400 V Date : 06/07/2020 - 12/07/2020
Unit PC section 1B
489729493.docxwahid Page 3 of 43
Station PC A
Station PC 1B
Emergency PC unit 1B
489729493.docxwahid Page 4 of 43
Emergency PC unit 1A
Emergency
lightning MCC
489729493.docxwahid Page 5 of 43
Maintenance MCC in main building
Emergency PC unit 2B
Emergency PC unit 2A
489729493.docxwahid Page 6 of 43
unit PC section 2A
Unit PC section 2B
6 kV Date : 06/07/2020 - 12/07/2020
489729493.docxwahid Page 7 of 43
Metal enclosed swichgear 6 kV section 1B
489729493.docxwahid Page 8 of 43
Metal enclosed swichgear 6 kV section 2A from
Normal Power Unit Auxiliary Transformer
489729493.docxwahid Page 9 of 43
Metal enclosed swichgear 6 kV section 2B
489729493.docxwahid Page 10 of 43
Emergency Date : 06/07/2020 - 12/07/2020
Diesel
Generator
489729493.docxwahid Page 11 of 43
489729493.docxwahid Page 12 of 43
#2 DC 220 V Date : 06/07/2020 - 12/07/2020
and UPS
489729493.docxwahid Page 13 of 43
489729493.docxwahid Page 14 of 43
MCC for Date : 06/07/2020 - 12/07/2020
Turbine unit
#1
489729493.docxwahid Page 15 of 43
MCC for Date : 06/07/2020 - 12/07/2020
Turbine unit
#2
489729493.docxwahid Page 16 of 43
#1 excitation Date : 06/07/2020 - 12/07/2020
Transformer
489729493.docxwahid Page 17 of 43
Temperature Normal, Fuse normal, PT
condition normal NGR switch close
position )
Potential Transformer
Surge Arrester
489729493.docxwahid Page 18 of 43
Potential Transformer
Surge Arrester
489729493.docxwahid Page 19 of 43
380 MCC Date : 11/07/2020
489729493.docxwahid Page 20 of 43
Bulcolz Relay in SST Transformer leakage
indication
489729493.docxwahid Page 21 of 43
Silica Gel GT 1 Temperature line R,S,T
Gen to GT1
489729493.docxwahid Page 22 of 43
Oil and winding conservator tank Oil
Temperature GT2 level GT2 Inspection and Checking in local
silica gel, oil tank Transformator,
GT relay bulcolz, Tap changer GT:
9 temperature winding, oil
temperature, Fan Normal, bushing
normal, silica Gel, normal and
nothing indication Fault )
489729493.docxwahid Page 23 of 43
Silica Gel GT 2
489729493.docxwahid Page 24 of 43
1# excitation Date : 06/07/2020 - 12/07/2020
489729493.docxwahid Page 25 of 43
GIS 150 kV Date : 06/07/2020 - 12/07/2020
489729493.docxwahid Page 26 of 43
SF6 in line 02DS3 and 02ES3
Relay room Date : 06/07/2020 - 12/07/2020
150 kv M
protection inspection Check in local area Relay
Room 150kv CubicleJ0APS01
SCMCS #1 (TELECONTROL &
COMMON COMMUNICATION)
And Cubicle J0APS02 SCMS #2
(COMMOM DIVICE) BUSBAR
(Nothing indication alarm)
489729493.docxwahid Page 27 of 43
Inspection Check local area Relay
Room 150kv Cubicle J0APS03
SCMCS #3 (CB OF GT ) and Cubicle
J0APS05 SCMCS #5 CUBICLE
(150KV OUTGOING )
(Nothing indication alarm)
489729493.docxwahid Page 28 of 43
Inspection and check MCC for relay
room 150 kV J0BLB (load at MCC
normal, ATS normal, voltage normal,
power incoming
489729493.docxwahid Page 29 of 43
Water Date : 06/07/2020 - 12/07/2020
treatment
489729493.docxwahid Page 30 of 43
Water Treatment PC section B
489729493.docxwahid Page 31 of 43
Service water Date : 06/07/2020 - 12/07/2020
pump
489729493.docxwahid Page 32 of 43
Note :Found a puddle of water on the
MCC 380 V service water pump cable
track
489729493.docxwahid Page 33 of 43
ESP and Ash Handling PC Section 1B
489729493.docxwahid Page 34 of 43
Inspection and check in local MCC for
ESP 2B, (Transformer winding
Temperature normal, Fan Function
Normal, room temperature Normla,
Not indication fault alarm in MCC,
power incoming working, CB close
position, Voltage and current normal
condition)
489729493.docxwahid Page 35 of 43
FGD MCC Date : 06/07/2020 - 12/07/2020
489729493.docxwahid Page 36 of 43
Circulating Date : 06/07/2020 - 12/07/2020
Water Pump
house MCC
489729493.docxwahid Page 37 of 43
1# Generator Date : 06/07/2020 - 12/07/2020
House
489729493.docxwahid Page 38 of 43
2 #Generator Date : 06/07/2020 - 12/07/2020
House
489729493.docxwahid Page 39 of 43
CCR Date : 06/07/2020 - 12/07/2020
ECS unit 1
489729493.docxwahid Page 40 of 43
DCS unit 2
ECS unit 2
489729493.docxwahid Page 41 of 43
Side incoming power Station PC A gateway ATS
input/exit open and gateway autorecovery input exit
open
489729493.docxwahid Page 42 of 43