HAZOP ACTION SHEET

Project Title Yanbu Phase 3 Power & Desalination Plant Interfaces


P&ID Drawing No 455-00-DT-M-10250 Sheet 5 of 15
71-GDH-MFB-001
HAZOP Title MP Steam Export
KKS No NAE

Item No: 005

Responsible Person:

Part of System/ Supply to vacuum system More temperature


Parameter:

Action Recommended: Clarify impact to MSF in event of spurious malfunction of temperature element
71GDH01CT001 and requirement for redundant instrumentation.

Engineer Proposal: MP steam temperature transmitter on the header will be used for redundant use.
There are three (3) MP steam temperature transmitter on the supply header.
Please refer to the revised P&ID no. 71-GDH-MFB-001.

Final Clarification: SWCC/Fichtner comments (23.04.2015):


Noted. Item closed.

Additional Comments:

Item Closed Signed Date


Engineer Technical Project Manager

Client Technical Project Manager