OFFICE OF THE EXECUTIVE ENGINEEER (O&M)

JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH


Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Sahi Ram/Kishana Ram 1636-54 Lachadsar 40KVA 63KVA 01.04.19 02.04.19 BGP GP 45HP Req-63Kva
1 Rajaldesar-R
Ramu Ram/Bhagwana Ram 1625-0001 Lachadsar 40KVA 63KVA 01.04.19 02.04.19 BGP GP 45HP Req-63Kva

2 Sardarshahar-(o) Moter Market Sardarshar 3Phase Citi 100KVA 100KVA 01.04.19 02.04.19 BGP GP

Bajrang Lal/Tillu Ram 2357-267 Sawai 40KVA 40KVA 01.04.19 02.04.19 GP GP 32HP

Ompuri/Jeth Puri 1515-266 Ramsisar 40KVA 40KVA 01.04.19 02.04.19 BGP GP 40HP
3 Sardarshahar-(Rural)
Bhwari Devi/Juhara Ram 2363-259 Bandhanu 63KVA 63KVA 01.04.19 02.04.19 BGP GP 48HP

Sish Pal/Nirana Ram 1837-191 Tolasar 40KVA 40KVA 01.04.19 02.04.19 GP GP 40HP

1 Sardarshahar-(Rural) Patram/Daba Ram 1604-199 Bhadasar Dikhnada 40KVA 40KVA 02.04.19 02.04.19 BGP GP 42HP

2 Rajaldesar-R Hajari Ram/Bhera Ram 2333-22 Aalsar 63KVA 63KVA 02.04.19 03.04.2019 BGP GP 50HP

1 Rajaldesar-R Poorna Ram/ Jaisa Ram 2254-38 Hamusar 25KVA 16KVA 03.04.19 03.04.19 BGP GP 10HP

2 Sardarshahar-(O&M) Balaji Vihar colony 25KVA 40KVA 03.04.19 05.04.19 BGP BGP

Keshri Devi/ Birbal Ram 2364-156 Baandhnau 40KVA 40KVA 03.04.19 04.04.19 BGP GP 40HP
3 Sardarshahar-(Rural)
Patram/Daba Ram 1604-199 Bhadasar Dikhnada 40KVA 40KVA 03.04.19 04.04.19 GP GP 42HP

Chhokha Ram/Mohan Ram 2342-226 Chainpura 40KVA 63KVA 04.04.19 10.04.19 BGP GP 35HP

Dungar Mal/ Kumbha Ram 2344-0221 Ratangarh Rohi 25KVA 25KVA 04.04.19 10.04.19 BGP GP 25HP

Sanwara Ram/ Bhoma Ram 108-32 16KVA 16KVA 04.04.19 10.04.19 GP GP 10HP
1 Ratangarh (O&M)
Daudsar Dhani 5KVA 5KVA 04.04.19 10.04.19 GP GP

Naagla Johra Dhani 10KVA 10KVA 04.04.19 10.04.19 GP GP

Sumitra Devi/Shyam Sundar Sharma 2423-130 Chak Ratangarh 16KVA 16KVA 04.04.19 10.04.19 GP GP 15HP

Bansilal / Jagdish Prajapat 1726-128 Mainasar Sumeriya 40KVA 40KVA 04.04.19 04.04.19 BGP GP 30HP

Keshri Devi/ Mohan Ram Jat 1621-214 Bhadasar 63KVA 100KVA 04.04.19 05.04.19 BGP BGP 75HP Req - 100KVA
2 Sardarshahar-(Rural)
Hema Ram/ Dahara Ram Jat 1611-156 Assasar 40KVA 40KVA 04.04.19 04.04.19 BGP GP 45HP

Lali Kanwar/ Amaar Singh 2465-0018 Ruplisar 40KVA 40KVA 04.04.19 10.04.19 BGP BGP 40HP Req-63KVA

Shanti Devi/ Laluram Jakhar 1618-0089 Bhadasar Dikhnada 25KVA 25KVA 05.04.19 05.04.19 GP GP 24HP
1 Sardarshahar-(Rural)
Kunani Devi/ Magha Ram Jat 2361-0034 Gomtiya 63KVA 63KVA 05.04.19 05.04.19 BGP GP 60HP

Manfool/ Budharam Jaat 2339-0203 Chainpura 63KVA 63KVA 05.04.19 10.04.19 BGP GP 47.50HP
2 Ratangarh (O&M)
1Ø Transformer Ghumanda 5KVA 5KVA 05.04.19 10.04.19 BGP GP

Ummed Singh/Ramjilal 2353-15 Parsenu 40KVA 40KVA 05.04.19 10.04.19 GP GP 54HP

3 Rajaldesar-R Sunil Kumar/ Omprakash SCO No. 47/3624 Noowa 1Ø 5KVA 1Ø 5KVA 05.04.19 10.04.19 GP GP

AEN PHED Lachadsar 25KVA 25KVA 05.04.19 10.04.19 BGP GP

1 Ratangarh (O&M) AEN PHED Khariya 25KVA 25KVA 09.04.19 10.04.19 BGP GP

2 Rajaldesar-R Bega Ram 1648-58 Bhanuda 63KVA 63KVA 09.04.19 10.04.19 GP GP 43HP

1Ø Transformer Punusar 25KVA 25KVA 09.04.19 09.04.19 BGP GP

Jerti Devi/ Kushlaram Raajt 2365-0133 Bandhanu 100KVA 63KVA 09.04.19 09.04.19 BGP GP 80HP Req-63KVA

3 Sardarshahar-(Rural)
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Durga Ram/ Thku Ram 1818-102 Bijrasar 63KVA 63KVA 09.04.19 09.04.19 BGP GP 45HP
3 Sardarshahar-(Rural)
Shoyalal/ Chuna Ram Jat 1840-225 Rolasar 40KVA 40KVA 09.04.19 09.04.19 BGP GP 30HP

1Ø Transformer Rolasar 16KVA 16KVA 09.04.19 09.04.19 BGP GP

1Ø Transformer Rolasar 16KVA 16KVA 09.04.19 09.04.19 BGP GP

1 Sardarshahar - (Rural) Shoyalal/ Chuna Ram Jat 1840-225 Rolasar 40KVA 40KVA 10.04.19 10.04.19 GP GP 30HP

2 Rajaldesar-R Moola Ram/ Teja Ram 1625-32 Lachadsar 40KVA 40KVA 10.04.19 10.04.19 BGP BGP 40HP

Village Kangadwas 40KVA 40KVA 11.04.19 12.04.19 BGP GP


1 Sardarshahar - (Rural)
Rukmani Devi/ Sitaram Sharma 1621-112 Bhadasar 40KVA 40KVA 11.04.19 12.04.19 BGP GP 45HP

2 Rajaldesar-R Mal Singh/ Loon Signh 1633-30 Lachadsar 40KVA 40KVA 11.04.19 12.04.19 BGP GP 46HP

Gordhan Singh/ Phoosa Ram Jat 2434-114 Nausariya 40KVA 40KVA 11.04.19 12.04.19 BGP GP 27.5HP

3 Ratangarh (O&M) Bhanwar Singh/Narayan Singh 2411-1136 Gorisar 36KVA 36KVA 11.04.19 12.04.19 BGP GP 25HP

Geeta Devi/ Mahesh Sharma 503-189 Ratangarh 25KVA 25KVA 11.04.19 12.04.19 BGP GP 24.5HP

Surender Kumar/Keshor 2324-138 jaleu 25KVA 25KVA 12.04.19 12.04.19 BGP GP 10HP

1 Ratangarh (O&M) Omprakash /Moola Ram 1732-140 Hudera 16KVA 16KVA 12.04.19 12.04.19 BGP GP 15HP

Haru Ram/Dana Ram 513-151 Chainpura 40KVA 40KVA 12.04.19 12.04.19 BGP GP 28HP

Narayan Ram/Shayama Ram 1629-19 Parsenu 100KVA 100KVA 12.04.19 12.04.19 BGP GP 90HP

Khuma Ram/Shayama Ram 1636-21 Lachadsar 63KVA 63KVA 12.04.19 12.04.19 BGP GP 45HP
2 Rajaldesar-R
Kheta Ram/Magga Ram 1630-20 Parsenu 40KVA 63KVA 12.04.19 12.04.19 BGP GP 45HP Req-63Kva

AEN PHED Parsenu 25KVA 25KVA 12.04.19 12.04.19 BGP GP

Google Mata Mandir Mehrasar Upadiya 5KVA 5KVA 12.04.19 12.04.19 GP GP

Santosh Kumar/ Malu ram Mali 2185-231 Sarsar 25KVA 25KVA 15.04.19 15.04.19 BGP GP 15HP

Mani Ram/ Revat Ram Jat 2364-85 Bandhanu 40KVA 40KVA 15.04.19 15.04.19 BGP GP 40HP

1 Sardarsahar - Rural Rati Ram/ Aasha Ram 1514-39 Punusar 40KVA 40KVA 15.04.19 15.04.19 BGP GP 35HP

Bega Ram/ Hanumana Ram 1604-335 Badasar Dikhnada 100KVA 100KVA 15.04.19 15.04.19 GP GP 75HP

Jerti Devi/ Kushlaram Jat 2366-247 Bandhanu 63KVA 63KVA 15.04.19 15.04.19 GP GP 45HP

Jaswinder Singh/ Jogendar singh 1706-133 Malsar 25KVA 40KVA 15.04.19 23.04.19 BGP GP 40HP Req-40KVA

Reliance Jio Infocomm 1744-28 Bharpalsar 1Ø 10KVA 1Ø 10KVA 18.04.19 20.04.19 GP GP 5KW

1 Rajaldesar-R Moola Ram/ Teja Ram 1625-32 Lachadsar 40KVA 40KVA 18.04.19 20.04.19 BGP GP 40HP

Village Simsiya 1Ø 25KVA 1Ø 25KVA 18.04.19 20.04.19 BGP GP

Rakesh Kumar/ Ishwar Chand Sharma 591-71 Hariyasar 25KVA 25KVA 16.04.19 16.04.19 BGP GP 7KW

2 Sardarsahar - Rural HPCL Metal Pipe line 591-71 Arsisar 63KVA 63KVA 16.04.19 16.04.19 BGP GP 35KW

Gomad Ram/ Revat Ram 2364-140 Bandhanu 63KVA 63KVA 16.04.19 16.04.19 GP GP 45HP

Purnaa Ram/ Chuna Ram 1845-30 Kangar 63KVA 63KVA 20.04.19 22.04.19 GP GP 45HP

RameswerLal/Mala Ram 2342-224 Malasar 16KVA 16KVA 20.04.19 22.04.19 GP GP 15HP

1 Ratangarh (O&M)
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Ramkumar Uma Ram Nai 2342-114 Malasar 40KVA 40KVA 20.04.19 22.04.19 GP GP 29HP
1 Ratangarh (O&M)
Hunta Ram/Ramkumar 2327-128 Daudsar 25KVA 25KVA 20.04.19 22.04.19 BGP GP 14HP

Rajiya Bano 2334-128 Chak Ratangarh 40KVA 40KVA 20.04.19 22.04.19 GP GP 30HP

Harijan Basti Ratangarh 3Phase Citi 100KVA 100KVA 20.04.19 22.04.19 GP GP

Simsiya Village 1Phase Simsiya 25KVA 25KVA 20.04.19 22.04.19 GP GP

2 Rajaldesar-R Sahi Ram/Sawaala Ram 1653-68 Binadesar 40KVA 40KVA 20.04.19 22.04.19 GP GP 43HP

Dungar mal/Bhola Ram 1554-49 Rajaldesar 40KVA 40KVA 20.04.19 22.04.19 BGP GP 35HP

Sher Singh 1531-298 Mitasar 40KVA 40KVA 18.04.19 22.04.19 BGP GP 40HP Req-63Kva

3 Sardarsahar - Rural Dula Ram/ Ratna Ram 2383-233 Kalyanpura 63KVA 63KVA 20.04.19 22.04.19 GP GP 45HP

Patmdesar Village 1Phase Patmdesar 25KVA 25KVA 20.04.19 22.04.19 BGP GP

Moti Ram/ Chuna Ram 1752-113 Nuha 5KVA 5KVA 22.04.19 24.04.19 GP GP 2KW
1 Rajaldesar-R
Parma Ram/Nathu Ram 2235-80 Simsiya 25KVA 25KVA 22.04.19 23.04.19 BGP GP 10HP

PHED 1Phase Khivnsar 5KVA 5KVA 22.04.19 23.04.19 GP GP

PHED 1Phase Bherusar 5KVA 5KVA 22.04.19 23.04.19 BGP GP

Naarayan Devi/Chaatru Ram 1621-138 Bhadasar 40KVA 40KVA 22.04.19 23.04.19 BGP GP 30HP

Kumbha Ram/Hajari Ram 2363-234 Bandhanu 63KVA 63KVA 22.04.19 23.04.19 BGP GP 45HP

Uchhav Kawar/Bhawar Singh 2451-47 Patlisar 63KVA 63KVA 22.04.19 23.04.19 BGP GP 50HP

2 Sardarsahar - Rural Khumgar/Suratgahar 1723-568 Bhojasar 40KVA 40KVA 22.04.19 23.04.19 BGP GP 40HP

Ransingh/bhagmal 1707-90 Malsar 40KVA 40KVA 22.04.19 23.04.19 BGP GP 45HP

Amar Pati/Ranveer Singh 1706-109 Malsar 63KVA 63KVA 22.04.19 23.04.19 GP GP 60HP

Rukma Devi/Hajari Nath 1504-160 Bikamsara 63KVA 63KVA 22.04.19 23.04.19 GP GP 67HP

Mewa Ram/Balu Ram 2163-247 Ajeetsar 40KVA 40KVA 22.04.19 23.04.19 BGP GP 30HP

Village 1Phase Pichkarital 16KVA 16KVA 22.04.19 23.04.19 GP GP

Mohan Ram/Dana Ram 17723-235 Bhojasar 40KVA 40KVA 23.04.19 24.04.19 BGP GP 30HP

1 Sardarsahar - Rural Ramphal/Udi Ram 1717-374 Ransisar 40KVA 40KVA 23.04.19 24.04.19 BGP GP 30HP

Ashok Kumar/Rambax 21511-211 Bardasar 25KVA 25KVA 23.04.19 24.04.19 BGP GP 20HP

2 Rajaldesar-R Ramchandra/Chotha Ram 2352-33 Parsenu 5KVA 5KVA 23.04.19 24.04.19 GP GP 2KW

Sish Pal/Hanumana Ram 2327-12 Daudsar 25KVA 40KVA 24.04.19 26.04.19 BGP GP 35HP Req-40KVA

Purna Ram/Chuna Ram 1845-30 Kangar 63KVA 63KVA 24.04.19 26.04.19 GP GP 42HP
1 Ratangarh (O&M)
Ratangarh Rohi 1Phase Ratangarh 5KVA 5KVA 24.04.19 26.04.19 GP GP

Hudera Village 1Phase Hudera 5KVA 5KVA 24.04.19 26.04.19 BGP GP

2 Rajaldesar-R Vimla Devi/Girdhari 2353-17 Parsenu 63KVA 63KVA 24.04.19 26.04.19 BGP GP 45HP

Het Ram/chunni Ram 2267-96 Bholusar 25KVA 25KVA 24.04.19 25.04.19 BGP GP 17.5HP

Endus Towar 1611-100 Ashasar 10 KVA 1Phase 10 KVA 1Ph 24.04.19 25.04.19 BGP GP 5KW

3 Sardarsahar - Rural
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Surja ram/Sukha Ram 1511-277 Dhani Kaalera 40KVA 40KVA 24.04.19 25.04.19 BGP GP 34HP
3 Sardarsahar - Rural
Bharti Enfra Tel 1729-144 BilluBass 25KVA 25KVA 24.04.19 25.04.19 BGP GP 18KW

Village Bhojasar 1Phase Bhojasar 25KVA 25KVA 24.04.19 25.04.19 BGP GP

Sohan Das/ Bhur Das 1723-283 Bhojasar 40KVA 40KVA 24.04.19 25.04.19 GP GP 48HP

1 Rajaldesar-R Sohan Ram/Ruda Ram 2335-52 Alsar 63KVA 63KVA 25.04.19 09.05.19 GP GP 45HP

2 Shardarshar-R Shanti Devi/Devi Lal 2379-0167 Khileriya 25KVA 25KVA 25.04.19 26.04.19 BGP GP 15HP

Devipura Dhani 1Phase Devipura 5KVA 5KVA 26.04.19 29.04.19 GP GP


1 Ratangarh (O&M)
Phed ratangarh 1Phase Ratangarh 25KVA 25KVA 26.04.19 29.04.19 BGP GP

RamLal/Pas Singh 1838-91 Baniyasar 40KVA 40KVA 26.04.19 29.04.19 BGP GP 40HP

2 Sardarsahar - Rural Bhawari Devi/Kumbha Ram 1611-365 Ashasar 25KVA 25KVA 26.04.19 29.04.19 GP GP 25HP

Village Sawar 1Phase Sawar 25KVA 25KVA 26.04.19 29.04.19 GP GP

Rajasar Bikan 1Phase Rajasar 16KVA 16KVA 29.04.19 29.04.19 BGP GP

Aadu Ram/Birja Ram 1721-199 Ranasar 40KVA 40KVA 29.04.19 29.04.19 BGP GP 30HP
1 Sardarsahar - Rural
Deepa Ram/Fusha Ram 1611-0003 Ashasar 40KVA 25KVA 29.04.19 29.04.19 GP BGP 35HP Req-40KVAa

Sundar Devi/Panna Ram 2185-100 Sarsar 40KVA 40KVA 29.04.19 29.04.19 BGP BGP 30HP

Adu Ram/Kistura Ram 1656-13 Lachadsar 63KVA 63KVA 29.04.19 29.04.19 BGP GP 45HP

Khiraj Nath/Harak Nath 1646-41 Balrampura 63KVA 63KVA 29.04.19 29.04.19 BGP GP 47HP

2 Rajaldesar - Rural Onkar Ram/Bhura Ram 1665-19 Baandawa 40KVA 40KVA 29.04.19 29.04.19 BGP GP 40HP Req-63KVA

Bhika Ram/Dega Ram 1634-45 Lachadsar 40KVA 63KVA 29.04.19 29.04.19 BGP GP 40HP Req-63KVA

Nop Singh/Prem Singh 2335-60 Premnagar 63KVA 63KVA 29.04.19 29.04.19 BGP GP 50HP

1 Rajaldesar - Rural Onkar Ram/Bhura Ram 1665-19 Baandawa 40KVA 40KVA 30.04.19 02.05.19 GP GP 40HP

Ramfal/ Rajneet Singh 1828-177 Kusumdesar 100KVA 100KVA 30.04.19 02.05.19 BGP GP 105HP

Vinod Kumar/Munshi Ram 1723-82 Bhojasar Bada 63KVA 63KVA 30.04.19 02.05.19 BGP GP 42.5HP

Chandra ram/ Naurang Ram Jat 2467-117 Dega 100KVA 100KVA 30.04.19 02.05.19 BGP GP 80HP

Ramu Ram/Bhera Ram Jat 1707-279 Malsar 5KVA 5KVA 30.04.19 02.05.19 GP GP

2 Sardarsahar - Rural Sugni Devi 1629-402 Rajasar Bikan 40KVA 40KVA 30.04.19 02.05.19 BGP GP 40HP

Lal chand/ Rameshwar Lal Moond 2457-131 Patlisar Bada 40KVa 40KVa 01.05.19 02.05.19 BGP GP 40HP

Hunumana Ram/ Heera Ram 1810-146 Rangaisar 40KVA 40KVA 01.05.19 02.05.19 GP GP 40HP

Village Somasar 1Ø 5KVA 1Ø 5KVA 01.05.19 02.05.19 GP GP

Village Dulrasar 1Ø 25KVa 1Ø 25KVa 01.05.19 02.05.19 BGP GP

3 Sardarsahar - O&M City Kaccha Bus stand 100KVA 100KVA 01.05.19 02.05.19 GP GP

Gopal Ram/ Naurang Ram Jat 2439-258 Golsar 25KVA 25KVA 02.05.19 03.05.19 BGP GP 25HP

Shishpal/ Hanumana Ram Jat 2327-12 Daudsar 25KVA 25KVA 02.05.19 03.05.19 BGP GP 35HP
1 Ratangarh - O&M
Sanwara Ram/ Bhoma Ram 108-32 Hudera 16KVA 16KVA 02.05.19 03.05.19 GP GP 15HP
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
1 Ratangarh
Name of-S/D
O&M Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Ratangarh Rohi 1Phase Ratangarh 5KVA 5KVA 02.05.19 03.05.19 GP GP

Luna Ram/ Malu ram 1646-37 Lachadsar 40KVA 63KVA 02.05.19 03.05.19 BGP GP 47HP

2 Rajaldesar - Rural Takhat Singh/ Megh Singh 2337-38 Aalsar 63KVA 63KVA 02.05.19 03.05.19 GP GP 45HP

Dhera Ram/ Nirana Ram 1648-25 Lachadsar 40KVA 40KVA 02.05.19 03.05.19 BGP GP 45HP

Mula Ram/Mohan Ram 1654-0002 Binadesar 40KVA 40KVA 03.05.19 04.05.19 BGP GP 45HP

Jadav Devi/Jetha Ram 1634-44 Lachadsar 40KVA 63KVA 03.05.19 04.05.19 BGP GP 42.5HP

1 Rajaldesar - Rural Bhavendesar 1Phase Bhavendesar 16KVA 25KVA 03.05.19 04.05.19 BGP GP

Norang Das 1655-20 Lachadsar 40KVA 63KVA 03.05.19 04.05.19 BGP GP 45HP Req-63Kva

Rupa Ram 1656-003 Lachadsar 40KVA 40KVA 03.05.19 04.05.19 BGP GP 45HP Req-63Kva

Sawar Village 1Phase Sawar 25KVA 25KVA 03.05.19 04.05.19 BGP GP

Nirana Ram/Bhiya Ram 2466-128 Dhani Dega 63KVA 63KVA 03.05.19 04.05.19 BGP GP 54HP

Ramkumar /Sugan Gar 1725-189 Bhojasar 40KVA 40KVA 03.05.19 04.05.19 BGP GP 40HP

Sikori Devi/Hajari gar 1723-44 Bhojasar 63KVA 63KVA 03.05.19 04.05.19 GP GP 50HP
2 Sardarsahar - Rural
Bharti Enfra Tel 2266-247 Udsar Lodera 25KVA 25KVA 03.05.19 04.05.19 BGP GP 18KW

Sita Ram/Likhma Ram 1837-223 Bhadriya 63KVA 63KVA 03.05.19 04.05.19 BGP GP 48HP

Khiya Ram/Gorakh Ram 1611-293 Asasar 5KVA 5KVA 03.05.19 04.05.19 BGP GP

Vinod Kawar/Khiv Raj 1524-320 Sonpalsar 63KVA 63KVA 03.05.19 04.05.19 GP GP 45HP

Hajari Ram/Bhera Ram 1618-135 Bejasar 40KVA 40KVA 08.05.19 09.05.19 BGP GP 42.5HP

1 Sardarsahar - Rural Patlisar Bada 1Phase Village 16KVA 16KVA 08.05.19 09.05.19 BGP BGP

Mukh Ram/Kalu Ram 1818-296 Bijrasar 25KVA 63KVA 08.05.19 09.05.19 GP GP

1 Rajaldesar - Rural 33/11 GSS Bhanuda 1Phase Bhanuda 5KVA 5KVA 09.05.19 10.05.19 GP GP

2 Sardarsahar - Rural Rami Devi/ Toru Ram 1531-319 40KVA 40KVA 09.05.19 10.05.19 BGP GP 40HP

3 Sardarsahar - O&M Lilia Kuva ke Pas Citi 100KVA 100KVA 09.05.19 10.05.19 BGP GP N/S

1 Rajaldesar - Rural Kheta Ram/Bakta Ram 1634-27 Lachadsar 63KVA 63KVA 10.05.19 13.05.19 BGP GP

2 Sardarsahar - O&M Chandarei Basthi 3Phase Citi 100KVA 100KVA 10.05.19 13.05.19 BGP GP

Nathu Rama/Goru Ram 2457-112 Patlisar 63KVA 63KVA 10.05.19 13.05.19 BGP GP 48HP

Licchu Ram/Mangtu Ram 1531-417 Mitasar 25KVA 25KVA 10.05.19 13.05.19 BGP GP 35HP
3 Sardarsahar - Rural
Dhani Kalera 1Phase Village 16KVA 16KVA 10.05.19 13.05.19 BGP GP

Mani Ram/Sugna Ram 1621-120 Bhadasar 40KVA 40KVA 10.05.19 13.05.19 BGP GP 40HP

Kumkum Devi 2132-22 Ratangarh 3Q 16KVA 3Q 16KVA 10.05.19 14.05.19 BGP GP 10HP

Nemi Chand/Mohan Ram New Con Daudsar 3Q 16KVA 3Q 16KVA 10.05.19 14.05.19 BGP GP 15HP

4 Ratangarh - O&M Likhama Ram/Bhagna Ram New Con Daudsar 40KVA 40KVA 10.05.19 14.05.19 GP GP 30Gp

Eibrahim/Sakru 2345-252 Gorisar 25KVA 25KVA 10.05.19 14.05.19 GP GP 25HP

Gopal Ram/ Naurang Ram Jat 24339-258 Golsar 25KVA 25KVA 10.05.19 14.05.19 GP GP 25HP
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Rugha Ram/Purkha Ram 2244-13 Bhawandesar 5KW 5KW 13.05.19 14.05.19 BGP GP 1KW

Heeraa Devi/Gaanesha Ram 1710-64 Lachadsar 63KVA 63KVA 13.05.19 14.05.19 BGP GP 40HP

Adu Ram/Kistura Ram 1656-13 Lachadsar 63KVA 63KVA 13.05.19 14.05.19 BGP GP 45HP

Khiraj Nath/Harak Nath 1646-41 Balrampura 63KVA 63KVA 13.05.19 14.05.19 BGP GP 47HP
1 Rajaldesar - Rural
Onkar Ram/Bhura Ram 1665-19 Baandawa 40KVA 40KVA 13.05.19 14.05.19 BGP GP 40HP Req-63KVA

Bhika Ram/Dega Ram 1634-45 Lachadsar 40KVA 63KVA 13.05.19 14.05.19 BGP GP 40HP Req-63KVA

Nop Singh/Prem Singh 2335-60 Premnagar 63KVA 63KVA 13.05.19 14.05.19 BGP GP 50HP

Kheta Ram/Bakta Ram 1634-27 Lachadsar 100KVA 100KVA 13.05.19 14.05.19 BGP GP 85HP

Deep Dingh/Pep Singh 2258-118 Sawai Badi 40KVA 40KVA 13.05.19 14.05.19 BGP GP 40HP
2 Sardarsahar - Rural
Madan Lal/Pura Ram 1612-0005 Rekh Gorisar 40KVA 40KVA 13.05.19 14.05.19 BGP GP 50HP

Rajkumar Sugna Ram 2351-213 Shela 1Q 5KVA 1Q 5KVA 14.05.19 15.05.19 BGP GP 2KW

Sawarmal Bhani Ram 1721-243 Raghunathpura 3Q 16KVA 3Q 16KVA 14.05.19 15.05.19 BGP GP 15HP

1 Ratangarh - O&M Arun Kumar/Jugdisah 2345-255 jaleu 25KVA 25KVA 14.05.19 15.05.19 BGP GP 25HP

Heera Ram/Gopala Ram 2410-50 jaleu 25KVA 25KVA 14.05.19 15.05.19 BGP GP 20HP

Panna Ram/Jivan Ram 305-041 Nosriya 25KVA 25KVA 14.05.19 15.05.19 BGP GP 20HP

Parsenue Village 3Phase Village 63KVA 63KVA 14.05.19 15.05.19 BGP GP

Alsar Village 3Phase Village 100KVA 100KVA 14.05.19 15.05.19 BGP GP


2 Rajaldesar - Rural
Gordhan Singh/Bishan Singh 2353-20 Parsenu 40KVA 40KVA 14.05.19 15.05.19 BGP GP 50HP Req-63KVA

Kushala Ram/Kumbha Ram 2351-0001 Parsenu 63KVA 63KVA 14.05.19 15.05.19 BGP GP 45HP

Meetasar Village 1Phase Village 25KVA 25KVA 14.05.19 15.05.19 BGP GP

Ram Narayan/Rawata Ram Ag Naw Ajeetsar 25KVA 25KVA 14.05.19 15.05.19 GP GP 25HP

3 Sardarsahar - Rural Bhawari Devi/Kumbha Ram 1611-365 Asasar 25KVA 25KVA 14.05.19 15.05.19 GP GP 25HP

Bhagirath /Veer Das 1633-180 Rangaisar 5KVA 5KVA 14.05.19 15.05.19 BGP GP 4KW

Chotu Ram/Dhanna Ram 1611-47 Asasar 25KVA 25KVA 14.05.19 15.05.19 BGP GP 35HP

Jaleue Badi 1Phase Village 5KVA 5KVA 15.05.19 16.05.19 BGP GP


1 Ratangarh - O&M
Panna Lal Meghwal 2428-122 Melusar 3Q 16KVA 3Q 16KVA 15.05.19 16.05.19 GP GP 15HP

Bhera Ram/Mala Ram 2342-23 Alsar Bass 40KVA 63KVA 15.05.19 16.05.19 GP GP 50HP Req-63KVA

2 Rajaldesar - Rural Mangi Lal/Ladu Ram Ag Naw Parsenu 40KVA 40KVA 15.05.19 16.05.19 GP GP 30HP

Lichmana Ram 2253-47 Bada Ki Dhani 40KVA 63KVA 15.05.19 16.05.19 BGP GP 45HP Req-63KVA

Pulasar Village 3Phase Pulasar 40KVA 40KVA 15.05.19 16.05.19 GP GP N/S

Tulshi Devi/Rugha Ram 1708-258 Maalsar 25KVA 25KVA 15.05.19 16.05.19 BGP GP 27.5HP
3 Sardarsahar - Rural
Punnusar Village 1Phase Punnusar 16KVA 16KVA 15.05.19 16.05.19 BGP GP

Bajrang Lal/Tillu Ram 1618-254 Bejasar 40KVA 40KVA 15.05.19 16.05.19 BGP GP 40HP

Birbal Ram/Sharvan Ram 2358-19 SawaiBadi 40KVA 40KVA 16.05.19 18.05.19 BGP GP 40HP

1 Sardarsahar - Rural
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Rewat Ram/Lalu Ram 2383-180 Kalyanpura 40KVA 63KVA 16.05.19 18.05.19 BGP GP 45HP Req-63KVA

1 Sardarsahar - Rural Phula Ram/Labhu Ram 1829-240 Ranasar Bikan 40KVA 40KVA 16.05.19 18.05.19 BGP GP 40HP

Sher Singh/Gangaa Ram 1701-77 Gidgichiya 40KVA 40KVA 16.05.19 18.05.19 BGP GP 35HP

Mohan Nath/Pren Math Sidh 1707-89 Malsar 100KVA 100KVA 16.05.19 18.05.19 GP GP 80HP

Patashi Devi/Raamu Ram 2352-003 Parsenu 40KVA 63KVA 16.05.19 18.05.19 BGP GP 55HP Req-63KVA

2 Rajaldesar - Rural ShoyoPal/Guman Singh 2353-34 Parsenu 40KVA 63KVA 16.05.19 18.05.19 BGP GP 45HP Req-63KVA

Harikishan/Gordhan 2350-23 Parsenu 40KVA 63KVA 16.05.19 18.05.19 GP GP 50HP Req-63KVA

1 Sardarsahar - O&M Sanisher Mandir Ke Pass 3Phase Citi 250KVA 250KVA 18.05.19 20.05.19 BGP GP

2 Rajaldesar - Rural Nopa Ram/Chunaa Ram 1636-18 Lachadsar 40KVA 63KVA 18.05.19 20.05.19 BGP GP 40HP Req-63KVA

Adu Ram/Gopal Ram Ag Naw Bijrasar 25KVA 25KVA 18.05.19 20.05.19 GP GP 20HP

Endraj /Kana Ram 1514-203 Punnusar 5KVA 5KVA 18.05.19 20.05.19 GP GP 2KW

Bhura Ram/Chuna Ram 2185-117 20.05.19 GP 15HP D/Metar


Sarsar 40KVA 40KVA 18.05.19 BGP
Prem Chand/Umdas 2186-147 20.05.19 GP 15HP

Rajendar Singh/Jugpal 1611-212 Asasar 40KVA 40KVA 18.05.19 20.05.19 BGP GP 40HP

3 Sardarsahar - Rural Meer Devi/Prem Nath 1701-395 Gidgichiya 40KVA 40KVA 18.05.19 20.05.19 GP GP 40HP

Gopal Ram/Nand Ram 897-72 Dulrasar 16KVA 3P 16KVA 3P 18.05.19 20.05.19 GP GP 15HP

Bhani Ram/Malu Ram 2366-138 Bandhanu 100KVA 100KVA 18.05.19 20.05.19 GP GP 70HP

Rameshwer Lal/Chuna Ram 2464-271 Ruplisar 40KVA 40KVA 18.05.19 20.05.19 BGP GP 40HP

Chetan Ram/Surja Ram 1701-178 Gidgichiya 40KVA 40KVA 18.05.19 20.05.19 BGP GP 40HP

Kalyanpura Village 1Phase Village 16KVA 16KVA 18.05.19 20.05.19 BGP GP

4 Ratangarh - O&M Chabari Village 3Phase Village 100KVA 100KVA 18.05.19 20.05.19 BGP GP

Magga Ram/Narayan Ram 1629-24 Lachadsar 40KVA 63KVA 20.05.19 21.05.19 BGP GP 45HP Req-63Kva
1 Rajaldesar - Rural
Sharmila/Sushi Kumar 2338-10 Alsar 63KVA 63KVA 20.05.19 21.05.19 BGP GP 48HP

Rameshwer Lal/Mala Ram 2342-224 Malasar 16KVA 3P 16KVA 3P 20.05.19 21.05.19 GP GP 17HP

2 Ratangarh Phula Ram/Rawata Ram Ag Naw Nosriya 25KVA 25KVA 20.05.19 21.05.19 GP GP 25HP

Ladhasar Dhani 1Phase Lachadsar 5KVA 5KVA 20.05.19 21.05.19 GP GP

Ravi Dutt/Nank Ram Nai 1701-180 Gidgichiya 100KVA 100KVA 20.05.19 21.05.19 BGP GP 90HP

Ramcharan/Likhama Ram 1701-486 Gidgichiya 63KVA 63KVA 20.05.19 21.05.19 GP GP 45HP


3 Sardarsahar - Rural
Babu Lal/Laxmi Narayan 1706-122 Malasar 40KVA 63KVA 20.05.19 21.05.19 BGP GP 60HP Req-63KVA

Omprakash/Uma Ram 1840-217 Rolasar 40KVA 40KVA 20.05.19 21.05.19 BGP GP 40HP

1 Rajaldesar - Rural Amit Kumar/Jogendar Singh 2337-44 Alsar 63KVA 63KVA 21.05.19 22.05.19 BGP GP 48HP

Chetan Ram/Mukh Ram 1817-252 Badriya 40KVA 40KVA 21.05.19 22.05.19 BGP GP 40HP

Village dhirasar 1Phase Village 25KVA 25KVA 21.05.19 22.05.19 BGP GP

2 Sardarsahar - Rural Omprakash /Labhu Ram 1834-74 Sadasar 25KVA 25KVA 21.05.19 22.05.19 BGP GP 18KW
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
2 Sardarsahar - Rural faild DT Replaced DT Failure nt P GP/BG
P
Birbal Ram/Chandra Ram 1524-222 Sonpalsar 63KVA 63KVA 21.05.19 22.05.19 GP GP 48HP

Village Bhojasar 1Phase Bhojrasar 25KVA 25KVA 21.05.19 22.05.19 BGP GP

3 Ratangarh - O&M Teli Masijd Ratangarh 3Phase Citi 100KVA 100KVA 21.05.19 23.05.19 BGP GP Req-160KVA

Udasar Charan 1Phase Village 16KVA 16KVA 22.05.19 23.05.19 BGP GP

1 Sardarsahar - Rural Birbal Ram/Chetan Ram 1710-348 Malaksar 40KVA 40KVA 22.05.19 23.05.19 GP GP 30HP

Dhani Kalera 1Phase Kalera 16KVA 16KVA 22.05.19 23.05.19 GP GP

Sumitra Devi/Shyam Sundar Sharma 2423-130 Lachadsar 25KVA 25KVA 22.05.19 23.05.19 GP GP 15HP

Birbal Ram/Dungar Ram 2340-39 Chainpura 25KVA 25KVA 22.05.19 23.05.19 BGP GP 15HP

Jetha Ram/Malu Ram 1845-127 Kangar 25KVA 25KVA 22.05.19 23.05.19 GP GP 16HP
2 Ratangarh - O&M
Phed ratangarh 3Phase Ratangarh 25KVA 25KVA 22.05.19 23.05.19 GP GP

Ladhasar Dhani 1Phase Lachadsar 5KVA 5KVA 22.05.19 23.05.19 BGP GP

Khuma Ram/Bega Ram 511-208 Chainpura 40KVA 40KVA 22.05.19 23.05.19 BGP GP 30HP

Bhawara Ram 2456-256 Patlisar 40KVA 40KVA 23.05.19 24.05.19 BGP GP 48HP Req-63KVA
1 Sardarsahar - Rural
Malu Ram/Shoyji Ram Ag Naw Bejasar 40KVA 40KVA 23.05.19 24.05.19 GP GP 27.5HP

Rukhasar Village 3Phase Village 100KVA 100KVA 23.05.19 24.05.19 BGP GP


1 Ratangarh
Ratangarh Citi 3Phase Citi 63KVA 63KVA 23.05.19 24.05.19 BGP GP

Degu Ram/Hanumana Ram 110-230 Kangar 25KVA 25KVA 24.05.19 25.05.19 BGP GP 17HP

Pradeep Kumar/Maadan Lal 2341-241 Chainpura 40KVA 40KVA 24.05.19 25.05.19 BGP GP 30HP

1 Ratangarh - O&M PHED HUDERA 3Phase Hudera 25KVA 25KVA 24.05.19 25.05.19 BGP GP

Ganesha Ram/Hunta Ram 1518-146 Daudsar 40KVA 40KVA 24.05.19 25.05.19 BGP GP 30HP

Shoyo bax Ram/Kunna Ram 2327-124 Daudsar 25KVA 25KVA 24.05.19 25.05.19 BGP GP 15HP

Rugha Ram/Shayo Ji Ram 2250-34 Sikrali 40KVA 63KVA 24.05.19 25.05.19 BGP GP 48HP Req-63KVA

Parmeshwer Lal/Mohan Lal 1633-39 Lachadsar 40KVA 40KVA 24.05.19 25.05.19 BGP GP 35HP
2 Rajaldesar - Rural
Som Ram/Bhera Ram 2341-25 Alsar 40KVA 63KVA 24.05.19 25.05.19 BGP GP 45HP Req-63KVA

Ashu Singh/Chak Singh 2333-006 Parsenu 63KVA 63KVA 24.05.19 25.05.19 BGP GP 51HP

1 Sardarsahar - O&M Reliance Petrol Pump Ke Pass 3Phase Citi 40KVA 40KVA 27.05.19 28.05.19 BGP GP

Jugdish Prasad/Khiraj Ram 1710-506 Malaksar 63KVA 63KVA 25.05.19 28.05.19 GP GP 45HP

HariRam/Khiraj Ram 1710-405 Malaksar 40KVA 40KVA 25.05.19 28.05.19 BGP GP 40HP

Sarpanch Graam Panchyat 1633-166 Rangaisar 25KVA 25KVA 25.05.19 28.05.19 BGP GP 20HP

Village Gomatiya 1Phase Gomatiya 16KVA 16KVA 25.05.19 28.05.19 BGP GP

Village Mehri 1Phase Mehari 25KVA 25KVA 25.05.19 28.05.19 BGP GP

2 Sardarsahar - Rural Village Panpaliya 1Phase Panpaliya 25KVA 25KVA 25.05.19 28.05.19 GP GP

Ganga Devi/ Eshwar Ram 1604-86 Bhadasar Dikhnada 100KVA 100KVA 27.05.19 28.05.19 GP GP 85HP

Bhiya Ram/Dhanna Ram 1618-292 Bejasar 40KVA 40KVA 27.05.19 28.05.19 BGP GP 40HP
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
2 Sardarsahar - Rural
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Jethi Devi/Khushala Ram 2366-247 Bandhanu 63KVA 63KVA 27.05.19 28.05.19 GP GP 45HP

Lichamana Ram/Kumbha Ram 1813-138 Nimrasar 40KVA 40KVA 27.05.19 28.05.19 GP GP 30HP

Village Rajasar Pavran 1Phase Village 16KVA 16KVA 27.05.19 28.05.19 BGP GP

Kumbha Ram/Dalu Ram 1649-21 Balrampura 40KVA 63KVA 27.05.19 28.05.19 BGP GP 52HP Req-63KVA

Fushah Ram/Uma Ram 1625-19 Lachadsar 40KVA 63KVA 27.05.19 29.05.19 BGP GP 45HP Req-63KVA

3 Rajaldesar - Rural Subash Chand/Narayan Ram 1645-18 Bandwa 63KVA 63KVA 27.05.19 29.05.19 BGP GP 60HP

Bhawar Singh/Durag Singh 1554-14 Parsenu 40KVA 63KVA 27.05.19 28.05.19 GP GP 48HP Req-63KVA

Khiv Dan Singh/Surat Dan Singh 2335-47 Alsar 63KVA 63KVA 27.05.19 28.05.19 BGP GP 45HP

3 Ratangarh - O&M PHED Talaniya 3Phase Citi 63KVA 63KVA 27.05.19 28.05.19 BGP GP

Bhawar Lal/Sohan Ram 1846-0081 Kangar 25KVA 25KVA 28.05.19 29.05.19 GP GP 25HP

1 Ratangarh Mal Nath/Dul Nath 1846-160 Kangar 25KVA 25KVA 28.05.19 29.05.19 GP GP 25HP

Hal Ram/Sohan Ram 2329-103 Daudsar 25KVA 25KVA 28.05.19 29.05.19 BGP GP 15HP

Mota Ram/Gulla Ram 1648-48 Lachadsar 100KVA 100KVA 28.05.19 30.05.19 BGP GP 85HP
2 Rajaldesar - Rural
Khema Ram/Dhanna Ram 1645-19 Bandwa 40KVA 63KVA 28.05.19 30.05.19 BGP GP 40HP Req-63KVA

Bharti Hexa Com Ltd 2255-127 Bhojasar 25KVA 25KVA 28.05.19 29.05.19 BGP GP 18KW

Kalu Singh/Kan Singh 1817-327 Badriya 40KVA 40KVA 28.05.19 29.05.19 GP GP 30HP

3 Sardarsahar - Rural Shiv Dan/Mula Ram 1516-166 Ramsisar Chaglaniya 40KVA 40KVA 28.05.19 29.05.19 BGP GP 42.5HP

Uddi Devi/Mangi Lal 1517-156 Ramsisar Chaglaniya 40KVA 40KVA 28.05.19 29.05.19 GP GP 35HP

Ramkishan /Raje Ram 1827-156 Sawar 25KVA 25KVA 28.05.19 29.05.19 BGP GP 23HP

1 Rajaldesar - Rural PHED Gopalpuriya 1Phase Gopalpuriya 5KVA 5KVA 29.05.19 30.05.19 BGP GP

Bajarang Singh/Gop Singh 1846-131 Ladhasar 25KVA 25KVA 29.05.19 30.05.19 BGP GP 27HP

Parma Ram/Adu Ram 2114-36 Kangar 25KVA 25KVA 29.05.19 30.05.19 BGP GP 10HP
2 Ratangarh
Gopi Ram/Rawata Ram Ag Naw Gorisar 25KVA 25KVA 29.05.19 30.05.19 GP GP 20HP

Endus Towar 2326-69 Gogasar 25KVA 25KVA 29.05.19 30.05.19 BGP GP 25KW

Raju Ram/Sagar Ram 1604-43 Bandhanu 40KVA 40KVA 29.05.19 30.05.19 BGP GP 40HP

Pani Devi/Bhawar Lal Sharan 1602-51 Bandhanu 40KVA 40KVA 29.05.19 30.05.19 BGP GP 44HP

Gulab Ram/Goma Ram 1504-191 Bikamsara 100KVA 100KVA 29.05.19 30.05.19 GP GP 90HP
3 Sardarshar-R
Ravindra/Kashi Ram 1725-134 Bhojasar 40KVA 40KVA 29.05.19 30.05.19 GP GP 40HP

Kailash/Mohan Ram Ramsisar 100KVA 100KVA 29.05.19 30.05.19 GP GP 82HP

Nopa Ram/Kheta Ram 1531-252 Mitasar 40KVA 40KVA 29.05.19 30.05.19 BGP GP 45HP

Payali Village 3Phase Payali 100KVA 100KVA 30.05.19 31.05.19 GP GP

1 Rajaldesar - Rural Ballu Devi/Mohan Ram 2351-30 Parsenu 40KVA 63KVA 30.05.19 31.05.19 BGP GP 45HP Req-63KVAa

Nanak Ram/Natha Ram 1665-10 Binadesar 40KVA 63KVA 30.05.19 31.05.19 BGP GP 40HP Req-63KVAa

Tolu Dan/Ravi Dan Charan 1622-57 Charanwashhi 40KVA 40KVA 30.05.19 31.05.19 BGP GP 43HP

2 Sardarshar-R
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Ramphal/Ranjeet 1628-177 Kusumdesar 100KVA 100KVA 30.05.19 31.05.19 BGP GP 105HP

Hari Ram/Chuna Ram 902-35 Badriya 63KVA 63KVA 30.05.19 31.05.19 BGP GP 50HP

2 Sardarshar-R Ravindra/Kashi Ram 1725-134 Bhojasar 40KVA 40KVA 30.05.19 31.05.19 GP GP 40HP

Praladh /Khiraja ram 1710-406 Malaksar 40KVA 40KVA 30.05.19 31.05.19 BGP GP 40HP

Bhagwan Singh/Pep Singh 2455-96 Patlisar 100KVA 100KVA 30.05.19 31.05.19 BGP GP 80HP

Parmeshweri Devi/Ram Lal 2456-1663 Patlisar 40KVA 40KVA 30.05.19 31.05.19 BGP GP 40HP

RamLal/Mala Ram Ag New Daudsar 16KVA 3P 16KVA 3P 01.06.19 03.06.19 GP GP 15HP

Gangu Singh/Jor Singh Ag New Hudera 25KVA 25KVA 01.06.19 03.06.19 GP GP 25HP

Mohan Ram/teja Ram Ag New Chainpura 25KVA 25KVA 01.06.19 03.06.19 GP GP 20HP

Mangla Ram/Endra Ram 1518-29 Daudsar 25KVA 25KVA 01.06.19 03.06.19 BGP GP 21HP
1 Ratangarh - O&M
Sugna Ram/Rawata Ram 1518-69 Daudsar 25KVA 25KVA 01.06.19 03.06.19 BGP GP 17HP

Deepsar Villagge 3Phase Village 63KVA 63KVA 01.06.19 03.06.19 BGP GP

Bhukredi Village 3Phase Village 63KVA 63KVA 01.06.19 03.06.19 BGP GP

Jaleue Village 1Phase Village 25KVA 25KVA 01.06.19 03.06.19 BGP GP

Ameen/Lal Moh. 2334-25 Alsar 40KVA 63KVA 31.05.19 03.06.19 GP GP 45HP Req-63KVAa

Karni Singh/Put Singh 1627-25 Bandwa 40KVA 63KVA 31.05.19 03.06.19 BGP GP 45HP Req-63KVAa
2 Rajaldesar - Rural
Bannu Devi/Mohan Ram 2351-30 Parsenu 63KVA 63KVA 31.05.19 03.06.19 GP GP 47 HP

Likhama Devi/Mula Ram 1654-58 Binadesar 40KVA 63KVA 31.05.19 03.06.19 BGP GP 45HP Req-63KVAa

Gora Devi/Mohan Ram 1611-55 Asasar 40KVA 40KVA 01.06.19 03.06.19 BGP GP 36HP

Mala Ram/Pema Ram 1517-118 Ramsisar 63KVA 63KVA 01.06.19 03.06.19 BGP GP 50HP

Meheri Village 1Phase Village 25KVA 25KVA 01.06.19 03.06.19 BGP GP

3 Sardarshar-R M.M.Dhani Yojna 1517-96-99 ramsisar 5KVA 5KVA 01.06.19 03.06.19 GP GP 40HP

Gumani Devi/Phusha Ram 2365-175 Bandhanu 40KVA 40KVA 01.06.19 03.06.19 BGP GP 40HP

Baadriya Village 1Phase Village 16KVA 16KVA 01.06.19 03.06.19 GP GP

Kalusar Village 1Phase Village 16 KVA 16 KVA 01.06.19 03.06.19 GP GP

Mota Ram/Chandra Ram 2338-12 Alsar 40KVA 40KVA 03.06.19 04.06.19 GP GP 40HP

1 Rajaldesar - Rural Karni Singh/Put Singh 1627-25 Bandwa 63KVA 63KVA 03.06.19 04.06.19 BGP BGP 45HP

Keshara Ram/Uda Ram 1635-008 Lachadsar 63KVA 63KVA 03.06.19 04.06.19 BGP BGP 45HP Req-63KVA

Sulkhniya PHED 3Phase Village 25KVA 25KVA 03.06.19 04.06.19 BGP BGP

2 Ratangarh - O&M Ratangarh Citi 3Phase Village 25KVA 25KVA 03.06.19 04.06.19 BGP BGP

Jaleue Village 3Phase Village 63KVA 63KVA 03.06.19 04.06.19 BGP BGP

Shankar Lal/Harak Nath 1505-214 Bikamsara 25KVA 25KVA 03.06.19 04.06.19 BGP BGP 35HP

Khuman Puri/Shugan Puri 1516-006 Ramsisar 40KVA 40KVA 03.06.19 04.06.19 BGP BGP 38HP

Puraa Ram/Sukh Ram 1511-40 Ramsisar 40KVA 40KVA 03.06.19 04.06.19 BGP BGP 40HP

3 Sardarshar-R
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Kesh Singh/ Jivan Singh 1705-15 Bhojasar 63KVA 63KVA 03.06.19 04.06.19 GP GP 45HP
3 Sardarshar-R
Chandraa Ram/Sardara Ram 1816-17 Halasar 40KVA 40KVA 03.06.19 04.06.19 BGP BGP 35HP

Pabu Singh/Laxman Singh 1717-237 Ransisar 63KVA 63KVA 03.06.19 04.06.19 BGP BGP 45HP

Chand Khan/Nure Khan 1505-247 Bikamsara 25KVA 25KVA 03.06.19 04.06.19 BGP BGP 27HP

M.M.Dhani Yojna 505-221-25 Bikamsara 5KVA 5KVA 03.06.19 04.06.19 GP GP

Shiv Bari - Ratangarh 100KVA 100KVA 06.06.19 04.06.19 BGP BGP 160kva

Dayalu Hanuman Mandir - Ratangarh 40KVA 40KVA 06.06.19 04.06.19 GP GP

Birbal Ram/Dunger Ram 2340-0059 Chainpura 25KVA 25KVA 05.06.19 04.06.19 GP GP 16kva

1 Ratangarh - O&M Mahaveer Psd./Mool Chand AG New Devipura 25KVA 25KVA 05.06.19 04.06.19 GP GP

Gopal Ram/Keshra Ram 2349-140 Gorisar 25KVA 25KVA 05.06.19 04.06.19 BGP BGP 16kva

Pema Ram/Asha Ram 2326-0080 Daudsar 25KVA 25KVA 05.06.19 04.06.19 GP GP

Omprakash/Tiloka Ram 2432-189 Halasar 16KVA 16KVA 05.06.19 04.06.19 BGP BGP

2 Sardarsahar - O&M Arjun Club, Behind PHED - Sardarshahar 100KVA 100KVA 07.06.19 04.06.19 BGP BGP

Ravi Prabhat/Bhagirath 1638-0009 Parsenu 40KVA 40KVA 04.06.19 04.06.19 BGP BGP 63 kva

Bega Ram/Kana Ram 1633-0018 Lachadsar 40KVA 40KVA 04.06.19 04.06.19 GP GP 63 kva
3 Rajaldesar - Rural
Bhanwar Lal/Ramkumar 2341-0035 Alsar 40KVA 40KVA 04.06.19 04.06.19 BGP BGP 63 kva

Abarsar Village - Abarsar 10KVA 10KVA 04.06.19 04.06.19 BGP BGP 25kva 1 Ø

Kalwasiya Village Kalwasiyaa 16kva 16kva 04.06.19 04.06.19 BGP BGP

Rajuram/Bhaira ram 1707-0079 Malsar 5KVA 5KVA 04.06.19 04.06.19 GP GP


4 Sardarshar-R
Banarsi Devi/Shyodana Ram 2467-0170 Dega 40KVA 40KVA 04.06.19 04.06.19 BGP BGP

Mool Singh/Deep Singh 2185-0078 Sarsar 40KVA 40KVA 04.06.19 04.06.19 BGP BGP

Garib NamaZ Trading Company 405-242 RTGH 25KVA 25KVA 07.06.19 10.06.19 BGP BGP 25HP

Gopal ram/ Mangala Ram 2327-0068 Daudsar 25KVA 25KVA 08.06.19 10.06.19 BGP BGP 20HP

Ramniwas / Malu Ram 2340-0096 Gogasar 40KVA 40KVA 09.06.19 10.06.19 BGP BGP 30HP
1 Ratangarh - O&M
Purkha Ram/ Jetha Ram 2346-206 Gorisar 25KVA 25KVA 09.06.19 10.06.19 GP GP 17HP

Panna Ram/ Malu Ram Sharma AG NEW Conn Gorisar 25KVA 25KVA 09.06.19 10.06.19 GP GP 20HP

Village Mainasar 100KVA 100KVA 09.06.19 10.06.19 BGP BGP Nonsuper

Kanhaiya Lal/ Sundaram Jat 1513-32 Mehrasaar Chhana 40KVA 40KVA 07.06.19 10.06.19 80HP

Kanhaiya Lal/ Sundaram Jat 1513-32 Mehrasaar Chhana 63KVA 63KVA 07.06.19 10.06.19 80HP

Mahavir Singh/ Sunjan Singh AG NEW Conn 40KVA 40KVA 07.06.19 10.06.19 BGP BGP 35HP

Gorkha Ram Jat/ Praahalad Ram 1701-179 Gidgichiya 100KVA 100KVA 07.06.19 10.06.19 BGP BGP 90HP

Sadul Singh/ Kushal Singh 2456-88 Patlisar 100KVA 100KVA 07.06.19 10.06.19 GP GP 97HP

Udaram/ Harka Ram 1706-448 Malsar 40KVAa 63KVA 07.06.19 10.06.19 BGP BGP 51HP Req-63KVA

Kumbharam Jat/ Rawatraram 1618-22 25KVA 25KVA 07.06.19 10.06.19 BGP BGP 27HP

2 SRDR Rural
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Prahalad Ram Jat 1710-334 Malaksar 40KVA 40KVA 07.06.19 10.06.19 BGP BGP 30HP

Kanaram/ Chaugaram 1517-111 Ramsisar 100KVA 100KVA 07.06.19 10.06.19 BGP BGP 80HP

Hariram/ Poornaram Jat 1721-181 40KVA 63KVA 07.06.19 10.06.19 BGP BGP 48HP Req-63KVA
2 SRDR Rural
Bhopal Singh/Nathu Singh 2465-107 Ruplisar 40KVA 40KVA 07.06.19 10.06.19 BGP BGP 35HP

Jitendra Singh/ Jethu Singh 1531-190 Bikasar 40KVA 40KVA 07.06.19 10.06.19 GP GP 48HP

Sugnaram 1631-359 Bhadasar 25KVA 40KVA 07.06.19 10.06.19 BGP BGP 27HP Req-40KVA

Bhawaniram/ Surjaram 1524-254 40KVA 40KVA 07.06.19 10.06.19 BGP BGP 40HP

Lekharam/Megharam 1817-210 40KVA 40KVA 07.06.19 10.06.19 BGP BGP 30HP

Rajasar Village 1Ph 16KVA 1Ph 16KVA 07.06.19 10.06.19 GP GP

Indraj/ Raawataram 1710-524 Malaksar 40KVA 40KVA 08.06.19 10.06.19 BGP BGP 30HP

Gora Devi/Mohan Ram 1611-19 Aasasar 40KVA 40KVA 08.06.19 10.06.19 GP GP 35HP

Rameshlal/ Sultanram Meena 1622-112 Charanwashhi 40KVA 40KVA 08.06.19 10.06.19 BGP BGP 34HP

Imarti Devi 1618-343 Bejasar 25KVA 25KVA 08.06.19 10.06.19 BGP BGP 25HP

Amit Kumar/Jogendar Singh 2337-44 Aasasar 63KVA 40KVA 07.06.19 10.06.19 GP GP 48HP

Chetanaram 1649-03 Binadesar 40KVA 25KVA 07.06.19 10.06.19 GP GP 45HP

Chaluram 1646-20 Balrampura 40KVA 40KVA 07.06.19 10.06.19 BGP BGP 40HP

Santu Devi/ Bhaduram Meghwal 2250-17 Balrampura 63KVA 63KVA 07.06.19 10.06.19 BGP BGP 48HP

Ganesharam 2326-12 Jegniya 1Ph 5KVA 1Ph 5KVA 07.06.19 10.06.19 GP GP


3 RJR
Kamla Kanwar/Pabudan Singh SCO 55/3624 16KVA 16KVA 07.06.19 10.06.19 GP GP 10HP

Mohan Das/ Suraj Das Swami 2252-45 Bhada ki dhani 40KVA 40KVA 07.06.19 10.06.19 BGP BGP 47HP

Derda ki dhani Binadesar 1ph 5KVA 1ph 5KVA 08.06.19 10.06.19 GP GP

Village Jegniya 1ph 25KVA 1ph 25KVA 08.06.19 10.06.19 BGP BGP

Village Ratandesar 1ph 25KVA 1ph 25KVA 08.06.19 10.06.19 BGP BGP

Kalyan Singh/ Govind Singh 2111-448 Malasara 60KVA 60KVA 10.06.19 11.06.19 BGP BGP 47HP

Suresh Kumar AG new Conn Malesar 40KVA 40KVA 10.06.19 11.06.19 GP GP 30HP

Huntaram/ Dungar ram 1846-114 Kangar 16KVA 16KVA 10.06.19 11.06.19 GP GP 15HP
1 Ratangarh - O&M
Gangu Singh/Jor Singh AG new Conn Hudera 25KVA 25KVA 10.06.19 11.06.19 GP GP 20HP

Surjaram/ Baluram 2352-332 Sehla 25KVA 40KVA 10.06.19 11.06.19 GP GP 25HP Req-40KVA

Village Mainasar 1ph 16KVA 1ph 16KVA 10.06.19 11.06.19 BGP BGP

Surji Devi/ Ramlal Jat 2356-123 Sawai Delana 63KVA 100KVA 10.06.19 11.06.19 BGP GP 87.5HP Req-100KVA

Ramkaran/ Sohanlal 1710-21 Malaksar 63KVA 63KVA 10.06.19 11.06.19 BGP GP 45HP

Ramchandra/ Malaram 1707-236 Malsar 40KVA 40KVA 10.06.19 11.06.19 BGP GP 30HP

2 Sardarshahar - Rural Ramfal/ Rajneet Singh 1828-177 Kusumdesar 100KVA 100KVA 10.06.19 11.06.19 GP GP 105HP

Lichhna Devi/Swarn nath AG Gen New Lunasar 63KVA 63KVA 10.06.19 11.06.19 GP GP 45HP
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
2 Sardarshahar - Rural Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Satyanarayan/ Choturaam 1633-165 Rangaaisar 40KVA 40KVA 10.06.19 11.06.19 BGP BGP 33HP

Village Bhadasar Utrada 1ph 25KVA 1ph 25KVA 10.06.19 11.06.19 BGP

Vimla Devi/ Ajeet Sign 1531-107 Mitasar 40KVA 40KVA 11.06.19 12.06.19 BGP GP 34HP

Naurang Ram/ Ram sharma 1817-301 Badaliya 40KVA 40KVA 11.06.19 12.06.19 BGP GP 40HP

Lali Devi/ Radheshyam Soni 1621-296 Bhadasar Utrada 1Ph 5KVA 1Ph 5KVA 11.06.19 12.06.19 GP 2KW
1 Sardarshahar - Rural
Kanaram/ Surajaram 1621-281 Bhadasar 5KVA 5KVA 11.06.19 12.06.19 BGP GP 5KW Dhani Yojna

Malaksar PHED 1510-19 Malaksar 25KVA 25KVA 11.06.19 12.06.19 GP GP 15HP

Village Sadhasar 16KVA 16KVA 11.06.19 12.06.19 GP GP

Pema Ram/ Gangadhar Ram 1646-61 Lachadsar 40KVA 63KVA 11.06.19 12.06.19 BGP GP 47HP

2 Rajaldesar Subash Chand/Narayan Ram 1645-18 Bandwa 63KVA 63KVA 11.06.19 12.06.19 GP GP 60HP

Ram Singh/ Khet Singh 1635-17 Lachadsar 63KVA 63KVA 11.06.19 12.06.19 BGP GP 69HP

Village Mainasaar 63KVA 63KVA 11.06.19 12.06.19 BGP

3 Ratangarh - O&M Village Jaleu 1Ph 16KVA 1Ph 16KVA 11.06.19 12.06.19 GP

Radhe Arts RIICO 63KVA 63KVA 11.06.19 12.06.19 45HP Super

Derdha ki dhani Bindesar 1Ph 5KVA 1Ph 5KVA 12.06.19 13.06.19 GP GP

1 Rajaldesar Rajuram/ Hukma raam 1638-07 Lachadsar 40KVA 40KVA 12.06.19 13.06.19 BGP BGP 40HP

Rukmani Devi/ Bhanwardas 1653-36 Lachadsar 63KVA 63KVA 12.06.19 13.06.19 GP GP 80HP

RajKumar/ Malaram 1517-161 Ramsisar 40KVA 63KVA 12.06.19 13.06.19 GP GP 45HP Req-63KVA

Prakash Chaand 1517-283 Ramsisar 40KVA 40KVA 12.06.19 13.06.19 BGP GP 40HP
2 Sardarshahar - Rural
Village Khejda 100KVA 100KVA 12.06.19 13.06.19 BGP GP

Daluram/ Motiram 2363-49 Bandhanu 63KVA 63KVA 12.06.19 13.06.19 BGP GP 90HP

Shehla- Hanumanpura ki Dhani 1ph 25KVA 1ph 25KVA 12.06.19 13.06.19 GP GP

Sohanram/ lalaram Jat 2329-106 Daudsar 40KVA 40KVA 12.06.19 13.06.19 BGP GP 27.5HP

3 Ratangarh - O&M Kanaram/ Megharam Jat 2434-123 Nausariya 16KVA 16KVA 12.06.19 13.06.19 GP GP 15HP

Omprakash/ Ganpatram 2340-60 Chainpura 16KVA 16KVA 12.06.19 13.06.19 BGP GP 15HP

Manful/ Budharam Jat 2339-203 Chainpura 63KVAA 63KVAA 12.06.19 13.06.19 BGP GP 47.5HP

Village Jaleu 1Ph 25KVA 1Ph 25KVA 13.06.19 14.06.19 GP


1 Ratangarh - O&M
Village Mainsar 100KVA 100KVA 13.06.19 14.06.19 BGP

2 Rajaldesar AEN PHED Hamusar Hamusar 1Ph 5KVA 1Ph 5KVA 13.06.19 14.06.19 BGP GP

Sukharam/ Ramchandra 1723-267 Bhojasar Chhota 40KVA 40KVA 13.06.19 14.06.19 BGP GP 40HP
3 Sardarshahar - Rural
Khet Singh/ Om Singh 2467-166 Dega 25KVA 25KVA 13.06.19 14.06.19 GP BGP 25HP

Rawatji Bada Ramnagar Bass 100KVA 100KVA 16.06.19 17.06.19 BGP Gp


1 Sardarshahar (O&M)
New Tanki Ramnagar Bass 100KVA 100KVA 16.06.19 17.06.19 BGP Gp

Mangtu Ram 1710-341 Malaksar 40KVA 40KVA 14.06.19 17.06.19 BGP Gp 40HP
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Nathram/ Bhuraram Jat 2366-184 Bandhanu 40KVA 63KVA 14.06.19 17.06.19 BGP BGP 52HP Req-63KVA

Hetram 1836-175 Dalusar 63KVA 63KVA 14.06.19 17.06.19 BGP GP 45HP

Khetanram/ Danaram Jat 1723-234 Bhojsar Chhota 40KVA 40KVA 14.06.19 17.06.19 BGP BGP 30HP

Nayan Joda 33/11KV GSS 5KVA 5KVA 14.06.19 17.06.19 BGP GP

Village Kikasar 1Ph 5KVA 1Ph 5KVA 14.06.19 17.06.19 BGP GP


2 Sardarshahar - Rural
Moolaram/ Nanakram Meghwal 1712-161 Narsara 40KVA 40KVA 14.06.19 17.06.19 GP GP 40HP

Village Sawar 1Ph 16KVA 1Ph 16KVA 15.06.19 17.06.19 GP GP

Ramkumar 2266-85 Kudsar 25KVA 25KVA 15.06.19 17.06.19 BGP BGP 15HP

Dataram/Laduram AG Gen NEw Rajasar 40KVA 40KVA 15.06.19 17.06.19 GP BGP 30HP

Kaluram/ Omprakash Jat 1611-180 Asasar 40KVA 63KVA 15.06.19 17.06.19 BGP GP 45HP Req-63KVA

AEN PHED Sawar 1827-168 40KVA 25KVA 15.06.19 17.06.19 BGP GP 15HP Req-25KVA

Jaish Singh/ Ladu Singh 1632-25 Lachadsar 40KVA 40KVA 14.06.19 17.06.19 GP GP 46HP

Dhapi Devi 2353-11 Parsenu 100KVA 100KVA 16.06.19 17.06.19 BGP GP 90HP

3 Rajaldesar Patashi Devi/Raamu Ram 2352-03 Parsenu 63KVA 63KVA 16.06.19 17.06.19 BGP GP 55HP

Jevani Devi 1734-04 Chhajusar 25KVA 25KVA 16.06.19 17.06.19 BGP GP 22HP

Village Lachadsar 40KVA 40KVA 16.06.19 17.06.19 BGP GP

Hunkara Ram/Prabhu Ram 1632-22 Lachadsar 63KVA 63KVA 17.06.19 18.06.19 BGP GP 45HP

Hunkara Ram/Prabhu Ram 1639-12 Lachadsar 40KVA 63KVA 17.06.19 18.06.19 BGP GP 45HP Req-63KVA
1 Rajaldesar - Rural
Omprakash/Shrawan Kumar 1631-08 Lachadsar 63KVA 63KVA 17.06.19 18.06.19 BGP GP 46HP

Ramnath/Kalu Ram 1634-19 Lachadsar 63KVA 63KVA 17.06.19 18.06.19 BGP GP 48HP

Bhawaar Lal/Nand Ram 2329-48 Daudsar 25KVA 25KVA 17.06.19 18.06.19 BGP GP 25HP

Kaswa Petrol Pump 3Phase Rtgh 100KVA 100KVA 17.06.19 18.06.19 BGP GP

2 Ratangarh - O&M Omprakash/ Tiloka Ram 2432-189 Hansasar 16KVA 16KVA 17.06.19 18.06.19 GP GP 12.5HP

Bhawara Ram 2326-84 Gorisar 63KVA 63KVA 17.06.19 18.06.19 BGP GP 50HP

Indus Tower 1836-264 Menasar 25KVA 25KVA 17.06.19 18.06.19 BGP GP 12KW

Shanti Devi 2363-45 Bandhanu 100KVA 100KVA 17.06.19 22.06.19 GP GP 90HP

Sohan Lal/Kistura Ram 1515-66 Ramsisar 40KVA 40KVA 17.06.19 18.06.19 GP GP 38HP

Chunna Ram/Bhiva Ram 1701-280 Gidgichiya 40KVA 40KVA 17.06.19 18.06.19 BGP GP 35HP

Dungar Ram/Arjun Ram 1704-271 Bhadasar 40KVA 40KVA 17.06.19 18.06.19 GP GP 35HP

Village 1Phase Asasar 25KVA 25KVA 17.06.19 18.06.19 BGP GP

3 Sardarshahar - Rural Tolu Ram 2366-167 Bandhanu 40KVA 40KVA 17.06.19 18.06.19 BGP GP 38HP

Sonam Kawaar 2252-16 Jivendesar 25KVA 25KVA 17.06.19 18.06.19 BGP GP 38HP

Village 1Phase Nimrasar 25KVA 25KVA 17.06.19 18.06.19 GP GP

Village 1Phase Pichkarital 16KVA 16KVA 17.06.19 18.06.19 BGP GP


3 Sardarshahar - Rural
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Thakar Ram 1715-154 Lunasar 63KVA 63KVA 17.06.19 18.06.19 BGP GP 52HP

Chand Khan/Nure Khan 1505-247 Bikamsara 40KVA 40KVA 17.06.19 18.06.19 BGP GP 27HP

1 Rajaldesar Dungar Ram/Kishana Ram 1621-0007 Lachadsar 40KVA 63KVA 18.06.19 19.06.19 BGP GP 48HP Req-63KVA
OFFICE OF THE EXECUTIVE ENGINEEER (O&M)
JODHPUR VIDYUT VITRAN NIGAM LIMITED, RATANGARH
Replec
Date of Brunt
Name of S/D Name of Consumer A/C No Name of Vill Capacity of Capacity of Date of Replaceme GP/BG ed LOAD
faild DT Replaced DT Failure nt P GP/BG
P
Village 1Phase Udsar 25KVA 25KVA 18.06.19 19.06.19 BGP GP

Kailash/Mohan Ram 1515-174 Ramsisar 40KVA 40KVA 18.06.19 19.06.19 BGP GP 40HP

Bhagwana Ram/Taru Ram 2455-174 Ramsisar 40KVA 40KVA 18.06.19 19.06.19 BGP GP 40HP
2 Sardarshahar - Rural
Malaa Ram/Badraa Ram 1516-204 Ramsisar 25KVA 25KVA 18.06.19 19.06.19 GP GP 20HP

Ramkaran/ Rewat Ram 1710-351 Malaksar 63KVA 63KVA 18.06.19 19.06.19 BGP GP 48HP

Village 1Phase Amrasar 25KVA 25KVA 18.06.19 19.06.19 GP GP

Gomad Nath/Licchu Nath 1505-207 Bikamsara 63KVA 63KVA 19.06.19 20.06.19 BGP GP 75HP

Dolat Ram/Sugna Ram 1818-235 Bijrasar 25KVA 25KVA 19.06.19 20.06.19 BGP GP 20HP
1 Sardarshahar - Rural
Dhanna Ram/Mansa Ram 1611-311 Asasar 5KVA 5KVA 19.06.19 20.06.19 GP GP

Khiv Singh/Bhadur singh 2363-214 Kalyanpura 40KVA 40KVA 19.06.19 20.06.19 BGP GP 40HP

Parma Ram/Moti Ram 2233-56 Simsiya 25KVA 25KVA 19.06.19 20.06.19 GP GP 25HP
2 Rajaldesar
Purna Ram/Jeta Ram 2254-38 Hamusar 16 KVA 3ph 16 KVA 3ph 19.06.19 20.06.19 GP GP 10HP

Rajiya bano/Elihibux 2434-253 Chak Ratangarh 40KVA 40KVA 19.06.19 20.06.19 GP GP 27.5HP

Sawarmal/Suja Ram 2434-253 Nosriya 25KVA 25KVA 19.06.19 20.06.19 BGP GP 25HP

3 Ratangarh - O&M Vikram Singh/Bheru Singh 305-521 Nosriya 16KVA 16KVA 19.06.19 20.06.19 GP GP 15HP

Keshara Ram/Gopala Ram 2349-140 Gorisar 25KVA 25KVA 19.06.19 20.06.19 BGP GP 12HP

Bhichri Village 3Phase Bhichri 100KVA 100KVA 19.06.19 20.06.19 BGP GP

4 shardarshar O&M Dungal Ki Kua 3Phase Citi 63KVA 63KVA 19.06.19 20.06.19 BGP GP

Heera Devi/Sawala Ram 1725-102 Bhojasar 40KVA 40KVA 20.06.19 21.06.19 BGP GP 40HP

Birma Ram/Thakur Singh 1523-145 Sonpalsar 40KVA 63KVA 20.06.19 21.06.19 GP GP 45HP Req-63Kva

Norang Ram/Banna Nath 1817-227 Badriya 100KVA 100KVA 20.06.19 22.06.19 BGP GP 80HP

1 Sardarshahar - Rural Dhapi Devi/Mukh Ram 1715-153 Lunasar 40Kva 40Kva 20.06.19 21.06.19 BGP GP 40HP

Hema Ram/Bhera Ram 1611-230 Asasar 40Kva 40Kva 20.06.19 21.06.19 BGP GP 40HP

Aadu Ram 2465-171 Ruplisar 25KVA 25KVA 20.06.19 21.06.19 GP GP 20HP

Bhagwana Ram/Nanu Ram 1514-153 Punusar 63KVA 63KVA 20.06.19 21.06.19 BGP GP 45HP

Heera Devi/Sharvan Ram 1646-02 Balrampura 63KVA 63KVA 20.06.19 21.06.19 GP GP 45HP

Madan Singh/Nathu Singh 1654-45 Binadesar 40KVA 63KVA 20.06.19 21.06.19 GP GP 60HP Req-63KVA

Binadesar Village 1Phase Binadesar 5KVA 5KVA 20.06.19 21.06.19 GP GP


2 Rajaldesar - Rural
Bhojasar Dhani 1Phase Bhojasar 5KVA 5KVA 20.06.19 21.06.19 GP GP

PHED Padihara 1Phase Padhira 5KVA 5KVA 20.06.19 21.06.19 GP GP

Abadsar Village 1Phase Village 25KVA 25KVA 20.06.19 21.06.19 BGP GP