You are on page 1of 6

< 5m/S

AREA Q. TUBO
AREA DIAMETR COTAS CLAVES
TRAMO DRENADA CAUDALDIAMETRO PENDIENTE V. TUBO LLENO Ft Q/qo LONGITUD CAIDA
Ident. DRENADA ACUM
O REAL LLENO Vr/Vo Vr ENTRADA

DE A (m2) (m2) (Lts/seg) (pulg) (pulg) (%) (lts/seg) (m/seg) Kg/m2 <0.85 (m) (m) INICIAL FINAL
CALCULO COLECTORES ALL - VER PLANO ALL-PLUVIAL
T1 T2 Inicial 20.00 20.00 0.63 3 2.88 4.00 6.47 1.54 0.86 0.10 0.534 0.82 5.20 0.21 -0.15 -0.36
T2 T3 25.00 45.00 1.41 3 2.88 2.00 4.58 1.09 0.86 0.31 0.740 0.81 9.33 0.19 -0.36 -0.54
T3 T4 31.24 76.24 2.38 4 3.9 2.00 10.33 1.34 0.51 0.23 0.673 0.90 3.00 0.06 -0.54 -0.60
T4 T5 29.00 105.24 3.29 4 3.9 1.50 8.94 1.16 0.38 0.37 0.785 0.91 9.40 0.14 -0.60 -0.75
T5 CI#1 28.20 133.44 4.17 4 3.9 1.50 8.94 1.16 0.38 0.47 0.853 0.99 1.50 0.02 -0.75 -0.77
CI#1 CI#2 66.43 199.87 6.25 6 5.84 0.50 15.03 0.87 0.42 0.820 0.71 25.00 0.13 -0.77 -0.89
CI#2 CI#3 88.32 288.19 9.01 6 5.84 1.00 21.43 1.24 0.38 0.42 0.820 1.02 12.60 0.13 -0.89 -1.02
CI#3 CI#7 0.00 288.19 9.01 6 5.84 1.00 21.43 1.24 0.38 0.42 0.820 1.02 15.83 0.16 -1.02 -1.18

SL1 SL 2 Inicial 108.19 108.19 3.38 4 3.9 1.00 7.24 0.94 0.25 0.47 0.853 0.80 4.00 0.04 -0.15 -0.19 ###
SL 2 SL 3 112.47 220.66 6.90 4 3.9 1.00 7.24 0.94 0.38 0.95 1.036 0.97 4.00 0.04 -0.19 -0.23
SL 3 SL 4 135.21 355.87 11.12 4 5.84 1.00 21.43 1.24 0.38 0.52 0.871 1.08 5.80 0.06 -0.23 -0.29
SL 4 SL 5 115.20 471.07 14.72 6 5.84 1.00 21.43 1.24 0.38 0.69 0.950 1.18 4.00 0.04 -0.29 -0.33
SL 5 SL 6 91.16 562.23 17.57 6 5.84 1.00 21.43 1.24 0.38 0.82 1.000 1.24 4.00 0.04 -0.33 -0.37
SL 6 CI#4 152.56 714.79 22.34 6 5.84 1.00 21.43 1.24 0.38 1.04 1.044 1.29 25.30 0.25 -0.37 -0.62
0.00
T6 T7 Inicial 20.00 20.00 0.63 3 2.88 4 6.47 1.54 0.86 0.10 0.534 0.82 6.67 0.27 -0.15 -0.42
T7 T8 22.16 42.16 1.32 3 2.88 1.5 3.95 0.94 0.57 0.33 0.813 0.76 6.00 0.09 -0.42 -0.51
T8 T9 30.62 72.78 2.27 4 3.9 2 10.33 1.34 0.51 0.22 0.664 0.89 14.86 0.30 -0.51 -0.80
T9 CI#4 69.45 142.23 4.44 4 3.9 1.5 8.94 1.16 0.38 0.50 0.861 1.00 3.00 0.05 -0.80 -0.85
CI#4 CI#5 48.12 905.14 28.29 8 7.7 0.6 34.55 1.15 0.51 0.82 1.000 1.15 21.18 0.13 -0.85 -0.98
CI#5 CI#6 88.09 993.23 31.04 8 7.7 0.6 34.55 1.15 0.51 0.90 0.950 1.09 22.67 0.14 -0.98 -1.11
CI#6 CI#7 0.00 993.23 31.04 8 7.7 1 44.76 1.49 0.51 0.69 0.950 1.42 10.84 0.11 -1.11 -1.22
PZ AL
CI#7 288.19 1281.42 40.04 8 7.7 1 44.76 1.49 0.51 0.89 1.022 1.52 42.60 0.43 -1.22 -1.65
PLL
Q=CxIxA
Q= CAUDAL POR BAJANTE: (lts/seg) TIPO 1
C=COEFICIENTE DE IMPERMEABILIDAD: 0.9 C Cubiertas MATERIAL PVC
I=INTENSIDAD DE LA LLUVIA: 125 (mm/hora) C MANINNI 0.01
A=AREA TRIBUTARIA: (m2)

Sector Coeficiente de Impermeabilidad o Escorrentía (C) C


1. Cubiertas 0.90
2. Pavimentos asfálticos y superficies de concreto 0.90
3. Zonas comerciales o industriales. 0.90
4. Residencial, con casas contiguas, predominio de zonas duras 0.75
5. Residencial multifamiliar, con bloques contiguos y zonas duras entre estos 0.75
6. Residencial unifamiliar, con casas contiguas y predominio de jardines 0.60
7. Residencial, con casas rodeadas de jardines o multifamiliares apreciablemente separados 0.45
BAJANTE AREA AREA Q DIAMETRO DIAMETRO LONG.
AGUAS DRENADA CAPACIDAD CAUDAL NECESARIO DE DISEÑO
(m)
LLUVIAS No. (m2) MÁX (m2) (lts/seg) (Plg) (pulg)
1 20.00 200 0.69 1.53 3 3
2 20.00 200 0.69 1.53 3 3
3 22.16 200 0.77 1.59 3 3
4 30.62 200 1.06 1.79 3 3
5 69.45 200 2.41 2.43 3 3
6 48.12 200 1.67 2.12 3 3
7 54.73 200 1.90 2.23 3 3
8 33.36 200 1.16 1.85 3 3
9 33.97 200 1.18 1.86 3 3
10 54.35 200 1.89 2.22 3 3
11 29.42 200 1.02 1.76 3 3
12 37.01 200 1.29 1.92 3 3
13 28.20 200 0.98 1.74 3 3
14 29.00 200 1.01 1.75 3 3
15 31.24 200 1.08 1.80 3 3
16 25.00 200 0.87 1.66 3 3
566.63
Q=CxIxA
Q= CAUDAL POR BAJANTE: (lts/seg)
C=COEFICIENTE DE PERMEABILIDAD: 1 Para Cubiertas
I=INTENSIDAD DE LA LLUVIA: 125 (mm/hora)
A=AREA TRIBUTARIA: (m2)
TIPO MATERIAL N MANING
1 PVC -SANITARIA 0.010
CAUDAL (l/s) DIMENSIÓN PEND. DISEÑO RELACIONES HIDRA
TRAMO
DIÁMETRO DIÁMETRO
UNIDADES LONG. S Qo Vo Ft
Q (l/s) NOMINAL REAL Q/Qo Y/ɸr
INI FIN PROPIAS ACUM.MAXIMAS m Pulg m Pulg m % I/s m/s Kg/m2
CI #1 CI #2 17 17 160 2.08 12.52 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.410 0.502
CI #2 CI #3 17 34 160 2.73 12.52 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.540 0.587
CI #3 CI #4 17 51 160 3.23 17.65 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.630 0.644
CI #4 CI #5 17 68 160 3.66 12.05 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.720 0.702
CI #5 CI #6 17 85 160 3.9 12.08 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.770 0.735
CI #6 CI #10 17 102 160 4.23 13.72 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.830 0.775
CI #7 CI #8 8 8 160 1.69 3.7 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.330 0.446
CI #8 CI #9 10 18 160 2.09 7.02 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.410 0.502
CI #9 CI #10 13 31 160 2.55 6 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.500 0.561
CI #10 CI #13 0 133 620 4.68 14.63 6 0.1524 5.7 0.14478 1 17.94 1.09 0.38 0.260 0.393
CI #11 CI #12 48 48 160 3.2 2.23 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.630 0.644
CI #12 CI #13 22 70 160 3.66 4.9 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.720 0.702
CI #13 CI #26 0 203 620 5.64 16.93 6 0.1524 5.7 0.14478 1 17.94 1.09 0.38 0.310 0.432
CI #14 CI #16 33 33 160 2.73 4.17 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.540 0.587
CI #15 CI #16 33 33 160 2.73 4.16 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.540 0.587
CI #16 CI #17 0 66 160 3.64 4.11 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.720 0.702
CI #17 CI #18 0 66 160 3.64 12.2 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.720 0.702
CI #18 CI #19 0 66 160 3.64 10.44 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.720 0.702
CI #19 CI #22 0 66 160 3.64 7.38 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.720 0.702
CI #20 CI #22 16 16 160 1.99 9.2 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.390 0.488
CI #21B CI #21 48 48 160 3.2 6.56 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.630 0.644
CI #21A CI #21 48 48 160 3.2 1.51 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.630 0.644
CI #21 CI #22 0 96 160 4.16 3.16 4 0.1016 3.9 0.09906 0.6 5.09 0.66 0.15 0.820 0.768
CI #22 CI #23 0 178 620 5.4 6.7 6 0.1524 5.7 0.14478 1 17.94 1.09 0.38 0.300 0.424
CI #23 CI #24 13 191 620 5.6 7.93 6 0.1524 5.7 0.14478 1 17.94 1.09 0.38 0.310 0.432
CI #24 CI #25 26 217 620 5.8 7.53 6 0.1524 5.7 0.14478 1 17.94 1.09 0.38 0.320 0.439
CI #25 CI #26 26 243 620 7.31 21.93 6 0.1524 5.7 0.14478 1 17.94 1.09 0.38 0.410 0.502
CI #26 CI #27 0 446 620 8.35 33.12 8 0.2032 7.7 0.19558 1 40.26 1.34 0.38 0.210 0.352
CI #27 CP 0 446 620 8.35 11.7 8 0.2032 7.7 0.19558 1 40.26 1.34 0.38 0.210 0.452

6 PUL 4 PULG 8 PUL


TUB (PULG) Dreal 75.65 167.28 44.82

1 1/2
2
3
4 3.9
6 5.7
8 7.7
10 8.9
RELACIONES HIDRAÚLICAS COTAS

CAÍD PROFUNDIAD
Vreal Y TERRENO CLAVE
Vr/Vo D/ɸ A DE TUBERÍA
INICIA FINA INICIA FINA INICIA FINA
m/s m m
L L L L L L
0.813 0.395 0.54 0.075 0.04973 0 0 -0.30 -0.38 0.30 0.38
0.881 0.487 0.58 0.075 0.05815 0 0 -0.38 -0.45 0.38 0.45
0.924 0.559 0.61 0.106 0.06379 0 0 -0.45 -0.56 0.45 0.56
0.963 0.644 0.64 0.072 0.06954 0 0 -0.56 -0.63 0.56 0.63
0.982 0.700 0.65 0.072 0.07281 0 0 -0.63 -0.70 0.63 0.70
1.03 0.783 0.68 0.082 0.07677 0 0 -0.70 -0.78 0.70 0.78
0.755 0.341 0.50 0.022 0.04418 0 0 -0.3 -0.32 0.30 0.32
0.813 0.395 0.54 0.042 0.04973 0 0 -0.32 -0.36 0.32 0.36
0.861 0.458 0.57 0.036 0.05557 0 0 -0.36 -0.40 0.36 0.40
0.699 0.294 0.76 0.146 0.0569 0 0 -0.78 -0.93 0.78 0.93
0.924 0.559 0.61 0.013 0.06379 0 0 -0.3 -0.31 0.30 0.31
0.963 0.644 0.64 0.029 0.06954 0 0 -0.31 -0.34 0.31 0.34
0.74 0.328 0.81 0.169 0.06254 0 0 -0.93 -1.10 0.93 1.10
0.881 0.487 0.58 0.025 0.05815 0 0 -0.3 -0.33 0.30 0.33
0.881 0.487 0.58 0.025 0.05815 0 0 -0.3 -0.32 0.30 0.32
0.963 0.644 0.64 0.025 0.06954 0 0 -0.33 -0.35 0.33 0.35
0.963 0.644 0.64 0.073 0.06954 0 0 -0.35 -0.42 0.35 0.42
0.963 0.644 0.64 0.063 0.06954 0 0 -0.42 -0.49 0.42 0.49
0.963 0.644 0.64 0.044 0.06954 0 0 -0.49 -0.53 0.49 0.53
0.799 0.381 0.53 0.055 0.04834 0 0 -0.3 -0.36 0.30 0.36
0.924 0.559 0.61 0.039 0.06379 0 0 -0.3 -0.34 0.30 0.34
0.924 0.559 0.61 0.009 0.06379 0 0 -0.3 -0.31 0.30 0.31
1.00 0.767 0.66 0.019 0.07608 0 0 -0.34 -0.36 0.34 0.36
0.732 0.321 0.80 0.067 0.06139 0 0 -0.53 -0.60 0.53 0.60
0.74 0.328 0.81 0.079 0.06254 0 0 -0.60 -0.68 0.60 0.68
0.747 0.334 0.81 0.075 0.06356 0 0 -0.68 -0.75 0.68 0.75
0.813 0.395 0.89 0.219 0.07268 0 0 -0.75 -0.97 0.75 0.97
0.655 0.258 0.88 0.331 0.06884 0 0 -1.10 -1.43 1.10 1.43
0.655 0.258 0.88 0.117 0.0884 0 0 -1.43 -1.55 1.43 1.55
BAJANTE AREA AREA Q DIAMETRO DIAMETRO LONG.
AGUAS DRENADA CAPACIDAD CAUDAL NECESARIO DE DISEÑO
(m)
LLUVIAS No. (m2) MÁX (m2) (lts/seg) (Plg) (pulg)
1 14.10 200 0.71 1.54 3 3
16 14.10 200 0.71 1.54 3 3
28.20
Q=CxIxA
Q= CAUDAL POR BAJANTE: (lts/seg)
C=COEFICIENTE DE PERMEABILIDAD: 1 Para Cubiertas
I=INTENSIDAD DE LA LLUVIA: 180 (mm/hora)
A=AREA TRIBUTARIA: (m2)
< 5m/S
AREA Q. TUBO
AREA DIAMETR COTAS CLAVES
TRAMO DRENADA CAUDALDIAMETRO PENDIENTE V. TUBO LLENO Ft Q/qo LONGITUD CAIDA
Ident. DRENADA ACUM
O REAL LLENO Vr/Vo Vr ENTRADA

DE A (m2) (m2) (Lts/seg) (pulg) (pulg) (%) (lts/seg) (m/seg) Kg/m2 <0.85 (m) (m) INICIAL FINAL
CALCULO COLECTORES ALL - VER PLANO ALL-PLUVIAL
C#1 C#1 Inicial 14.10 14.10 0.64 3 2.88 2.00 4.58 1.09 0.38 0.14 0.534 0.58 2.00 0.04 -0.15 -0.19

C#2 C#2 Inicial 14.10 14.10 0.64 3 2.88 2.00 4.58 1.09 0.38 0.14 0.853 0.93 1.70 0.03 -0.15 -0.18 ###
0.00
TP#1 TP#1 Inicial 30.41 30.41 1.37 2 1.9 2 1.52 0.83 0.38 0.90 0.534 0.44 0.30 0.01 -0.15 -0.16
TP#2 TP#2 Inicial 17.37 17.37 0.78 2 1.9 2 1.52 0.83 0.38 0.52 1.534 1.27 0.30 0.01 -0.15 -0.16
TP#3 TP#3 Inicial 11.73 11.73 0.53 2 1.9 2 1.52 0.83 0.38 0.35 2.534 2.10 0.30 0.01 -0.15 -0.16
TP#4 TP#4 Inicial 7.60 7.60 0.34 2 1.9 2 1.52 0.83 0.38 0.23 3.534 2.93 0.30 0.01 -0.15 -0.16
TP#5 TP#5 Inicial 10.81 10.81 0.49 2 1.9 2 1.52 0.83 0.38 0.32 4.534 3.76 0.30 0.01 -0.15 -0.16
TP#6 TP#6 Inicial 22.64 22.64 1.02 2 1.9 2 1.52 0.83 0.38 0.67 5.534 4.59 0.30 0.01 -0.15 -0.16
TP#7 TP#7 Inicial 20.00 20.00 0.90 2 1.9 2 1.52 0.83 0.38 0.59 6.534 5.42 0.30 0.01 -0.15 -0.16
TP#8 TP#8 Inicial 11.00 11.00 0.50 2 1.9 2 1.52 0.83 0.38 0.33 7.534 6.25 0.30 0.01 -0.15 -0.16
TP#9 TP#9 Inicial 16.30 16.30 0.73 2 1.9 2 1.52 0.83 0.38 0.48 8.534 7.08 0.30 0.01 -0.15 -0.16
TP#10 TP#10 Inicial 12.50 12.50 0.56 2 1.9 2 1.52 0.83 0.38 0.37 9.534 7.91 0.30 0.01 -0.15 -0.16
TP#11 TP#11 Inicial 12.00 12.00 0.54 2 1.9 2 1.52 0.83 0.38 0.36 10.534 8.74 0.30 0.01 -0.15 -0.16
TP#12 TP#12 Inicial 17.32 17.32 0.78 2 1.9 2 1.52 0.83 0.38 0.51 11.534 9.57 0.30 0.01 -0.15 -0.16
TP#13 TP#13 Inicial 17.36 17.36 0.78 2 1.9 2 1.52 0.83 0.38 0.51 12.534 10.40 0.30 0.01 -0.15 -0.16
Q=CxIxA
Q= CAUDAL POR BAJANTE: (lts/seg) TIPO 1
C=COEFICIENTE DE IMPERMEABILIDAD: 0.9 C Cubiertas MATERIAL PVC
I=INTENSIDAD DE LA LLUVIA: 180.3 (mm/hora) C MANINNI 0.01
A=AREA TRIBUTARIA: (m2)

Sector Coeficiente de Impermeabilidad o Escorrentía (C) C


1. Cubiertas 0.90
2. Pavimentos asfálticos y superficies de concreto 0.90
3. Zonas comerciales o industriales. 0.90
4. Residencial, con casas contiguas, predominio de zonas duras 0.75
5. Residencial multifamiliar, con bloques contiguos y zonas duras entre estos 0.75
6. Residencial unifamiliar, con casas contiguas y predominio de jardines 0.60
7. Residencial, con casas rodeadas de jardines o multifamiliares apreciablemente separados 0.45