S.No Sub Station Name Name of the Feeder Name of the Sub Proposed Trench Actual Start Status/Remarks
contractor Details Date
Length (Mtrs) Type of the Actual Start Date Crusher dust & CC Road
From To Excavation Cable laying Debris Shifting Remarks
trench WMM restoration
1 Appal Naidu
1 Peda Waltair SS Doctors Colony GBR Engineering DTR - 12, SP - 22 SP - 23 100 4
3 Peda Waltair SS Doctors Colony GBR Engineering DTR - 13, F - 1 SP-3 120 4
4 Peda Waltair SS Doctors Colony GBR Engineering DTR - 13, SP-3 SP - 5 100 4
5 Peda Waltair SS Doctors Colony GBR Engineering DTR - 13, SP - 12 DB - 13 40 4
6 Peda Waltair SS Doctors Colony GBR Engineering DTR - 13, SP - 3 SP - 5 60 4
7 Peda Waltair SS Doctors Colony GBR Engineering DTR-4, SP-1 SP-3 35 4
8 Shivaja Palem Au Women's S Constructions DTR - 4, FB - 3 SP - 14 110 4
9 Shivaja Palem Au Women's S Constructions DTR - 7, SP - 8 SP - 12 80 4
18 Collector Office SS Official Colony South Pole RMU-2 (EXT.RMU) RMU7 - (Lucid) 80 3
19 Collector Office SS Official Colony South Pole RMU-6 Noval Cost Battery 90 3
22 KGH SS Official Colony (Pendurpeta) GSR Projects CSS-1, SP-5 SP-9 100 4
26 KGH SS Official Colony (Pendurpeta) GSR Projects CSS, SP-54 SP-64 120 4
3 Pavan Kumar
1 Pedawaltair Chinawaltair GBR Engineering DTR-2,SP-19 SP-20 30 4
2 Lawsons Bay Pedawaltair South Pole DTR-9, F-2 SP-7 205 4
3 Lawsons Bay Pedawaltair S Constructions DTR-8, SP-25 SP-29 40 4
4 Lawsons Bay Pedawaltair S Constructions DTR-8, SP-15 SP-18 35 4
5 Lawsons Bay Pedawaltair S Constructions DTR-8, SP-4 SP-8 75 4
6 Lawsons Bay Pedawaltair S Constructions DTR-3 F-1 SP-16 150 4
7 Vuda SS VMRDA SRPR RMU-1 HT Service (Vuda Park) 20 3
8 Vuda SS VMRDA SRPR DTR-1, F-1 SP-3 35 4
9 KGH SS KGH South Pole DTR-3 SP-1 SP-2 40 4
196Mtrs Actual Length
10 Lawsons Bay Pedawaltair South Pole DTR-9, F-1 SP-33 36 4 30.10.2020 WIP WIP WIP WIP
160 Mtrs trench excavation WIP
186Mtrs Actual Length
11 Lawsons Bay Pedawaltair S Constructions DTR - 4, SP-8 SP - 10 25 4 18.11.2020 WIP WIP WIP WIP
122 Mtrs trench, Cable Laying Completed
230 Mtrs Trench Excavation WIP, Cable Laying
12 KGH SS KGH South Pole DTR - 3, F - 2 SP - 15 15 4 15.12.20 WIP WIP WIP WIP
4 Dileep Kumar
1 Pedawaltair Old CBI SRPR DTR - 13, F - 1 SP - 17 115 4
2 Pedawaltair Old CBI SRPR DTR - 13, SP - 9 DB - 18 130 4
3 Pedawaltair Old CBI SRPR DTR - 13, F - 1 DB - 14 85 4
4 Siripuram SS Pandurangapuram TTIPL RMU 4 L&T SRK FEEDER RMU 55 3
5 Naga Chandra
Actual Lentgh-130mtrs
4 KGH SS Jagadamba SRPR DTR - 8 LT 4 19.11.2020 Completed Completed WIP Completed
130Mtrs Trench Excavation WIP
5 KGH SS Jagadamba Swarna Srinivas DTR-7 LT 4 28.10.2020 Compelted Compelted Compelted Completed Actual Lentgh-80mtrs
6 KGH SS Jagadamba Pankaj Traders DTR - 2 LT 4 09.10.2020 Compelted Compelted Compelted WIP Compelted 140Mtrs Restoration WIP
1 ASR Projects 40 0 0 0 0 0%
2 GBR Engineering 605 0 0 0 0 0%
3 GSR Projects 780 0 0 0 0 0%
4 Nipuna Engg 40 0 0 0 0 0%
5 TTIPL 55 0 0 0 0 0%
6 S Constructions 1055 0 0 0 0 0%
7 South Pole 1606 0 0 0 0 0%
8 SRPR 1921 0 0 0 0 0%
9 Sri Srinivasa Enterprises 280 0 0 0 0 0%
Grand Total 6382 0 0 0 0 0%
Planning Lentgh-6382 mtrs
Feb-21
Feb'21 Up to % of
planned Up to Back Crusher Up to CC Trench Trench
S.No Description UOM Trench filling level dust & level Open Completi DTR Foundations
length WMM on
Plan Actual
% of % of % of % of % of
Complet Plan Actual Complet Plan Actual Complet Plan Actual Completio Plan Actual Complet Plan
ion ion ion n ion
0% 3 0% 1 0% 1 0% 64 0%
0% 0% 0% 0% 52 0%
0% 1 0% 0% 0% 48 0%
0% 3 0% 0% 0% 29 0%
0% 7 0% 3 0% 3 0% 24 0%
0% 14 0 0% 4 0 0% 4 0 0% 217 0 0% 0
5/14/2021
Feeder Pillars
Service Pillars Erection Foundation Feeder Pillars Erection
% of % of % of
Actual Completi Plan Actual Complet Plan Actual Complet
on ion ion
0% 9 0% 0%
0% 6 0% 0%
0% 7 0% 0%
0% 6 0% 0%
0% 10 0% 0%
0 0% 38 0 0% 0 0 0%