You are on page 1of 11
Document Transmittal Sheet (DTS) zz PB Power LUCY SWITCHGEAR FZE Bz a $22. P O BOX No. 17336, JEBEL ALI, DUBAI - UAE 8" Floor, Bin Ghanem Tower Hamdan Street Tel: 04-8129999 Fax: 04-8129900 P 0 Box 47445 Abu Dhabi Tel. 02-8786060 Fax: 02-6779772 DOCUMENT TRANSMITTAL SHEET No. 0061 Document Distribution: CAA ADD, ASSETS Abu Dhabi [1 Copy [ }?8 DisTaIsuTiON] EJDA ADDC.NMD.Abu Dhabi Office [1 Copy 18 JAN 2012 | EXPA PB POWER Abu Dhabi Office [211 Original + 1 Copy + 10D [ACTION iweo aE} CPS PB POWER Site Office 1 copy | [Qo AY el Contractor's. Reference: D-8579/0061 Date: 18/01/12 ADDC CONTRACT D 8579 LIRA FOR AUTOMATION OF DISTRIBUTION SUBSTATION IN ABU DHABI CENTRAL REGION (LUCY MAKE ) The following Documents are enclosed For information only © For approval CApproved Documents Das Bult NO CSD No. ‘STATUS T al E TITLE AND DETAILS Dees Rov_[ AP AEN WR DATE | RET 1. | Typical 10 list for Lucy TRM &| LS/7900/LI083 | 0 a af] | oR Im ‘AP Approved AEN Approved excopi as noted NA- Nat Approved RET ihe document has been returned Comments : CONTRACTOR ‘ABU DHAE P The original document with original DTS duly signed at ce: % Senior Protection Engineer (SPS) ye Teepone:+971 2416 ot, as #972642 603 |PO Box 219, Abu hai Une rates mad ae Z have and CONTRACT No, 0-8579 AUTOMATION OF DISTRIBUTION SUBSTATION IN PO owe ae ab basen ceNTRaL AEGON oCY Mane) Rouchead td rae Eriates DRAWING / DOCUMENT COMMENT SHEET No.0061 To + LUCY SWITCHGEAR FaxNo: 026202797 tn: Project Manager Copy ADDC — Network Management Division Fax No: 02 4457943 Projet Manager DTS No, 0061 Comment Sheet Ret. : 08-0061 Submission Date 18 January 2012 Date + 22 January 2012 Receipt Date 18 January 2012 Page toft Titles / Details: ‘CSD No. Rev. | Status | Comment 1.0 | Typical IO list for Lucy TRM & QRM_ LS 7900/L/053 AEN | See below Status AP= Approved AEN Approved Except as Noted NA= Not Approved NR Approval Notrequied RET =. ifthe document has been returned ‘Comments: 1.0 Typical 10 list for Lucy TAM & QAM 1.1 General Comment 1: The DO1& DO2 for Dummy Relay OFF & Dummy Relay ON respectively are connected to TB2 of module connector. Please correct- See the red mark-up in the document 1.2 General Comment 2: Please clarify the purpose of provision 1, 2, 3 under column “Checks”. Is it indicates the check during the SAT by 1- Contractor, 2- Consultant and S- ADDC? San Cings SS “. pivision 8 a Tae =] my aa oto aie aan zal a Tasers = ei iar fam [35 a a Tao = = a a 7a iy Taare : x car an al a sae = car fan Baa ie =| a axl wa] = aaa ee Tesoro] a [a rf Taso | nl aor | 2 Taam] carl Sa aur tl 2 a =| carl saa arta at = ape mae ste eer TEIITlE 5 Fe : i j EyeyayE z i |i i] i : HF i j i : i : : = ama a Tanase zz g (43 yw wots o1use-a & on gP + FSae : én 58 aa 33 8s i ' t Tit} Fy Ue i f t 7 FE) Fd G Sse Sass Tana gE (4a wo feats o1 8190-0 cofelelelele| lelele| wonersans SS selon iad ee BP Se (42 rego fi 01 6150.0 g 5 | Bon = see a 26h 3 | 7 ous 220 g a 2 25m 2 gas ges 222 TonesanS SS

You might also like