You are on page 1of 2

24x7 Powerline CUSTOMER CARE CENTRE/CORRESPONDENCE

BILL OF SUPPLY RESIDENTIAL ADDRESS


We’re 2nd floor ,MB Trade center, Near Railway Phatak, Bhaindar (E), Dist-

19122 Thane,401105

CHAKREY DEVENDRA listening.


SHOP 104/A, SURBHI COMPLEX SMS POWER <9 digit account no.> to www.adanielectricity.com
For power 7065313030 from any mobile no. helpdesk.mumbaielectricity@adani.com
KHARIGON OPP BALAJI APARTMENT interruption,
Give us a missed call on 1800 532 9998 Join us on,
complaint or from your registered mobile no.
THANE 401105 restoration
Whatsapp POWER <9 digit account no.>
status to 9594519122 from any mobile number.

Mobile No
Bill No. 101354391692 Bill Date 20-12-2021 Cycle No. 09
Email Id
Bill Distribution No. NORTH/NZ3-BHAINDAR Type of Supply SINGLE
PAN (E)/09/309/001/001/001 PHASE
GSTIN

YOUR CURRENT CONSUMPTION


This electricity bill niether reflects a title nor is to be used as a proof of any property or premises.

To update your email Id and mobile no.,call us on 19122


Tariff Meter Multiplying Energy consumption Energy Fixed
number Factor charge charge
(MF) Present Previous Consumption (`) (`)
ACCOUNT NO reading reading (Unit kWh)
LT I (B) RS0967 1 3304.00 3244.00 60.00 174.00 70.00
085284369 4495

BILL MONTH TOTAL 60.00 174.00 70.00

DEC-20 TRACK YOUR CONSUMPTION (UNITS) ● Tentative meter reading date for your OCT-20 bill is 26-
10-2020.
● In view of MERC order in case no. 325 of 2019, cash payment limit
towards electricity bills is fixed at `.5,000/- per account per month.
DUE DATE

IMPORTANT MESSAGE
For payment of amount greater than `.5,000 please use convenient
digital channels / online / cheque modes.
20.01.2022

Billing Last Year This Year


Month
Units Amount (Rs.) Units Amount (Rs.)

560 SEP 70 505 60 408

AUG 76 541 63 424

JUL 78 554 71 468

JUN 47 364 80 517

DUE AMOUNT MAY

APR
62

91
456

629
80

85
517

555

` 410.00* Refer Important Message Section

DISCOUNTED BILL AMOUNT


Round sum bill payable (after discount
of ` :3.38) on or before discount
date 06-10-2020 ` 410.00

LATE PAYMENT BILL AMOUNT


Round sum bill payable (including
DPC of ` :5.10) after due
date 20.10.2020 ` 420.00 #
*Refers only to current bill amount. Previous balance is
payable immediately.

#Payable until one month after due date, there after


interest applicable as per MERC tariff order.

Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY ORDER NO
CSD/62/2020/1461 dated 27.07.2020
PAY-IN SLIP FOR CHEQUE DROP

If paying by cheque, please remember:


● Cheque should be Account payee of local clearing and not post-dated

● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:152384939

● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.

09/309/001
b/f :8.04 001/001/J01
0152384939600000410201020200000042000000041006102020
Round Sum payable: ` 410.00 Discounted Amount(Round sum): ` 410.00 Amount after due date (Round sum): ` 420.00
SEP-20 152384939 /6/ Due date: 20.10.2020 Discount date: 06-10-2020
HOW YOUR BILL WAS CALCULATED Rate `
0152384939600000410201020200000042000000041006102020

Electrical Energy ( HSN Code 27160000)


Fixed Charge 70.00
Wheeling charge 94.20
Regulatory asset charge(RAC)## 0.00
Energy Charge 174.00
Fuel Adjustment Charge (FAC)# 0.00
Government electricity duty 16.00 % 54.11
Maharashtra Govt. tax on sale of electricity 26.04 p/unit 15.62
Current month's bill amount (A) 407.93
Others 0.00
Delayed Payment Charge on previous month's bill 0.00
Digital Payment Disocunt 0.88 Cr
Interest on arrears 0.00
Adjustments 0.00
Net Other Charges in current bill (B) 0.88 Cr
Current Month charges (A+B) 407.05
Previous month's bill amount 898.04
Payment received upto 19.09.2020 890.00
Prompt Payment Discount 0.00
Net previous balance(C) 8.04
Total bill amount(A+B+C) 415.09
Amount deferred 0.00
#FAC is being included in your monthly charges in accordance with MERC MYT Regulations, 2019.##RAC are included in this
bill as they continue to apply for consumption till 31.03.2020.
For Correspondence Address kindly refer the Front Page Customer Care Centre address.
AEML CIN U74999GJ2008PLC107256

Adani Corporate House, Shantigram, Near Vaishno Devi Circle, S. G. Highway, Khodiyar Ahmedabad, Gujarat, India - 382421
Regd. Office : Adani Electricity Mumbai Ltd.

ROUND SUM KEEP A WATCH TO MANAGE YOUR ENERGY CONSUMPTION


PAYABLE Your tariff structure (Effective from 01.04.2021)
WITH THIS BILL 410.00 Tariff Tariff slabs Fixed Charge Energy Charge Wheeling charges RA charge FAC rate Paise/unit

LT I (B):LT- `/month `/unit `/unit `/unit SEP-20


Residential
Your security deposit 120.00
0-100 70 2.90 1.46 0.00 0.00
(SD) with us
101-300 110 4.85 1.46 0.00 0.00
Your unpaid security 301-500 110 6.65 1.46 0.00 0.00
deposit (SD)
> 500(balance 135 7.80 1.46 0.00 0.00
units)
Meter reading date
PAN AADCD0086F

24-09-2020
*Above fixed charges are for single phase connections.Fixed charge of Rs 140 per month will be levied on residential consumers
Previous meter reading date 26-08-2020 availing 3 phase supply.Additional Fixed charge of Rs 140 per 10kW load or part thereof above 10kW load shall be payable.Temporary
supply consumers shall pay 1.5 times the Fixed Charges applicable for this category
As per Electricity Supply Code, you can also opt for your own meter
(adhering to BIS standards) Electricity Duty as per Govt. of Maharashtra Notification No. ELD.2015/CR 21/NGR-1 of 13-04-2015. Tax on Sale of Electricity as per
Govt. of Maharashtra Notification No.VVK-2018/CR-161/Energy-1 of 26-12-2018

NOTE Rs. 10/- discount per month if you opt for Paperless E-Bill. No hard copy will be
• To pay online, visit www.adanielectricity.com generated. Log on to our website (www.adanielectricity.com) for more details
• Get 7% interest on VDS (reducing balance)
GSTN

As per MERC, Interest on Security Deposit is at the bank rate


If paying by cheque, please remember declared by RBI as on 1st April of the financial year.
• Cheque payment subject to realization, any dishonored cheque will For FY 2021-22,it is 4.25%.
- Result in payment of bills by DD for subsequent 6 months
27AADCD0086F1ZW

- Attract a penal amount of `250 per bill Power theft results in power tariff hike - Report them
Honest citizens bear the cost of power stolen by unauthorized elements.
If you spot an electrical theft, please report on 19122.

Consumer Grievance Redressal Forum (CGRF) • Running your refrigerator at optimum temperature can help reduce
Reach Consumer Grievance Redressal Forum at
Adani Electricity, 1st Floor, Devidas Lane,
Off SVP Road, Near Devidas Lane Telephone
ENERGY
CONSERVATION TIPS
energy wastage.
• Ensuring usage of solar powered lights for outdoor lighting.
• Replacing conventional lighting fixtures with energy efficient ones.
Exchange, Borivali West, Mumbai 400 103

T 022-50745004

E Consumerforum.Mumbaielectricity@adani.com
PLEASE REMEMBER
W cgrf.adanielectricity.com
Using electricity connection for purposes other than that provided for is a tariff violation and may lead to
Electricity Ombudsman :
disconnection/penal action as per law.
606, Keshva Building, 6th Floor, Bandra Kurla Complex,(BKC),
Bandra (East), Mumbai – 400 051 Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.
Maharashtra state

E electricityombudsmanmumbai@gmail.com Please quote your account no.152384939 in all your correspondence.

------------------------------------------------------------------------------------------------------------------------------------

You might also like