Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 2 of 7
CHANGE LOG
SECTION / PARAGRAPH
REV. DATE AFFECTED REASONS FOR CHANGE
____ _______ _____________________ ___________________________
_ __
0 23/07/20 Original Document Issued for review
Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 3 of 7
I. General Information
Customer:
Attention:
Service Specification:
Date:
Inspection Representative:
II. Objetive
Hydrostatic test procedure to Knife Gate Valve Size 48" Class 150. With the purpose of verifying the correct leakage
of Body and Seal.
Pressures.
The Knife Valve will have the following characteristics:
Water conditions.
Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 4 of 7
The purpose of the pressure test is to ensure and guarantee uniform watertightness in the valve in "fully open"
and "fully closed" service condition under previously defined parameters.
The valve will be tested in the body at 60 PSI for a minimum period of 3 minutes. Valve completely open, with a
blind Flange in the Input and Output of the valve. The procedure will be monitored with a certified pressure gauge
mounted on the Valve's Inlet Flange. To generate the test pressure a manual pump will be used until reaching 60
PSI without leakage or pressure loss for a period of 3 minutes.
The valve will be tested in the Seals at 60 PSI for a minimum period of 3 minutes. Valve completely open, with a
blind Flange in the Input and Output of the valve. The procedure will be monitored with a certified pressure gauge
mounted on the Valve's Inlet Flange. To generate the test pressure a manual pump will be used until reaching 60
PSI without leakage or pressure loss for a period of 3 minutes.
Each test stage will be recorded by photograph (minimum 3), indicating the pressure and start time, Pressure and
end time, pressure in the Valve.
Manual Pump
Blind Flange Size 48” ANSI B16,47
Blind Flange Size 48” ANSI B16,47
Open Flange Size 48”
Thread Stud 1-1/2”UNC
Nuts 1-1/2”UNC
Golilla
1. The procedure can be performed in our workshop or in customer facilities considering an air compressor,
water and three-phase electric power for the electric actuator power.
2. Purge Test
The valve will be filled with water with a defined pressure in order to evacuate the maximum air into the
body. The end of test will be determined by the full air outlet. The air will be evacuated through the test
bench and a purge valve.
DESALINATED WATER SUPPLY FOR
CAITAN PROJECT
Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 5 of 7
4. Principal Test
The principal test will be performed with the defined test pressure approximately 10 minutes, with the
Test Bench, the test pressure will be held in the valve to verify the behavior of the body
To validate the test, no leakage should be observed as long as the pressure is constant.
Date Approved
Start Time Test
TAG NUMBER Month / (V°B°)
Time for End Pressure
Day Quality
1 / : :
DESALINATED WATER SUPPLY FOR
CAITAN PROJECT
Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 6 of 7
VII. Seals Test Procedure
2. Purge Test
The valve will be filled with water with a defined pressure in order to evacuate the maximum air into the
body. The end of test will be determined by the full air outlet. The air will be evacuated through the test
bench and a purge valve.
4. Principal Test
The principal test will be performed with the defined test pressure approximately 3 minutes, with the
Test Bench, the test pressure will be held in the valve to verify the behavior of the body
To validate the test, no leakage should be observed as long as the pressure is constant.
Date Approved
Start Time Test
TAG NUMBER Month / (V°B°)
Time for End Pressure
Day Quality
1 / : :
DESALINATED WATER SUPPLY FOR
CAITAN PROJECT
Doc. SGO-NPIW-EXE-GNR-GFE-01131
Rev. 1 Date: 19-05-2020
Page 7 of 7
VIII. Validation of tests
After the positive execution of the hydrostatic tests, the manufacturer will prepare and provide the customer a Test Report (of
conformity) the performed tests as guarantee for the customer or end user.