You are on page 1of 4

Prebid(Manjha Bypass)

8% CBR
As per Design
As per Design at
As per DPR at Normal
Tight Conditions
Conditions
BC 30 30 40 30 30
DBM 90 90 65 80 Adopted 70
WMM 250 250 250 250 crust
GSB 200 200 200 200
Adopted
Overlay
10% CBR
As per Design
As per Design at
As per DPR at Normal
Conditions Tight Conditions

BC 40 40 40
DBM 70 70 60
WMM 250 250 250
GSB 200 200 200
Thicknesses taken same as per Schedule.
PCC changed