You are on page 1of 7

DESALINATED WATER SUPPLY FOR

SPENCE GROWTH OPTIONS PROJECT

FAT Procedure for the valve


Doc. Nº: SGO-NPIW-EXE-GNR-QFE-01339
Revision: 0 Date: 23/07/2020
DESALINATED WATER SUPPLY FOR
CAITAN PROJECT

Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 2 of 7

CHANGE LOG

SECTION / PARAGRAPH
REV. DATE AFFECTED REASONS FOR CHANGE
____ _______ _____________________ ___________________________
_ __
0 23/07/20 Original Document Issued for review

TEDAGUA Doc. No.: SGO-NPIW-EXE-GNR-QFE-01339

DESALINATE WATER SUPPLY FOR CAITAN PROJECT

0 23/07/2020 Issued for review E. Venegas P.Valenzuela G. Salas

Rev. Date Description Prepared Checked Approved


DESALINATED WATER SUPPLY FOR
CAITAN PROJECT

Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 3 of 7

I. General Information

Customer:
Attention:
Service Specification:

Date:
Inspection Representative:

II. Objetive

Hydrostatic test procedure to Knife Gate Valve Size 48" Class 150. With the purpose of verifying the correct leakage
of Body and Seal.

III. Engineering Design

 Pressures.
The Knife Valve will have the following characteristics:

Design Pressures Testing Pressures

Body 60 PSI 60 PSI

Seals 60 PSI 60 PSI

 Water conditions.

Temperature Balance PH Turbidity

3ºC a 24ºC 6,5 < pH < 8,5 <10UNT


DESALINATED WATER SUPPLY FOR
CAITAN PROJECT

Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 4 of 7

IV. Test Method

The purpose of the pressure test is to ensure and guarantee uniform watertightness in the valve in "fully open"
and "fully closed" service condition under previously defined parameters.

The valve will be tested in the body at 60 PSI for a minimum period of 3 minutes. Valve completely open, with a
blind Flange in the Input and Output of the valve. The procedure will be monitored with a certified pressure gauge
mounted on the Valve's Inlet Flange. To generate the test pressure a manual pump will be used until reaching 60
PSI without leakage or pressure loss for a period of 3 minutes.

The valve will be tested in the Seals at 60 PSI for a minimum period of 3 minutes. Valve completely open, with a
blind Flange in the Input and Output of the valve. The procedure will be monitored with a certified pressure gauge
mounted on the Valve's Inlet Flange. To generate the test pressure a manual pump will be used until reaching 60
PSI without leakage or pressure loss for a period of 3 minutes.

Each test stage will be recorded by photograph (minimum 3), indicating the pressure and start time, Pressure and
end time, pressure in the Valve.

V. Equipment Considered in Test

 Manual Pump
 Blind Flange Size 48” ANSI B16,47
 Blind Flange Size 48” ANSI B16,47
 Open Flange Size 48”
 Thread Stud 1-1/2”UNC
 Nuts 1-1/2”UNC
 Golilla
1. The procedure can be performed in our workshop or in customer facilities considering an air compressor,
water and three-phase electric power for the electric actuator power.

VI. Body Test Procedure

1. Previous Visual Inspection


The valve will be completely checked before the procedure to detect possible damage to Splice Face (RF)
or shocks in the flanges and body area.

2. Purge Test
The valve will be filled with water with a defined pressure in order to evacuate the maximum air into the
body. The end of test will be determined by the full air outlet. The air will be evacuated through the test
bench and a purge valve.
DESALINATED WATER SUPPLY FOR
CAITAN PROJECT

Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 5 of 7

3. Preliminary Body Test


The objectives of the preliminary test are: 1) detect possible water leaks, 2) ensure all connections in
Flanges and pipes for further main testing. Depressurize to atmospheric pressure.

4. Principal Test
The principal test will be performed with the defined test pressure approximately 10 minutes, with the
Test Bench, the test pressure will be held in the valve to verify the behavior of the body
To validate the test, no leakage should be observed as long as the pressure is constant.

5. Test Registration by Equipment

Date Approved
Start Time Test
TAG NUMBER Month / (V°B°)
Time for End Pressure
Day Quality

1 / : :
DESALINATED WATER SUPPLY FOR
CAITAN PROJECT

Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 6 of 7
VII. Seals Test Procedure

1. Previous Visual Inspection


The valve will be completely checked before the procedure to detect possible damage in the Seat, Seals,
Stem Packing, to Splice Face (RF) or shocks in the flanges and body area.

2. Purge Test
The valve will be filled with water with a defined pressure in order to evacuate the maximum air into the
body. The end of test will be determined by the full air outlet. The air will be evacuated through the test
bench and a purge valve.

3. Preliminary Seals Test


The objectives of the preliminary test are: 1) detect possible water leaks in all seals and seat, 2) ensure all
connections in Flanges and pipes for further main testing. Depressurize to atmospheric pressure.

4. Principal Test
The principal test will be performed with the defined test pressure approximately 3 minutes, with the
Test Bench, the test pressure will be held in the valve to verify the behavior of the body
To validate the test, no leakage should be observed as long as the pressure is constant.

5. Test Registration by Equipment

Date Approved
Start Time Test
TAG NUMBER Month / (V°B°)
Time for End Pressure
Day Quality

1 / : :
DESALINATED WATER SUPPLY FOR
CAITAN PROJECT

Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 7 of 7
VIII. Validation of tests

After the positive execution of the hydrostatic tests, the manufacturer will prepare and provide the customer a Test Report (of
conformity) the performed tests as guarantee for the customer or end user.