You are on page 1of 2
$10 Ba| ovr PACE" PARSONS ecroace-_ ge, EAGLE, SAM liSoll HILL: Material Approval (MA) Page 1 of 1 Gales |MAB-VIDA HOTEL& VIDA APARTMENT crc (eee em BH/PLT1/C/02. ones Wiech CBSP-IV/VIDAMACIFFIFP-008. RVs 11/June/2019. | Alawi = Wee sing bred see coves he cei tha eerie mae ozone with ie Catt Docume [DESCRIPTION OF MATERIAL APPROVAL. 4. Material Descipion VALVES & ACCESSORIES, ~ [2 tocation of vse VIOA HOTEL& VIDA APARTMENT. 3._ Manufacturer SHIELD, VALMATIC. 4,_ Local Agent Supplier: NAFFCO, '._ Specification Ret SECTION 211315 6._Estimated Dativery Date 12 = 14 WEEKS. 7, Estimated Date Required a Sie OCTOBER, 2019 8._Enclosures TCatalogue PaTechnical Data_BaTest Reports [Others 9. Sample enclosed with tis submit (Yes / No) NO Other Comments "Contractorto submit one tem ony per transmit D2 Yourinformation ‘A Approved 'B- Approvedas Noted BR Approved as noted, Re 1 Informaton Required _D- Forlnfomation Oniy ae | + ype: "MA Material Approval | OF- other eco ‘Name and signature Baa (Ma Nam fea cae 2 JUN 2019 capes: Employer [] ExgoeesRepeseiave(] Contactor] [Engnaors representatives approvaleorments Peter to He comments sheet unl to fe comments in tee MAC. ‘Crecions oF comments ade ave fo subrials during Ws revew do nat elie the Contactar fom compliance wih he requirements ofthe Drauings and Specicaons. Ths check i nl forevew of general confomance withthe design concept ofthe project and general cmpliaice wih te information gen in Contract Documents. The Contec is responsbe for confming and corelatng al quaiies and dimensions selecting focaton processes an einaues fe constucincooinang Nis wrk ih taf oe ads, and pearing is work na sl nd saistactory manner. Distribution: Employor [_] [Chapter Suomitais znd Transits BSP 2 > ee pace " architecture engineering+ planning Transmittal Notes Page 1 of 1 Transmittal Information Transmittal Subject | VALVES & ACCESSORIES Transmittal Reference | CBSP-JV/VIDA/MAC-FF-FP-008 Transmittal Status Dated 13/06/19, Information Required Comment 1. No objection to propose manufacturer SHIELD for valves & accessories subject to compliance to below given comments. 2. Swing Check valve material shall be Bronze body not ductile iron, contractor shall comply to specification. 3. Alarm Check Valve flange material shall comply to the specification. 4. Contractor shall comply to specification section 211313 page7 point D& E regarding pressure regulating valve and drain valve for Zone control valve. 5. Contractor shall comply to specification section 211313-page 8 point 2.8 regarding to sprin- Klers fittings. 6. OSRY gate valve 2 inch and smaller size shall be threaded ends as per specification 7. Pressure regulating valve shall have minimum 400 psi pressure rating but proposed is 300 psi. Contractor shall comply to specification. Finishing shall be rough chrome plated. 8. Swing check valve 2 inch and smaller shall be threaded ends as per specification. Contractor shall comply to specification section 211313 point 2.5 F&G. 9. Provide calibration certificate for pressure gauge on delivery. 10. Contractor did not attach catalogue and specifi ion compliance sheet for Air Release valve. 11. Contractor to use Butterfly valve only for the sizes 2 % inch and smaller as per specification Refer specification sheet 211313 -2.5. Use gate valve for higher sizes with supervisory switch. 12, OSBY gate valve should be raising stem type. 13. Test and drain valve should be threaded as per specification. 14. Bahrain Civil Defence approval certificate shall be updated. 15. Final approval is subject to civil defence approval. 16. Incorporate the above comments and the comments in the MAC. we cw "23|06ll9

You might also like