The sealing plastic caps should remain In certain countries the authorities demand
in place as supplied by the factory until that the valves are calibrated at least
immediately before installation. This once a year (please refer to local rules and
is a precaution to prevent dirt or foreign regulations). After adjustment of the
debris from entering the valve. set pressure in the factory, the valves are
sealed. Danfoss can only guarantee correct
The relief valve should be connected as operation, as long as the seal remains
close as possible to the pressure vessel unbroken. Danfoss does not recommend
while remaining above the refrigerant that the relief valves settings be adjusted or
liquid level. changed in the field.