The document summarizes the concrete pouring for the third phase of a construction project. It lists the volumes of concrete needed for columns measuring 25 x 40 cm and beams measuring 25 x 50 cm, as well as a 13 cm thick concrete roof plate, totaling 9.13 cubic meters. Additionally, it specifies the volumes of concrete required for a ground tank's sloping roof measuring 20 x 30 cm, a 30 cm thick bottom plate, and 30 cm thick concrete walls, totaling 15.37 cubic meters. The total concrete poured for this phase was 29.69 cubic meters.
The document summarizes the concrete pouring for the third phase of a construction project. It lists the volumes of concrete needed for columns measuring 25 x 40 cm and beams measuring 25 x 50 cm, as well as a 13 cm thick concrete roof plate, totaling 9.13 cubic meters. Additionally, it specifies the volumes of concrete required for a ground tank's sloping roof measuring 20 x 30 cm, a 30 cm thick bottom plate, and 30 cm thick concrete walls, totaling 15.37 cubic meters. The total concrete poured for this phase was 29.69 cubic meters.
The document summarizes the concrete pouring for the third phase of a construction project. It lists the volumes of concrete needed for columns measuring 25 x 40 cm and beams measuring 25 x 50 cm, as well as a 13 cm thick concrete roof plate, totaling 9.13 cubic meters. Additionally, it specifies the volumes of concrete required for a ground tank's sloping roof measuring 20 x 30 cm, a 30 cm thick bottom plate, and 30 cm thick concrete walls, totaling 15.37 cubic meters. The total concrete poured for this phase was 29.69 cubic meters.