Professional Documents
Culture Documents
(CODE: 07340)
SUBMITTED BY:
JOREN ALEONA G. ALEGRE
KARMALLA Q. MADAMBA
SUBMITTED TO:
ENGR. MARIA CYNTHIA DONITA M. VILLASENCIO
DATE SUBMITTED:
MARCH 26, 2020
DESIGN PROPOSAL OF MANDUG RIVER SLOPE PROTECTION IN
BRGY. MANDUG, BUHANGIN DISTRICT
Project Preliminary Detailed Engineering for the Conduct of
Topographic and Hydrophic Survey of Davao River
MANDUG TRIBUTARY
Existing Ground:
DTM -6 16.80 Ground
-5 16.60 Ground
-4 13.00 Water
-3 12.98 Water
-2 12.80 Water
-1 12.70 Water
0 12.50 CL
1 12.60 Water
2 12.70 Water
3 12.80 Water
4 12.90 Water
5 16.80 Ground
6 16.82 Ground
0+100
Existing Ground:
DTM -6 17.40 Ground
-5 17.20 Ground
-4 17.10 Ground
-3 15.60 Water
-2 15.50 Water
-1 15.20 Water
0 15.10 CL
1 15.15 Water
2 15.20 Water
3 15.25 Water
4 17.60 Ground
5 17.75 Ground
6 17.80 Ground
Station Offset Elevation Description
0+200
Existing Ground:
-6 18.10 Ground
DTM
-5 18.05 Ground
-4 18.00 Ground
-3 16.80 Water
-2 16.75 Water
-1 16.70 Water
0 16.70 CL
1 16.70 Water
2 16.70 Water
3 16.75 Water
4 16.80 Water
5 18.40 Ground
6 18.50 Ground
0+300
Existing Ground:
-6 20.00 Ground
DTM
-5 20.00 Ground
-4 20.00 Ground
-3 18.00 Water
-2 17.99 Water
-1 17.95 Water
0 17.80 CL
1 17.85 Water
2 17.90 Water
3 17.90 Water
4 20.00 Ground
5 20.00 Ground
6 20.10 Ground
0+400
Existing Ground:
-6 20.00 Ground
DTM
-5 20.00 Ground
-4 18.00 Water
-3 17.95 Water
-2 17.90 Water
-1 17.85 Water
0 17.80 CL
1 17.85 Water
2 17.90 Water
3 17.95 Water
4 17.97 Water
5 20.00 Ground
6 20.10 Ground
Station Offset Elevation Description
0+500
Existing Ground:
-6 20.20 Ground
DTM
-5 20.20 Ground
-4 17.80 Water
-3 17.75 Water
-2 17.70 Water
-1 17.65 Water
0 17.60 CL
1 17.65 Water
2 17.70 Water
3 17.75 Water
4 17.80 Water
5 20.10 Ground
6 20.20 Ground
0+600
Existing Ground:
-6 20.80 Ground
DTM
-5 20.75 Ground
-4 18.70 Water
-3 18.60 Water
-2 18.50 Water
-1 18.40 Water
0 18.30 CL
1 18.40 Water
2 18.50 Water
3 18.60 Water
4 18.70 Water
5 20.80 Ground
6 20.90 Ground
0+700
Existing Ground:
-6 21.90 Ground
DTM
-5 21.90 Ground
-4 21.90 Ground
-3 19.90 Water
-2 19.80 Water
-1 19.70 Water
0 19.60 CL
1 19.70 Water
2 19.80 Water
3 19.90 Water
4 22.00 Ground
5 22.00 Ground
6 22.00 Ground
Station Offset Elevation Description
0+800
Existing Ground:
-6 22.60 Ground
DTM
-5 22.00 Water
-4 21.90 Water
-3 19.90 Water
-2 19.80 Water
-1 19.70 Water
0 19.60 CL
1 19.70 Water
2 19.80 Water
3 19.90 Water
4 22.80 Ground
5 22.80 Ground
6 22.85 Ground
0+900
Existing Ground:
-6 22.20 Ground
DTM
-5 21.00 Water
-4 19.60 Water
-3 19.60 Water
-2 19.60 Water
-1 19.60 Water
0 19.60 CL
1 19.60 Water
2 19.65 Water
3 19.70 Water
4 19.75 Water
5 19.80 Water
6 22.85 Ground
1+000
Existing Ground:
-6 23.20 Ground
DTM
-5 23.10 Ground
-4 22.50 Water
-3 21.70 Water
-2 21.60 Water
-1 21.50 Water
0 21.30 CL
1 21.40 Water
2 21.60 Water
3 21.70 Water
4 23.20 Ground
5 23.30 Ground
6 23.40 Ground
Station Offset Elevation Description
1+100
Existing Ground:
-6 24.20 Ground
DTM
-5 24.00 Water
-4 23.10 Water
-3 22.80 Water
-2 22.50 Water
-1 22.40 Water
0 22.30 CL
1 22.30 Water
2 22.30 Water
3 22.50 Water
4 22.50 Water
5 24.40 Ground
6 24.50 Ground
1+200
Existing Ground:
-6 27.20 Ground
DTM
-5 27.10 Ground
-4 25.20 Water
-3 24.00 Water
-2 23.90 Water
-1 23.80 Water
0 23.60 CL
1 23.70 Water
2 23.80 Water
3 24.00 Water
4 26.00 Water
5 26.20 Ground
6 26.40 Ground
1+300
Existing Ground:
-6 27.50 Ground
DTM
-5 26.80 Water
-4 25.00 Water
-3 23.80 Water
-2 23.80 Water
-1 23.80 Water
0 23.80 CL
1 23.75 Water
2 23.70 Water
3 23.65 Water
4 27.40 Ground
5 27.40 Ground
6 27.40 Ground
STATION 0+000
STATION 0+000
STATION 0+100
STATION 0+200
STATION 0+300
STATION 0+400
STATION 0+500
STATION 0+600
STATION 0+700
STATION 0+800
STATION 0+900
STATION 1+000
STATION 1+100
STATION 1+200
STATION 1+300
MANDUG TRIBUTARY
Existing Ground:
DTM -14.4 22.23 Ground
-14.1 22.23 Ground
-10.4 19.21 Riprap
-10.1 19.21 Riprap
-6.4 16.50 Bank
-6.1 16.50 Bank
-3 15.60 Water
-2 15.50 Water
-1 15.20 Water
0 15.10 CL
1 15.15 Water
2 15.20 Water
3 15.25 Water
6.1 16.50 Bank
6.4 16.50 Bank
10.1 19.21 Riprap
10.4 19.21 Riprap
14.1 22.23 Ground
14.4 22.23 Ground
0+200
Existing Ground:
DTM -15.4 25.90 Ground
-15.1 25.90 Ground
-10.75 22.30 Riprap
-10.45 22.30 Riprap
-6.1 18.70 Bank
-5.8 18.70 Bank
-3 16.80 Water
-2 16.75 Water
-1 16.70 Water
0 16.70 CL
1 16.70 Water
2 16.70 Water
3 16.75 Water
5.8 18.70 Bank
6.1 18.70 Bank
10.45 22.30 Riprap
10.75 22.30 Riprap
15.1 25.90 Ground
15.4 25.90 Ground
Station Offset Elevation Description
0+300
Existing Ground:
DTM -15.9 27.70 Ground
-15.6 27.70 Ground
-9.2 24.20 Riprap
-8.9 24.20 Riprap
-4.5 20.60 Bank
-4.2 20.60 Bank
-3 18.00 Water
-2 17.99 Water
-1 17.95 Water
0 17.80 CL
1 17.85 Water
2 17.90 Water
3 17.90 Water
4.2 20.60 Bank
4.5 20.60 Bank
8.9 24.20 Riprap
9.2 24.20 Riprap
15.6 27.70 Ground
15.9 27.70 Ground
0+400
Existing Ground:
DTM -15.1 27.80 Ground
-14.8 27.80 Ground
-10.4 24.20 Riprap
-10.1 24.20 Riprap
-5.7 20.65 Bank
-5.4 20.65 Bank
-4 18.00 Water
-3 17.95 Water
-2 17.90 Water
-1 17.85 Water
0 17.80 CL
1 17.85 Water
2 17.90 Water
3 17.95 Water
4 17.97 Water
5.4 20.65 Bank
5.7 20.65 Bank
10.1 24.20 Riprap
10.4 24.20 Riprap
14.8 27.80 Ground
15.1 27.80 Ground
Station Offset Elevation Description
0+500
Existing Ground:
DTM -15.15 28.00 Ground
-14.85 28.00 Ground
-10.45 24.10 Riprap
-10.15 24.10 Riprap
-5.8 20.50 Bank
-5.5 20.50 Bank
-4 17.80 Water
-3 17.75 Water
-2 17.70 Water
-1 17.65 Water
0 17.60 CL
1 17.65 Water
2 17.70 Water
3 17.75 Water
4 17.80 Water
5.5 20.50 Bank
5.8 20.50 Bank
10.15 24.10 Riprap
10.45 24.10 Riprap
14.85 28.00 Ground
15.15 28.00 Ground
0+600
Existing Ground:
DTM -15.1 28.50 Ground
-14.8 28.50 Ground
-10.45 25.00 Riprap
-10.15 25.00 Riprap
-5.65 21.40 Bank
-5.35 21.40 Bank
-4 18.70 Water
-3 18.60 Water
-2 18.50 Water
-1 18.40 Water
0 18.30 CL
1 18.40 Water
2 18.50 Water
3 18.60 Water
4 18.70 Water
5.35 21.40 Bank
5.65 21.40 Bank
10.15 25.00 Riprap
10.45 25.00 Riprap
14.8 28.50 Ground
15.1 28.50 Ground
Station Offset Elevation Description
0+700
Existing Ground:
DTM -14.1 29.80 Ground
-13.8 29.80 Ground
-9.45 26.30 Riprap
-9.15 26.30 Riprap
-4.8 22.60 Bank
-4.5 22.60 Bank
-3 19.90 Water
-2 19.80 Water
-1 19.70 Water
0 19.60 CL
1 19.70 Water
2 19.80 Water
3 19.90 Water
4.5 22.60 Bank
4.8 22.60 Bank
9.15 26.30 Riprap
9.45 26.30 Riprap
13.8 29.80 Ground
14.1 29.80 Ground
0+800
Existing Ground:
DTM -15.15 29.90 Ground
-14.85 29.90 Ground
-10.45 26.30 Riprap
-10.15 26.30 Riprap
-5.8 22.80 Bank
-5.5 22.80 Bank
-3 19.90 Water
-2 19.80 Water
-1 19.70 Water
0 19.60 CL
1 19.70 Water
2 19.80 Water
3 19.90 Water
5.5 22.80 Bank
5.8 22.80 Bank
10.15 26.30 Riprap
10.45 26.30 Riprap
14.85 29.90 Ground
15.15 29.90 Ground
Station Offset Elevation Description
0+900
Existing Ground:
DTM -15.2 29.95 Ground
-14.9 29.95 Ground
-10.45 26.00 Riprap
-10.15 26.00 Riprap
-5.8 22.30 Bank
-5.5 22.30 Bank
-4 19.60 Water
-3 19.60 Water
-2 19.60 Water
-1 19.60 Water
0 19.60 CL
1 19.60 Water
2 19.65 Water
3 19.70 Water
4 19.75 Water
5.5 22.30 Bank
5.8 22.30 Bank
10.15 26.00 Riprap
10.45 26.00 Riprap
14.9 29.95 Ground
15.2 29.95 Ground
1+000
Existing Ground:
DTM -15.4 30.80 Ground
-15.1 30.80 Ground
-10.75 27.20 Riprap
-10.45 27.20 Riprap
-6.1 23.60 Bank
-5.8 23.60 Bank
-3 21.70 Water
-2 21.60 Water
-1 21.50 Water
0 21.30 CL
1 21.40 Water
2 21.60 Water
3 21.70 Water
5.8 23.60 Bank
6.1 23.60 Bank
10.45 27.20 Riprap
10.75 27.20 Riprap
15.1 30.80 Ground
15.4 30.80 Ground
Station Offset Elevation Description
1+100
Existing Ground:
DTM -14.9 31.75 Ground
-14.6 31.75 Ground
-10.2 28.20 Riprap
-9.9 28.20 Riprap
-5.6 24.60 Bank
-5.3 24.60 Bank
-2 22.50 Water
-1 22.40 Water
0 22.30 CL
1 22.30 Water
2 22.30 Water
5.3 24.60 Bank
5.6 24.60 Bank
9.9 28.20 Riprap
10.2 28.20 Riprap
14.6 31.75 Ground
14.9 31.75 Ground
1+200
Existing Ground:
DTM -14.25 32.60 Ground
-13.95 32.60 Ground
-10.25 27.60 Riprap
-9.95 27.60 Riprap
-6.3 26.65 Bank
-6 26.65 Bank
-2 23.90 Water
-1 23.80 Water
0 23.60 CL
1 23.70 Water
2 23.80 Water
6 26.65 Bank
6.3 26.65 Bank
9.95 27.60 Riprap
10.25 27.60 Riprap
13.95 32.60 Ground
14.25 32.60 Ground
Station Offset Elevation Description
1+300
Existing Ground:
DTM -15.45 33.10 Ground
-15.15 33.10 Ground
-11.5 30.00 Riprap
-11.2 30.00 Riprap
-6.8 26.40 Bank
-6.5 26.40 Bank
-3 23.80 Water
-2 23.80 Water
-1 23.80 Water
0 23.80 CL
1 23.75 Water
2 23.70 Water
3 23.65 Water
6.5 26.40 Bank
6.8 26.40 Bank
11.2 30.00 Riprap
11.5 30.00 Riprap
15.15 33.10 Ground
15.45 33.10 Ground
End Segment-A
GROUTED RIPRAP
VARIABLE
0.30m
0.30 m
3.00 m
m INTERVAL
GROUTED RIPRAP
1
EMBANKMENT
75 mmØ PVC WEEPHOLE STAGGERED AT 2.0
0.30m m INTERVAL
0.600m
4 - 20 mmØ REINFORCING STEEL BARS W/
10mmØ TIES SPACED AT 0.40 m O.C.
32
30
28
26
ELEV 21.80m
ELEV 21.80m
24
1 1
1 W.S. 1
1 1
22 ELEV 18.80m
1 1
ELEV 18.80m
1 1
1
20 1 1
1 W.S.
1 ELEV 15.70m
1 ELEV 15.70m
18
4
1 NATU
RAL
GRAD RIVER BED
NATURAL GRADE LINE E LIN
1 E
1 1
16
14
4 Cross Section
RIVER BED
1
12
10
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+000m
32
30
28
ELEV 22.3m
ELEV 22.3m
26 W.S.
1
1
1
24 1 ELEV 19.21m ELEV 19.21m 1
1
1
1
1
22 W.S. 1
1
1
ELEV 16.5m
1 ELEV 16.5m
1
20 1 RIVER BED 1
1 3
3
1
18 1
NATURAL GRADE LINE NATUR
AL GR
ADE LIN
E
1
16
1
RIVER BED
3
Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+100m
32
30
28
ELEV 25.9m
26 ELEV 25.9m
1 1
1 W.S. W.S.
24 W.S. 1 1
1 1
1
1 1
ELEV 22.3m
1
1 ELEV 22.3m
22 1 1
1 1
1 ELEV 18.7m
20
1 ELEV 18.7m
1 1
1 1
RIVER BED
16
Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+200m
32
30
28
ELEV 20.60m
ELEV 20.60m
4 4
RIVER BED
4 1 1
RIVER BED
18
1
16
Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+300m
32
30
28 ELEV 27.8m
ELEV 27.8m
W.S.
1 W.S.
26 1 1
1 1 1
1 1 1
1 1 1
ELEV 24.2m
24 ELEV 24.2m
1 1
1 1 1
ELEV 20.65m
22 1
ELEV 20.65m
4 4
RIVER BED
20 NATURAL GRADE LINE
1 1
4
RIVER BED
18
1
16 Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+400m
32
30
28
W.S.
ELEV 28.0m
ELEV 28.0m
W.S.
26 1
1
1 1
1 1
1
1 ELEV 24.1m
1
24
ELEV 24.1m
22 1
1 1
ELEV 20.50m
ELEV 20.50m
RIVER BED
1
18
RIVER BED
16
Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+500m
32
30
ELEV 28.50m
28 W.S. ELEV 28.50m
W.S.
1 1 1
1 1 1
1
26 1 1
1 ELEV 25.0m 1
1 ELEV 25.0m
1 1
24
1 1
1
ELEV 21.4m
1 ELEV 21.4m
22 3 3
1 1
NATURAL GRADE LINE
3 RIVER BED
20
1
RIVER BED
18
Cross Section
16
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+600m
32
30
1
28 W.S. ELEV 29.8m
ELEV 29.8m
1
1
1 1 W.S.
1
26 1 1
1 1
1 ELEV 26.3m 1
1 ELEV 26.3m
24 1 1 1
1 1
1 1
1
RIVER BED
20 RIVER BED
18
16
Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+700m
32
30 W.S.
1
28
1
1
1
26 ELEV 29.9m ELEV 29.9m
W.S.
1 1
1
24
1 1
1
1
1
1
1
ELEV 26.3m
ELEV 26.3m
22
NATURAL GRADE LINE 1
3 1
1
1
ELEV 22.8m
1
20 3
RIVER BED ELEV 22.8m
3
1
1
RIVER BED
18
16
14
Cross Section
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 0+800m
32
30 W.S.
28
1
1
1
1
26
24
1 ELEV 29.95m ELEV 29.95m
W.S.
1
NATURAL GRADE LINE
22
3 1 1
1
1 1
1 1
1
20 ELEV 26.0m
ELEV 26.0m
RIVER BED
1 1
18 ELEV 22.3m
1 ELEV 22.3m 1
3 3
16 1
1
RIVER BED
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Cross Section
Station 0+900m
32
30 W.S.
1
1
1 ELEV 30.8m
28 ELEV 30.8m
1
W.S.
1 1
26
1 1
1 1
1
1 1 ELEV 27.2m
1
ELEV 27.2m
24
1 1
20
18
16 Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 1+000m
32
W.S.
1
30
1
1
1
28
1
ELEV 31.75m
26 1
ELEV 31.75m
W.S.
1 1
NATURAL GRADE LINE
24 1
1 1 1
1
1 1 ELEV 28.2m 1
RIVER BED
ELEV 28.2m
22 1 1
1 1
ELEV 24.6m
ELEV 24.6m
20
1 1
1 1
RIVER BED
18
16
Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 1+100m
32
1
W.S.
1
30 1
1
1
28
26 ELEV 32.6m
ELEV 32.6m
1
1 1
1 W.S.
24 RIVER BED 1 1
1 ELEV 27.6m 1
1 ELEV 27.6m 1
1 1
22 1
1
ELEV 26.65m
ELEV 26.65m
20 1 1
1 1
RIVER BED
18
16
Cross Section
14
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 1+200m
W.S.
32
1
1
1
30
1
1
28 1
NATUR
AL GR
NATURAL GRADE LINE ADE LIN
E
26
24
1 ELEV 33.10m
RIVER BED
ELEV 33.10m W.S.
22 1 1
1 1
1 ELEV 30.0m 1
ELEV 30.0m
1 1
20 1 1
ELEV 26.4m
ELEV 26.4m
18
1 1
1 1
16
14
Cross Section
12
-26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0
Station 1+300m