Professional Documents
Culture Documents
BANGUR NAGAR,M G ROAD, For power SMS POWER <9 digit account no.> to
7065313030 from any mobile no.
www.adanielectricity.com
helpdesk.mumbaielectricity@adani.com
GOREGAON (WEST). interruption
Give us a missed call on 1800 532 9998
complaint or from your registered mobile no.
Join us on,
restoration
MUMBAI 400090 status Whatsapp POWER <9 digit account no.>
to 9594519122 from any mobile number.
Mobile No 99******97
Email Id ma***sb@gmail.com Bill No. 100249464936 Bill Date 21-08-2020 Cycle No. 24
Connected Load in kW 0.96 Bill Distribution No. CENTRAL/CZ2-GOREGAON Type of Supply SINGLE
PAN (W)/24/804/020/007/002 PHASE
GSTIN
YOUR CURRENT CONSUMPTION
This electricity bill niether reflects a title nor is to be used as a proof of any property or premises.
BILL MONTH
JUL-20 TOTAL 17 49.30 70.00
DUE DATE
11.09.2020 TRACK YOUR CONSUMPTION (UNITS) ● Tentative meter reading date for your AUG-20 bill is 12-
09-2020.
IMPORTANT MESSAGE
1200
DUE AMOUNT
Units Amount (Rs.) Units Amount (Rs.)
` 330.00* MAY
APR
165
64
1387.1
467.8
275
276
2020.99
2028.70
Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY ORDER NO For Advertisement please contact on
CSD/62/2020/1461 dated 27.07.2020
info@seshaasai.com
PAY-IN SLIP FOR CHEQUE DROP
● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:151534198
● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.
24/804/020
b/f :162.90 007/002/C02
0151534198600000330110920200000034000000033028082020
Round Sum payable: ` 330.00 Discounted Amount(Round sum): ` 330.00 Amount after due date (Round sum): ` 340.00
JUL-20 151534198 /6/ Due date: 11.09.2020 Discount date: 28-08-2020
HOW YOUR BILL WAS CALCULATED Rate `
0151534198600000330110920200000034000000033028082020
Meter reading date 12-08-2020 *Above fixed charges are for single phase connections.Fixed charge of Rs 135 per month will be levied on residential consumers
Previous meter reading date 13-07-2020 availing 3 phase supply.Additional Fixed charge of Rs 135 per 10kW load or part thereof above 10kW load shall be payable.Temporary
supply consumers shall pay 1.5 times the Fixed Charges applicable for this category
As per Electricity Supply Code, you can also opt for your own meter Electricity Duty as per Govt. of Maharashtra Notification No. ELD.2015/CR 21/NGR-1 of 13-04-2015. Tax on Sale of Electricity as per
(adhering to BIS standards) Govt. of Maharashtra Notification No.VVK-2018/CR-161/Energy-1 of 26-12-2018
NOTE Rs. 10/- discount per month if you opt for Paperless E-Bill. No hard copy will be
generated. Log on to our website (www.adanielectricity.com) for more details
GSTN
Consumer Grievance Redressal Forum (CGRF) • Running your refrigerator at optimum temperature can help reduce
Only for grievances unresolved by IGRC,
reach Consumer Grievance Redressal Forum at
Adani Electricity, 1st Floor, Devidas Lane,
ENERGY
CONSERVATION TIPS
energy wastage.
• Ensuring usage of solar powered lights for outdoor lighting.
• Replacing conventional lighting fixtures with energy efficient ones.
Off SVP Road, Near Devidas Lane Telephone
Exchange, Borivali West, Mumbai 400 103
T 3009 4247
Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.
------------------------------------------------------------------------------------------------------------------------------------