Site Requirement for Setting up CNG Station


1. The plot should be with clear and undisputed title for setting up CNG
station.

2. The plot should be around 700 Sq mtrs for LMVs (Taxies / Car, Autos) and
having around 25 mtrs frontage.

3. The plot should be around 1500 Sq mtrs for transport vehicle (Buses /
Trucks / Tempos etc.) and having around 50 mtrs frontage.

4. The plot should be connected to the main road.

5. The plot should be near MGL’s proposed or existing transmission line.

*Note: The form for setting up a CNG station has to be submitted physically along with