low Voltage: Voltages less than 1000 V, unless otherwise designated in a specific
MSAER or referenced international standard.
Outside-Plant: Facilities outside of the perimeter security fencing installed per the
SAES-O-series of standards.
Acronyms
AC Alternating current
A/C Air Conditioning
API American Petroleum Institute
CSD Consulting Services Department
DC Direct current
DN Defect Notification [(Replaces the Inspection Work Sheet (IWS)]
E1L Electrical One Line Diagram
EIS Equipment Inspection Schedule
MSAER Mandatory Saudi Aramco Engineering Requirement
ESO Electrical System Operator
GI General Instruction
GOSP Gas and Oil Separation Plants
JSA Job Safety Analysis
LBE Log Book Entry
MCC Motor Control Center
MOV Motor Operated Valve
NEC National Electrical Code
OIM Operation Instruction Manual
OIU Operation Inspection Unit
OME Operation, Maintenance, and Engineering
POD Power Operation Department
PPE Personal Protective Equipment
PM Preventive Maintenance
PO Purchase Order
PR Purchase Request
QA Quality Assurance
QC Quality Control
RFI Request for Inspection
SAEP Saudi Aramco Engineering Procedure
SAIP Saudi Aramco Inspection Procedure
SAES Saudi Aramco Engineering Standard
SAMSS Saudi Aramco Materials Systems Specifications
SAIF SAP Applications for Inspection of Facilities (in SAP Application)
SBC Saudi Building Code
SMS Safety Management System
SSD Safety and Security Directive
TSU Technical Support Unit
UPS Uninterruptible Power Supply
6 Instructions
6.1 Safety
6.1.1 All safety rules and regulation shall be followed during electrical
inspection. Electrical Inspector shall stop, look, listen and test before
touching any electrical equipment and definitely before opening it.
6.1.2 Proper PPE shall be required for all electrical inspection activities
involving electrical, chemical (e.g., batteries) and arc flash hazards (as
per GI-0002.721) as a minimum personal safety protection.
Safety Note: Inspecting electrical components and systems may risk death by
electrocution as well as serious burns or other injuries to the inspector
or to others. Do not attempt these tasks unless you are properly
trained and equipped.
Arc flash and shock hazard mitigation is one of the major sources of risk at the
Industrial and community areas. To ensure safe operation during the circuit
breakers Rack-in and Rack-out activities, the potential hazard shall be dealt with
as follows:
6.2.3 Energization form Appendix E.1 shall be filled for any new installation
and signed by all responsible parties.
6.3.1 Electrical areas shall be properly classified and reviewed for all
operating plants, projects, plant modifications/expansions and
communities & support facilities, as per SAES-B-068, API RP 505 and
NEC Article 505.
6.3.2 The unclassified electrical devices or machines shall not be used in the
electrical classified areas.
6.3.3 Area classification drawings shall be updated and readily available to the
OIU.
6.4.3 The electrical inspection shall ensure that the contractors are compliant
to the approved design package(s).
6.5.2 Revision and update to the EIS is required following any demolition or
new construction. This includes all Electrical Equipment and Building
in the Industrial and Community Areas.
6.5.3 Equipment under POD shall have an approved EIS and included in SAP.
6.5.5 OIU shall create an inspection plan for each process unit/area in the
SAIF defining the existing uncounted electrical systems listed in
Appendix C (example conduit system, grounding system, cable tray,
etc.) and shall follow the required intervals for each system.
6.5.8 Use Checklist provided in Appendices D.1 to D.14 for Battery Rooms,
UPS & DC systems, Grounding & Lightning Protection, Lighting,
Electrical Manholes/Duct Banks, Motors & Generators, MOVs,
Saudi Aramco: Company General Use
Page 9 of 47
Document Responsibility: Inspection Engineering Standards Committee SAEP-378
Issue Date: 23 July 2016
Next Planned Update: 23 July 2019 Electrical Inspection Requirements
6.6.3 OIU shall verify that the plant implement uniform PM procedures for
similar electrical equipment operating at higher than 240 volts as per
GI-0002.721 (7.1 & 7.2).
6.6.4 OIU shall attend the repair for critical equipment when special certificate
is needed, e.g., Cable splice, Hi pot test, Cable Fault Locater, etc.
6.6.5 POD shall inspect POD related maintenance activities and PM checks.
OIU shall only conduct QA on bi-annual basis.
6.6.6 During and after plant maintenance PM check and repair activities on
critical electrical equipment, OIU shall perform spot checks on monthly
basis to ensure the following inspection requirements are fulfilled:
a- Safety requirements are followed
b- Scope, plan and checklist of the performed activities are approved
and followed
c- Special certificates are maintained for performing the required
activities
d- Tools are calibrated and safe to use
e- MOC is approved, if any change is required
f- Materials/spare parts used for the repair are labeled and listed
g- Only SA approved contractor(s) shall perform that activity
h- A good housekeeping and area/equipment are safe
Above requirements are for spot checks or QA purpose and the extant of
the inspection will be as per Table 1.
6.7 Excavations
6.7.1 Excavation and backfilling shall comply with SAES-P-104 Section 10.
6.7.2 Hand tools shall be utilized in all excavations, if electrical power cables
or services exist. Otherwise, use the excavations form in Appendix E.2
or any internal SMS/OIM approved form as a minimum requirement,
concurred by OIU.
6.8 Fireproofing
6.9.1 Annual survey shall be carried out on underground cable markers and
identifiers of electrical systems in plant and operation support facilities,
as per applicable SAES-P-104 Section 10 requirements.
6.9.2 Indication signs including wooden sign posts and surface markers should
be regularly checked to ensure they are clear and readable.
6.10.1 Tools and testers shall be available in the unit as per Appendix E.3
checklist but are not limited to the list.
6.10.2 All electrical inspection tools, equipment, and testing devices shall be
calibrated according to the manufacturer recommendations OR by an
approved third party testing agency.
Saudi Aramco: Company General Use
Page 11 of 47
Document Responsibility: Inspection Engineering Standards Committee SAEP-378
Issue Date: 23 July 2016
Next Planned Update: 23 July 2019 Electrical Inspection Requirements
6.10.3 Testing devices and tools should be properly stored in a secured location.
6.11.2 List of electrical equipment that do not require any repair until the next
scheduled external inspection shall be reported monthly to the
responsible organization.
6.11.4 OIU shall maintain operation and support facility drawings for
underground cables routing, electrical area classification, and substations
(i.e., one-line diagrams).
7 Responsibilities
7.1.1 Review the monthly/annual reports and assures effective action plans.
7.2.3 Notify the OIU of any electrical work/activities that requires inspection
by using RFI form through SAIF with a minimum of one day (excluding
excavation) notice except in emergencies.
7.2.5 Ensure installed electrical systems are field checked and verified.
7.2.6 Lead DN and LBE status meeting on weekly basis to evaluate closure of
DN and LBE during normal plant operation, otherwise change the status
to shutdown (S/D) item.
7.2.7 Review the DN priority and report its actual status of implementation
and completion.
7.2.9 Ensures list of all defective lights is submitted every six months, to area
maintenance with a copy to OIU.
7.3.1 Provide OIU with monthly PM checks and maintenance schedules for
the critical electrical equipment.
7.3.2 Provide OIU with a list of all Portable Machines under their
responsibility.
7.3.4 Ensure MOC, if applicable, are approved before starting work activities.
7.4.1 Ensure adequate resources are available for Electrical Inspection activities.
7.5.5 Ensure electrical inspector is properly trained in Arc Flash and Shock
Hazard Mitigation program.
7.5.6 Ensure adequate resources, including calibrated equipment and tools, are
available for electrical inspection.
7.6.2 Ensure that all electrical equipment are listed in the SAIF application for
administrating the inspection program.
7.6.3 Follow-up with electrical inspector to ensure Arc Flash and Shock
Hazard Mitigation Inspection is performed and recorded as required by
this SAEP.
7.6.4 Ensure required reports are issued in a timely manner with required
information.
7.6.5 Ensure electrical DN and all observations are cleared, easily identifiable
and supported by drawings and other references.
The area electrical inspector shall be responsible for at least the following activities:
7.7.5 Report any electrical finding to Operation Foreman and Field Supervisor,
issue DN or LBE, ensure that ETC does not lead to a hazardous situation
and update the completion status in SAIF.
7.7.6 Evaluate with Operation Foremen and Field Supervisor if Area Engineer
or TSU involvement is required.
7.7.7 Ensure that craftsmen making high voltage splices or terminations have
current valid certificates per GI-0002.705, prior to commencing work on
cable repairs.
7.7.8 Perform the required spot checks on plant maintenance PM check and
repair activities on the critical electrical equipment as per paragraph 6.6.
7.7.10 Consult with area specialist engineer for any repair that requires material
or design change or any engineering evaluations.
7.8.4 Initiate and ensure the accuracy and completeness of the Electrical EIS.
7.8.5 Attend OME team meeting to review the new design package.
The ESO Supervisor shall provide monthly schedule for critical equipment
7.11.1 Provide technical support as needed to clarify the related standards and
to rectify deficiencies.
7.11.3 Ensure new packages are reviewed by all responsible parties including
OIU.
7.12.2 Provide a focal contact to work with Compliance Unit for fulfilling the
requirement of this SAEP.
7.12.3 Provide Equipment List to OIU for all Substation and Electrical
Equipment under POD custody.
7.12.4 Ensure all equipment are entered in SAP system including Equipment
Schedule List.
7.12.5 Provide support for the high voltage activities as agreed between POD
and Facility Operating Organizations, as per GI-0002.706.
Revision Summary
23 July 2016 Major revision to: addressed received comments, clarified OIU responsibilities and workload of
Inspection Personnel, clarified POD responsibilities, and aligned Arc Flash Hazard Mitigation
requirements with GI.0002.721.
Electrical Inspection
Inspection Process
Perform scheduled
Close Notification in SAIF
inspection
Deficiencies
found? NO
Close DN or LEB
Engineering
Report monthly, quarterly or assistance NO
required?
annually and as per priority
YES
Facility TSU.
NO Consult Svc. Dept.
Correction
Implemented? Issue DN or LBE
YES
Electrical Inspection of
Maintenance and ESO
Activates Check
Informed concerned
workers at site NO Noncompliance found? YES
Report to
Submit to Conduct Meetings Operation/
tracking sheet Maintenance
Foreman
Inspector to Issue
Track for Completion the required
Corrective Action
Proponent
Mainte- ES
Operations Engineering
nance
Division Head
Maintenance
Engineering
Department
Operations
Operations
Supervisor
supervisor
Insp. Field
Inspection
Inspection
Inspector
Electrical
Foreman
Foreman
PDO
Supt
TSU
No. Activity Description
Proponent
Mainte-
Operations Engineering
nance
Division Head
Maintenance
Engineering
Operations
Operations
Supervisor
supervisor
Insp. Field
Inspection
Inspector
Electrical
Foreman
Foreman
POD
Supt
TSU
No. Activity Description
FREQUENCY
NDE Method
Item # Description of Item External inspection Internal Inspection
(Visual, testing devices, etc.)
Interval Scope Interval Scope
FREQUENCY
NDE Method
Item # Description of Item External inspection Internal Inspection
(Visual, testing devices, etc.)
Interval Scope Interval Scope
X-ray check
As per for seal fittings *Visual External and through using
2.1.2 Conduit system Annually 5 years
Checklist D.3 Chico the x-ray check as needed.
Compound
Enclosures and Junction As per As per *Visual External and Internal
2.1.3 Annually 5 Years
boxes Checklist D.4 Checklist D.4A Inspections
*Visual External and by using
Grounding/lightning As per - MultiMate for continuity
2.1.4 Annually N/A N/A
protection systems Checklist D.5 - Clamp on Grounding resistivity
2.1 testing devices for resistance check
As per *Visual External and by using:
2.1.5 Lighting system Annually N/A N/A
Checklist D.6 - Illumination meter
*Visual External and Internal
As per
2.1.6 Manholes/duct banks 5 Years N/A N/A Inspections
Checklist D.7
Duct banks to be checked as needed.
As per
2.1.7 Miscellaneous Items Annually N/A N/A *Visual External and by using
Checklist D.8
As per
2.1.8 Portable Machines Annually N/A N/A *Visual External and by using
Checklist D.13
3. General inspection on Maintenance and ESO activities
*Visual External for checking
Outage and switching As per checklist - Isolation/restoration form readily
3.1.1 Monthly N/A N/A
requirements checks D.15/D.16 available
3.1 - outage form completion
*Visual External for checking
Inspection Requirements Weekly or As per
3.1.2 N/A N/A - To assess maintenance activities
for Maintenance Activities as applicable paragraph 6.6
repairs and PM checks as QA.
Area/location NO.
Def. List of Equipment
Description
found with Deficiencies
A Ventilation sufficient and effective
B Battery cell/bank identified
Verify adequacy of battery support racks, mounting, anchorage,
C
alignment, and grounding.
D Electrolyte level acceptable
E Standard building temperature maintained
F Lighting acceptable
Terminal and connection acceptable (including intercell connector
G
and terminal covers or busbar insulation)
H Personal protective equipment available and properly stored
I Color coding correct
J Door closer – Panic hardware – Door sealant, are in good condition.
K Dry chemical fire extinguisher installed outside the battery room.
L UPS/Battery charger active alarms
M Eyewash, shower is available and functional
N Working space provided
O Drain clean
P Battery case in good condition
Q Warning signs are available
R Audible and visual alarm are installed and functional (if applicable)
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or location Deficiency NO. Comments
1
2
3
4
5
Page 24 of 47
Document Responsibility: Inspection Engineering Standards Committee SAEP-378
Issue Date: 23 July 2016
Next Planned Update: 23 July 2019 Electrical Inspection Requirements
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or location Deficiency NO. Comments
1
2
3
4
5
Notes:
D.1.1 These are the minimum inspection requirements for UPS and DC systems. UPS, battery bank, and DC
system are considered a critical Equipment in the Industrial and non-Industrial Areas.
D.1.2 Use Appendix D.1 as required in Appendix C intervals for DC systems.
D.1.3 Assure functionality of UPS, Battery Banks, and DC Battery Charger and that PM checks are carried out as
planned in the PM Program.
D.1.4 UPS, DC, and Battery banks PM activities shall be conducted by maintenance as per SAEP-350 and the
outcome shall be communicated with OIU.
D.1.5 DC system, UPS system and battery banks shall be checked frequently according to SAEP-378 Appendix C.
D.1.6 Ensure all installations and applications of DC power systems (stationary storage batteries and
rectifiers/chargers), Uninterruptible Power Supply (UPS) systems, and solar photovoltaic systems are
compliant with SAES-P-103 requirements.
D.1.7 Internal Inspection survey shall be conducted every 5 to ensure that UPS components are replaced by the
Maintenance Organization on their replacement PM cycle as per manufacturer recommendations and in
Appendix D.1A for that particular UPS model as minimum.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Notes:
D.2.1 These are the minimum inspection requirements for cables and cable tray systems.
D.2.2 As minimum, inspection requirement shall include cable and cable tray system.
D.2.3 Annual survey shall be conducted for cable, wires, cable tray system, report any defects.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
Notes:
D.4A.1 As minimum, inspection requirement for junction boxes, enclosures and control panels.
D.4A.2 Internal Inspection survey shall be conducted every 5 years for Junction boxes and enclosures.
Report any defects and issue the required actions for track and repair.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
Notes:
D.5.1 Use this checklist as a minimum requirement with local modification to include any plant specific grounding
and lightning protection systems.
D.5.2 Conduct an annual survey and maintain records of all plant and operation support facilities grounding and
lightning protection systems under the OIU responsibility.
D.5.3 Ensure the grounding connections bonding are secure and functional for all electrical equipment.
D.5.4 Check that grounding wells, grounding rods and grounding grids are well connected, not corroded and in
good condition.
D.5.5 Perform Ohm grounding resistance test for new connections, repairs and for suspected areas to confirm
that the grounding resistivity met with the requirements of SAES-P-111 and NEC-250 requirements.
D.5.6 Immediately report any defects, loss of connections or any other deficiencies involving grounding and
lightning protection systems to the plant foreman and inspection field supervisor.
D.5.7 Convey the observation through DN as priority one with request for immediate action to address the safety
issue related to grounding.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Notes:
D.6.1 Annual survey shall be carried out on all plant and operation support facilities lighting including but not
limited to plant lights, floodlights and SSD lights to check their illumination levels and condition as per
SAES-P-123.
D.6.2 Illumination test survey shall be conducted for all new modifications/new plants to ensure they meet
current SAES-P-123, Table 2, requirements.
D.6.3 Ensure lists of all defected lights are submitted in a timely manner not later than bi-annual, to area
maintenance with a copy to OIU.
D.6.4 Every five years lights illumination survey shall be conducted for plant and operation support facilities lights
under the OIU.
D.6.5 A list of emergency light and lighting supply from essential power source shall be issued to OIU to insure
safe illumination during the black out.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Notes:
D.7.1 Every five years, survey shall be carried out on all electrical manholes and in plant and operation support
facilities to verify the compliance with SAES-P-104 requirements.
D.7.2 Every fifteen years survey shall be carried out on electrical duct banks in plant and operation support
facilities as needed.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Note:
D.9.1 Critical motors and generators shall be itemized and listed in the SAIF application and shall be checked as
required in Appendix C intervals.
Please indicate the deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Note:
D.10.1 Critical MOVs shall be itemized and listed in the SAIF application and shall be checked as required in
Appendix C.
D.11: SUBSTATIONS
Plant NO. Inspection Date
Observation
NO.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
Notes:
D.11.1 External survey shall be performed as per Appendix C for all plant and operation support facilities
substations buildings such as switchgears, MCCs and distribution panel boards, voltage transformers, bus
duct and transformer yards.
D.11.2 Substation’s Equipment under POD, Operation Organization to arrange for repair with the assistance of
OIU and as needed.
D.11.3 Fire alarm and smoke detection systems in substations, switchgears, MCCs and disruption panel areas
shall comply with requirements of SAES-B-014 Section 7 for critical service. Additionally, fire protection
and fire suppression systems shall meet requirements of SAES-B-014 Section 8.
D.11.4 All checks as minimally shall fulfill the requirements in SAES-P-119, SAES-P-121, and SAES-P-111 in
addition to safety standards and NEC.
D.11.5 All substations and switchgear rooms shall be included in the SAIF Application database.
D.11.5 Switchgears, MCCs and disruption panel boards, low and medium voltage transformers and transformer
yards shall be checked for any abnormalities, defects, indication lights, miss-labeling, etc.
D.11.6 All safety signs and precautions are installed properly, in the right locations and readable.
D.12: SWITCHRACKS
Observation
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Note:
D.12.1 Critical switchracks shall be listed in the SAIF application and shall be checked as required in Appendix C.
Please indicate the deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Notes:
D.13.1 Use checklist to inspect all portable machines under the department responsibility such as portable A/C
unit, welding machines, portable floodlights, portable generators, etc., on annual basis.
D.13.2 All electrical portable machines under contractor responsibility shall be inspected before used in Saudi
Aramco Industrial Areas.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. Equip NO. or Location Deficiency NO. Comments
1
2
3
4
5
Note:
D.14.1 All main transformers shall be listed in the SAIF application and shall be checked as required in Appendix C.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. G.I. Reference Number Deficiency NO. Comments
1
2
3
4
5
D.16: SWITCHING-ISOLATION/RESTORATION
Observation
*1Under emergency circumstances Switching Program Form can be waived by Operation/Shift Superintendent or higher
*2During emergency circumstances, only Isolation is allowed with approval of Operation/Shift Superintendent.
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
NO. G.I. Reference Number Deficiency NO. Comments
1
2
3
4
5
Please indicate the observation/deficiency number from the list above or NONE if no deficiencies were found
5. Purpose of Excavation:_____________________________________________________________
6. Fire Protection Notification: Notified Person Name :
_______Date:____Time:_____Phone:_____
7. Security Operations Notification: Notified Person Name :
______Date:____Time:____Phone:______
8. *1-Communications Concurrence
9. *2-Supv. Eng. Specialist or delegate concurrence:
10. *3-Area Maintenance Foreman concurrence:
11. Inspection check and concurrence:-
11.1. Checklist
Comments:_________________________________________________________________________
__________________________________________________________________________________
11.2. Electrical inspector:- Badge Number: _________ Date: ______ Phone: ________
11.3. CIVIL inspector :- Badge Number: _________ Date: ______ Phone: ________
11.4. *4-Inspection. Field Supervisor
12. *5-Unit Foreman Signature
13. *6-Shift Superintendent Concurrences
*2-TSS
*3-Area Maintenance
Foreman
*4-Inspection. Field
Supervisor
*5-Unit Foreman
*6-Shift Superintendent
Illumination meter
Hand tools
Thermography camera*
*Note:
One tool shall be available in the department and can be used for performing the inspection activities.