This quotation provides estimates for construction work for a house including excavation, backfilling, concrete work, reinforced cement concrete (RCC), masonry work using blocks, plastering of internal and external walls. The total estimated cost for all the work is Rs. 2,282,518. Key items include earthwork, RCC for pile caps, plinth beams, slabs, columns, beams, lintels and sunshades, masonry work using aerocon and cement mortar blocks, plastering of internal and external walls.
This quotation provides estimates for construction work for a house including excavation, backfilling, concrete work, reinforced cement concrete (RCC), masonry work using blocks, plastering of internal and external walls. The total estimated cost for all the work is Rs. 2,282,518. Key items include earthwork, RCC for pile caps, plinth beams, slabs, columns, beams, lintels and sunshades, masonry work using aerocon and cement mortar blocks, plastering of internal and external walls.
This quotation provides estimates for construction work for a house including excavation, backfilling, concrete work, reinforced cement concrete (RCC), masonry work using blocks, plastering of internal and external walls. The total estimated cost for all the work is Rs. 2,282,518. Key items include earthwork, RCC for pile caps, plinth beams, slabs, columns, beams, lintels and sunshades, masonry work using aerocon and cement mortar blocks, plastering of internal and external walls.
EARTHWORK EXCAVATION IN ORDINARY SOIL INCLUDING SECTIONING & SOIL BANK 1 WITH INITIAL LEAD AND LIFT UPTO 50 M AND 59.02 m³ 650.00 38,365 1.5 M FOR FOUNDATION ( USING MACHINE)
BACK FILLING PILECAP, GRADE BEAM &
2 76.18 m³ 1500.00 114,265 FILLING INSIDE THE PLINTH
PROVIDING AND LAYING PLAIN
CEMENT CONCRETE 1:4:8(1 PARTS OF CEMENT, 4 PARTS OF COARSE SAND, 8 PARTS OF GRADED STONE AGGREGATE 40MM /20MM NOMINAL SIZE) AS LEVELING COURSE IN FLOORINGS AND BELOW COLUMN FOOTINGS AND FOUNDATIONS 3 INCLUDING ALL LABOURS AND COST OF 4.50 m³ 7800.00 35,121 TAMPING, CURING, SHUTTERING, MECHANICAL MIXING AND VIBRATING,COMPACTION FINISHING,CARTAGE ETC
PROVIDING AND LAYING RCC IN M25 AS
PER THE DESIGN MIX SUBMITTED AND APPROVED USING ORDINARY PORTLAND CEMENT AND GRADED AGGREGATES(BPG) OF 20MM MAXIMUM SIZE, INCLUDING ALL FORMWORK, MACHINE MIXING, LAYING AND VIBRATING, HAND PACKING, LEVELLING, SATISFACTORY CURING, ETC
BLOCKWORK PROVINDING AND LAYING BLOCKWORK IN 200MM THICK CM 1:6(1 PART CEMENT:6 PARTS COARSESAND) USING SOLID BLOCK SIZE 30X20X15CM (STRENGTH OF BRICK SHALL NOT BE LESS THAN 50KG/CM2)INCLUDING RACKING OUT JOINTS 6MM DEEP EVERYWHERE, REQUIRED CURING ETC, INCLUDING RECESSES, OPENINGS, 11 SCAFFOLDINGS, STAGING, CURING, FINISHING 9.02 m³ 10800.00 97,378 THE JOINTS FLUSH BELOW GROUND LEVEL AND ABOVE PLINTH LEVEL, COST OF ALL MATERIALS, LABOURS ETC ALL COMPLETE AS PER SPECIFICATIONS
PROVIDING AEROCON BLOCK MASONRY,
200MM THICK IN AAC ADHESIVE USING APPROVED QUALITY AEROCON BLOCKS, 12 40.68 m³ 11500.00 467,870 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, HIRE AND LABOUR CHARGES FOR SCAFFOLDING, WATERING, CURING ETC.
PROVIDING AEROCON BLOCK MASONRY,
150MM THICK IN AAC ADHESIVE USING APPROVED QUALITY AEROCON BLOCKS, 13 INCLUDING COST AND CONVEYANCE OF 4.48 m³ 11500.00 51,505 ALL MATERIALS TO SITE, HIRE AND LABOUR CHARGES FOR SCAFFOLDING, WATERING, CURING ETC.
PROVIDING AEROCON BLOCK MASONRY,
100MM THICK IN AAC ADHESIVE USING APPROVED QUALITY AEROCON BLOCKS, 14 1.31 m³ 11500.00 15,041 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, HIRE AND LABOUR CHARGES FOR SCAFFOLDING, WATERING, CURING ETC.
PLASTERING
PLASTERING EXTERNAL SURFACE OF
WALL WITH CEMENT MORTAR 1:4 WITH A MINIMUM OF 12 MM THICK ONE COAT FLOATED AND TROWELLED SMOOTH, 15 212.11 m2 485.00 102,872 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, LEAD, LIFT AND HIRE CHARGES FOR SCAFFOLDING, WATERING, CURING ETC PLASTERING INTERNAL SURFACE OF WALL WITH CEMENT MORTAR 1:4 WITH A MINIMUM OF 12 MM THICK ONE COAT FLOATED AND TROWELLED SMOOTH, 16 502.17 m2 475.00 238,529 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, LEAD, LIFT AND HIRE CHARGES FOR SCAFFOLDING, WATERING, CURING ETC GRAND TOTAL 2,282,518