1-2015 U-2
(1) The Manufacturer of any vessel or part to be (f) The rules of this Division shall serve as the basis for
marked with the Certification Mark has the responsibility the Inspector to:
of complying with all of the applicable requirements of (1) perform the required duties;
this Division and, through proper certification, of assuring
(2) authorize the application of the Certification
that all work done by others also complies. The vessel
Mark;
Manufacturer or, when applicable, the part Manufacturer
is responsible for the preparation and accuracy of design (3) sign the Certificate of Shop (or Field Assembly)
calculations to show compliance with the rules of this Di- Inspection.
vision, and his signature on the Manufacturer’s Data Re- (g) This Division of Section VIII does not contain rules
port Form shall be considered as certification that this to cover all details of design and construction. Where
has been done. The vessel or part Manufacturer shall have complete details are not given, it is intended that the Man-
available for the Inspector’s review the applicable design ufacturer, subject to the acceptance of the Inspector, shall
calculations. See 10-5 and 10-15(d). provide details of design and construction which will be
as safe as those provided by the rules of this Division.
(2) Some types of work, such as forming, nondestruc-
tive examination, and heat treating, may be performed by (h) Field assembly of vessels constructed to this Divi-
others (for welding, see UW-26 and UW-31). It is the ves- sion may be performed as follows.
sel or part Manufacturer’s responsibility to ensure that all (1) The Manufacturer of the vessel completes the
work so performed complies with all the applicable re- vessel in the field, completes the Form U-1 or U-1A Man-
quirements of this Division. After ensuring Code ufacturer’s Data Report, and stamps the vessel.