Item DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

I. EARTHWORKS
Excavation & Tampering Works
MATERIAL COST
LABOR COST
II. CONCRETE WORKS
3/4 Gravel 7.9 cu.m 1400 11,060.00
River Sand 4 cu.m 1350 5,400.00
Portland Cement 59 bag 260 15,340.00
MATERIAL COST 31,800.00
LABOR COST 13,387.80
III. STEEL WORKS
10mm x 6m Rebar 60 pcs 140 8,400.00
Studs 35 x 76 x 3000mm 111 pcs 101 11,211.00
G.I. Tie Wire #16 2 roll 65 130.00
MATERIAL COST 19,741.00
LABOR COST 8,528.11
IV. DOORS AND WINDOWS
Door(Incl. door knob & Jamb) 2 set 2100 4,200.00
Jalousie Glass 144 pcs -
Window Frame 12 sets 500 6,000.00
MATERIAL COST 10,200.00
LABOR COST 4,457.40
V. WALL & CEILING
Hardiflex 95 pcs 340 32,300.00
HardiScrew 3500 pcs 2.5 8,750.00
Metal Furring 19 x 25 x 5000mm 52 pcs 75 3,900.00
Angle Bar 1 1/2 X 3/16 30 pcs 400 12,000.00
C-Purlins 3"x1 3/8" 32 pcs 370 11,840.00
MATERIAL COST 68,790.00
LABOR COST 28,341.48
VI. ROOFING
Rib Type 20 l.m 450 9,000.00
Teks Screw 450 pcs 2 900.00
Blind Rivet 1 box 270 270.00
Elasto Seal 2 liter 470 940.00
Aluminum Insulation Foam
MATERIAL COST 11,110.00
LABOR COST 4,677.31
VII. SEPTIC TANK
4' thck. CHB 276 pcs. 15.00 4,140.00
Portland Cement 12 bags 260.00 3,120.00
River Sand 2 cu.m. 1400.00 2,800.00
12mm Defformed Steel Bar 12 pcs. 185.00 2,220.00
10mm Defformed Steel Bar 8 pcs. 140.00 1,120.00
G.I. Tie Wire #16 2 rolls 70.00 140.00
MATERIAL COST 13,540.00
LABOR COST 5,564.94
3/4 Gravel 7.9 cu.m 1400 11,060.00
River Sand 4 cu.m 1350 5,400.00
Portland Cement 59 bag 230 13,570.00
MATERIAL COST 30,030.00
LABOR COST 12,672.66

10mm x 6m Rebar 60 pcs 140 8,400.00


Studs 35 x 76 x 3000mm 111 pcs 101 11,211.00
G.I. Tie Wire #16 2 roll 65 130.00
MATERIAL COST 19,741.00
LABOR COST 8,528.11

Jalousie Glass 144 pcs -


Window Frame 12 sets 500 6,000.00
MATERIAL COST 6,000.00
LABOR COST 2,622.00

IV. WALL & CEILING -


Hardiflex 95 pcs 340 32,300.00
HardiScrew 3500 pcs 2.5 8,750.00
Metal Furring 19 x 25 x 5000mm 52 pcs 75 3,900.00
Angle Bar 1 1/2 X 3/16 30 pcs 395 11,850.00
C-Purlins 3"x1 3/8" 32 pcs 370 11,840.00
MATERIAL COST 68,640.00
LABOR COST 28,279.68
V. ROOFING
Rib Type 20 l.m 450 9,000.00
Teks Screw 450 pcs 2 900.00
Blind Rivet 1 box 270 270.00
Elasto Seal 2 liter 470 940.00
Aluminum Insulation Foam
MATERIAL COST 11,110.00
LABOR COST 4,677.31