5 Tri Purnami ADIDAS F2002JKTM501 1 0.06 88.33 36,600 261 19,901 22,398 107,026 107,026 8.7% $ 5.30 7.6% $ 567,216.39 11.4% 61.2%
(shift Malam)
Roma (Shift
HL1 ADIDAS F2002JKTM503 135 0.06 128.34 19,200 603 19,577 38,239 165,045 165,045 13.4% $ 7.70 11.0% $ 1,270,912.52 25.6% 122.6%
Malam)
Wahyuningsih/
HL2 Joko (Shift ADIDAS SMUS2015M050 1 0.06 33.21 19,440 529 28,130 33,000 111,050 39,697 3.2% $ 1.99 2.9% $ 79,100.24 1.6% 19.2%
Malam)
Wahyuningsih
HL4 ADIDAS SMUS2015M050 1 0.06 33.21 19,440 298 28,130 33,000 111,050 39,697 3.2% $ 1.99 2.9% $ 79,100.24 1.6% 19.2%
(Shift Malam)
Nanik (Shift
HL6 ADIDAS SMUS2015M052 11 0.06 24.90 21,600 22,501 38,301 225,000 71,499 5.8% $ 1.49 2.1% $ 106,819.51 2.2% 54.0%
Malam)
0.0%
1,235,403 $ 69.78 100.0% $ 4,957,790.42 100.0%
140.0%
INPUT SMV
Buyer CM Rate
ACTUAL (%)
Adidas 0.06
120.0% TNF 0.07
Columbia 0.05
Ralph Laurent 0.04
Tommy 0.04
100.0%
80.0%
60.0%
40.0%
20.0%
0.0%
1 0 2 0 0 1 05 3 0 2 0 0 2 0
05 05 05 05 05 50 10 50 05 50 05 05 05 05
M M M M M M TM 5M TM 5M 5M 5M 5M 5M
01
5
01
5
01
5
01
5
01
5
JKT SBM
JK 0 1 JK 0 1 0 1 0 1 0 1 01
2 2 2 2 2 02 20 02 S2 02 S2 S2 S2 S2 S2
US US US US US F2
0 F
F2
0 U F2
0 U U U U U
SM SM SM SM SM SM SM SM SM SM SM
Current Operators
Production Cell Location -
(Seconds / Garment)
Production Rate
Machine Type/
Process Cycle
WIP Inventory
Thread Color
Future State
Operations
Production Rate /
Combined
Time (Sec.)
Station
(Ea)
(Pieces)
SMSUS2015M050 Time / Production
Rate
NORMAL JACKET
Operation Description 0
Totals 1407 35 75.0 1584
50 48 48
50 43 45 43
42
40
30
20
10
0
13
15
17
19
21
25
27
28
29
35
2
10
14
18
23
31
34
Operation
TARGET / Hr : 56.25 TAKT TIME : 64.00
OPERATOR : 36 TARGET EFF :
JAM KERJA : 8 EFISIENSI BEFORE : 74.15%
OUTPUT : 754 EARNING : $ 45,393.08
Menggunakan 2
operator namun di data
hanya 1 operator
Menggunakan 2 operator
untuk mengerjakan proses
kanan dan kiri, namun
pada data hanya 1 proses
dan 1 operator
Penambahan 1 proses
yang tidak ada di data
namun actualnya ada
Menggunakan 2
operator untuk ct
dibawah takt time
Menggunakan 2 operator
untuk proses ol inside
Menggunakan 4 hemming
operator untuk ct Menggunakan 2 operator
Menggu
dengan ct yang tidak
melebihi takt time, nakan 2
namun operator sering melebihi takt time
operator
nganggur untuk ct
dibawah
tack
Menggunakan 2 time,
operator untuk ct namun
dibawah takt time didata
menggu
nakan
Menggunakan 2
operator untuk ct
melebihi takt time,
namun operator sering
nganggur
Menggunakan 3
operator untuk ct
melebihi takt time,
namun operator sering
nganggur
Menggunakan 2
operator untuk ct
dibawah takt time
Analisis Sewing 1518.072 BUYER : ADIDAS SMV BEFORE : 22.9258 OPERATOR
Factory : PRIMA 3 STYLE : F2025M9478SMV AFTER : 25.3012 OPERATOR
LINE : HL 5 TARGET : 450.00 JAM KERJA
SMV ERP : 17.00 TARGET / Hr : 56 OUTPUT BE
Actual Time Study (Sec) Operator
No Process Problem Action Plan
Before (sec) After (sec) Reduction time (sec) Before Afte
7 cut allawance front zip proses tidak ada di data menambahkan proses dengan ct 47 0 47 -47 1 1
OPERATOR BEFORE : 36 OUTPUT AFTER : 569.14 EARNING BEFORE : $ 45,393.08
OPERATOR AFTER : 30 TAKT TIME : 64EARNING AFTER : $ 50,096.38
JAM KERJA : 8 EFISIENSI BEFORE : 74.15%
OUTPUT BEFORE : 754 EFISIENSI AFTER : 67.19%
Operator Impact Effisiensi Video
Keterangan
After Process Operator After Before
Rate (Seconds
Operations
Production
Cycle Time
Production Rate /
Combined
Inventory
Machine
/ Garment)
Process
Current
Station
Operators
(Pieces)
Type/
SMSUS2015M050
(Sec.)
WIP
(Ea)
Time / Production
Rate
NORMAL JACKET
Operation Description 0
Totals 1407 29 75.0 1584
2 SNC Cut separate front body 30 1 30.0 120 0
3 OM4 Join sleeve ragland front 50 1 50.0 72 0
4 OM4 Join sleeve ragland back 45 1 45.0 80 0
5 OM4 Join side panel to back sleeve 53 1 53.0 68 0
6 OM4 Join side panel to front sleeve 75 1 75.0 48 0
7 OM4 Join lower to upper sleeve 48 1 48.0 75 0
8 SNL Att care label + tack sideseam 51 1 51.0 71 0
9 OM4 Join sideseam 66 1 66.0 55 0
10 SNL 11 Join hood to body+att zip match collar 97 2 48.5 37 0
13 OM3 Overlock inside collar 59 1 59.0 61 0
14 SNL Tack rib cuff to sleeve 57 1 57.0 63 0
15 SNL 16 Tacking WB to hem 64 1 64.0 56 0
17 OM4 Overlock mid WB front 51 1 51.0 71 0
18 OM4 Join rib cuff to sleeve 48 1 48.0 75 0
19 DLN 20 Tack end off hem+att zip to match hem 123 2 61.5 29 0
21 DLN Att binding to front zipper 62 2 31.0 58 0
23 SNL Tack fold neck hood 60 1 60.0 60 0
25 SNF 26 Att tape inside neckline 43 1 43.0 84 0
27 SNL Att size label + loop to collar 55 1 55.0 65 0
28 BTK Bartack side pocket + front zip 56 1 56.0 64 0
29 OM4 30 Join WB to hem 48 2 24.0 75 0
31 DLN 32.33 Stitch 1/16 neck collar+front zipper 48 2 24.1 75 0
34 BTK Insert drawcord + bartack inside 55 1 55.0 65 0
35 SNL Stitch label + tack end zip 63 1 63.0 57 0
36 SNC cut allawance front zip 47 1 47.0 77 0
30 1265.1
15
17
19
21
25
27
31
2
10
14
18
23
28
29
34
35
Operation
OPERATOR BEFORE : 36 OUTPUT AFTER : 569.14 EARNING BEFORE : $ 45,393.08
OPERATOR AFTER : 30 TAKT TIME : 64.00 EARNING AFTER : $ 50,096.38
JAM KERJA : 8 EFISIENSI BEFORE : 74.15%
OUTPUT BEFORE : 754 EFISIENSI AFTER : 67.19%