1 05.00 PM Flexural Machine Calibration Bapatla Base Camp 10.00am
1 05.00 PM Flexural Machine Calibration Bapatla Base Camp 10.00am
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV through
Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 30.06.20
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item FROM TO Side RFI Status Remarks
Date Time Date Time
1 REP/NH-216/QC/235 30.06.20 05.00 pm Flexural machine calibration Bapatla Base camp 01.07.20 10.00am
Government of India (Ministry of Road Tra
Through
Roads & Buildings Department ( Nation
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to tw
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd
RFI Submission
Sl.No RFI NO.
Date Time
Sample Collection of
BA.NO.25 (70%) & BA.NO.06 (30%) 135+980 LHS 10.09.2020
blended material from Stockyard No.23
State of Andhra Pradesh under NHDP –IV through
Date 10.09.2020
RFI Inspection
RFI Status Remarks
Time
02.30 pm