You are on page 1of 2

24x7 Powerline CUSTOMER CARE CENTRE/CORRESPONDENCE

BILL OF SUPPLY RESIDENTIAL ADDRESS


We’re RNA Corporate Park, Old Kalamandir, Near Collector's Office, Bandra

19122 (East), Mumbai 400 051

RUMANIA OSWAULD PEREIRA listening.


H NO 43/1/ 1 MORA GAON
RUIA PARK Juhu,Santacruz (W) For power SMS POWER <9 digit account no.> to
7065313030 from any mobile no.
www.adanielectricity.com
helpdesk.mumbaielectricity@adani.com
JUHU interruption
Give us a missed call on 1800 532 9998
complaint or from your registered mobile no.
Join us on,
restoration
MUMBAI 400049 status Whatsapp POWER <9 digit account no.>
to 9594519122 from any mobile number.
Mobile No 72******97
Email Id dj*****78@gmail.com Bill No. 101773623423 Bill Date 02-06-2021 Cycle No. 13
Connected Load in kW 1.00 Bill Distribution No. Vandre/Juhu/13/607/028// Type of Supply SINGLE
PAN BN******5C PHASE
GSTIN
YOUR CURRENT CONSUMPTION
This electricity bill neither reflects a title nor is to be used as a proof of any property or premises.

To update your email Id and mobile no.,call us on 19122

ACCOUNT NO Tariff Meter Multiplying Energy consumption Energy Fixed


number Factor charge charge
(MF) Present Previous Consumption (`) (`)
153017323 reading reading (Unit kWh)
LT I (B) 8981079 1 567.00 324.00 243.00 1020.00 115.00

BILL MONTH
MAY-21 TOTAL 243.00 1020.00 115.00

DUE DATE
23.06.2021 TRACK YOUR CONSUMPTION (UNITS) ● Tentative meter reading date for your JUN-21 bill is 29-
06-2021.
● In view of MERC order in case no. 325 of 2019, cash
payment limit towards electricity bills is fixed at `.5,000/-

IMPORTANT MESSAGE
per account per month. For payment of amount greater than
`.5,000 please use convenient digital channels / online /
280 cheque modes.

Billing Last Year This Year


Month

DUE AMOUNT
Units Amount (Rs.) Units Amount (Rs.)

MAY 243 1791

APR 234 1722

` 1770.00* MAR 90 647

Refer Important Message Section

DISCOUNTED BILL AMOUNT


Round sum bill payable (after discount
of ` 14.90) on or before discount
date 09-06-2021 ` 1750.00

LATE PAYMENT BILL AMOUNT


Round sum bill payable (including
DPC of ` 22.39) after due
date 23.06.2021 ` 1790.00 #
*Refers only to current bill amount. Previous balance is
payable immediately.

#Payable until one month after due date, there after


interest applicable as per MERC tariff order.

Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY ORDER NO
CSD/320/2021/1293 dated 01.04.2021
PAY-IN SLIP FOR CHEQUE DROP

If paying by cheque, please remember:


● Cheque should be Account payee of local clearing and not post-dated

● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:153017323

● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.

13/607/028
b/f :13.85Cr //R01
0153017323800001770230620210000179000000175009062021
Round Sum payable: ` 1770.00 Discounted Amount(Round sum): ` 1750.00 Amount after due date (Round sum): ` 1790.00
MAY-21 153017323 /8/ Due date: 23.06.2021 Discount date: 09-06-2021
HOW YOUR BILL WAS CALCULATED Rate `
0153017323800001770230620210000179000000175009062021

Electrical Energy ( HSN Code 27160000)


Fixed Charge 115.00
Wheeling charge 354.78
Regulatory asset charge(RAC)## 0.00
Energy Charge 1020.00
Fuel Adjustment Charge (FAC)# (Refer Your Tariff 0.00
Structure below)
Government electricity duty 16.00 % 238.36
Maharashtra Govt. tax on sale of electricity 26.04 p/unit 63.28
Current month's bill amount (A) 1791.42
Others 0.00
Delayed Payment Charge on previous month's bill 0.00
Digital Payment Discount 3.58 Cr
Interest on arrears 0.00
Adjustments 0.00
Net Other Charges in current bill (B) 3.58 Cr
Current Month charges (A+B) 1787.84
Previous month's bill amount 1726.15
Payment received upto 27.05.2021 1740.00
Prompt Payment Discount 0.00
Net previous balance(C) 13.85 Cr
Total bill amount(A+B+C) 1773.99
Amount deferred 0.00
#FAC is being included in your monthly charges in accordance with MERC MYT Regulations, 2019.##RAC are included in this
bill as they continue to apply for consumption till 31.03.2020.
For Correspondence Address kindly refer the Front Page Customer Care Centre address.
AEML CIN U74999GJ2008PLC107256

Regd. Office: Adani Electricity Mumbai Ltd.


Adani Corporate House, Shantigram, Near Vaishno Devi Circle, S. G. Highway, Khodiyar Ahmedabad, Gujarat, India - 382421

ROUND SUM KEEP A WATCH TO MANAGE YOUR ENERGY CONSUMPTION


PAYABLE Your tariff structure (Effective from 01.04.2021)
WITH THIS BILL 1770.00 Tariff Tariff slabs Fixed Charge Energy Charge Wheeling charges RA charge FAC rate Paise/unit

LT I (B):LT- `/month `/unit `/unit `/unit MAY-21


Residential

Your security deposit 120.00 0-100 75 3.05 1.46 0.00 0.00


(SD) with us
101-300 115 5.00 1.46 0.00 0.00
Your unpaid security 301-500 115 6.65 1.46 0.00 0.00
deposit (SD) > 500(balance 140 7.80 1.46 0.00 0.00
units)
PAN AADCD0086F

Meter reading date 31-05-2021 *Above fixed charges are for single phase connections.Fixed charge of Rs 140 per month will be levied on residential consumers
Previous meter reading date 30-04-2021 availing 3 phase supply.Additional Fixed charge of Rs 140 per 10kW load or part thereof above 10kW load shall be payable.Temporary
supply consumers shall pay 1.5 times the Fixed Charges applicable for this category
Electricity Duty as per Govt. of Maharashtra Notification No. ELD/2003/CR 52/NGR-2 of 31-03-2003. Tax
As per Electricity Supply Code, you can also opt for your own meter on sale of Electricity as per Govt. of Maharashtra Notification No: MAHBIL/2009/37831.
(adhering to BIS standards)

NOTE Rs. 10/- discount per month if you opt for Paperless E-Bill. No hard copy will be
generated. Log on to our website (www.adanielectricity.com) for more details
• To pay online, visit www.adanielectricity.com
GSTN

• Get 7% interest on VDS (reducing balance) As per MERC, Interest on Security Deposit is at the bank rate
declared by RBI as on 1st April of the financial year.
If paying by cheque, please remember For FY 2021-22,it is 4.25%.
• Cheque payment subject to realization, any dishonored cheque will
27AADCD0086F1ZW

- Result in payment of bills by DD for subsequent 6 months


- Attract a penal amount of `250 per bill Power theft results in power tariff hike - Report them
Honest citizens bear the cost of power stolen by unauthorized elements.
If you spot an electrical theft, please report on 19122.

Consumer Grievance Redressal Forum (CGRF) • Running your refrigerator at optimum temperature can help reduce
Reach Consumer Grievance Redressal Forum at
Adani Electricity, 1st Floor, Devidas Lane,
Off SVP Road, Near Devidas Lane Telephone
ENERGY
CONSERVATION TIPS
energy wastage.
• Ensuring usage of solar powered lights for outdoor lighting.
• Replacing conventional lighting fixtures with energy efficient ones.
Exchange, Borivali West, Mumbai 400 103

T 022-50745004

E Consumerforum.Mumbaielectricity@adani.com
PLEASE REMEMBER
W cgrf.adanielectricity.com
Using electricity connection for purposes other than that provided for is a tariff violation and may lead to
Electricity Ombudsman :
disconnection/penal action as per law.
606, Keshva Building, 6th Floor, Bandra Kurla Complex,(BKC),
Bandra (East), Mumbai – 400 051 Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.
Maharashtra state

E electricityombudsmanmumbai@gmail.com Please quote your account no.153017323in all your correspondence.


T 022-49691092

------------------------------------------------------------------------------------------------------------------------------------

You might also like